SESAR Project 5.6.6 -ASAS Sequencing and Merging
• Operational concept definition (OSED)
• V&V activities (validation plan, validation exercises with ATCOs and flight crews)
• Prototype verification plan ( SESAR P 10.3.2)
Validation activities for Surveillance systems, Safety nets (TCAS, STCA) and ADS-B applications (ATSAW, ATSA-SURF, ASAS S&M)
ATC system definitions - Operational requirements consolidation for the French ANSP (DSNA/DTI)
• ATC Operational and functional needs consolidation
• Operational requirements definition
Sogeti High Tech
- Ingénieur d'essais
TOULOUSE2005 - 2008Cockpit Test engineer for AIRBUS FRANCE – SIMULATION FLIGHT
• Testing cockpit HMI in operational context for Human Factor certification finality, on AIRBUS Cockpit Simulators (A380, A340, A330, A320, A350),
o Preparation and follow –up of evaluations of new functions based on TCAS, FMS, navigations aids,
o Simulating air traffic environment (and control) for Airbus virtual flight,
• Test need collection and specification,
o Managing development of test facilities (on aircraft simulator), testing and analyzing,
• Project managing, including scheduling resources.