-
Blackcat-Qatar Petroleum
- Testing & Commissioning Manager
2012 - maintenant
Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety College Project (RLESC: 460 Million $ Project -26 Million $ Telecom Project):
* RLESC Project Precommissioning and Commissioning Manager:
25 Multi-National Leaders and Assitants Management, (Instrumentation, Piping, Electrical, Mechanical, HVAC, Telecom, ICAPS, DCR, Planning) and Follow-up/review of Basic/Detailed Engineering, Procedures, Precom/Com/Punch in coordination with Construction Team.
Project Handover Management.
* Management of the Logistic, IT Network, Icaps, HSE, Business Development.
* Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250 Expatriates and local workers) for the Basic and Detailed Engineering review. Installation, precommissioning, Commissioning, Hand Over for the following Telecom Systems:
- Access Control System - CCTV - Anti-Intrusion - General Alarm ;
- Atex Phone - Hotline - Intercom - VOIP
- LAN - TETRA - SDH/PDH - Entertainment - Audio Visual - FOCN - Copper Cable -SDH/PDH ;
- Meteo Station - Building Management System
* ICAPS R3 Software Telecom Data Base Management:
Operator, Population, Updating and statistics for the Precommissioning, Commissioning, punch list and Hand-over phases.
-
BLACKCAT Doha
- EPCC - Commissioning Manager & Telecom Leader
2012 - maintenant
: EPCC - Commissioning Manager & Telecom Leader Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety
College Project (RLESC: 450 Million $ Project -26 Million $ Telecom Project):
* RLESC Project Precommissioning and Commissioning Manager:
25 Leaders and Assitants Management, (Instrumentation, Piping, Electrical, Mechanical,
HVAC, ICAPS, DCR, Planning) and Follow-up/review of Basic/Detailed Engineering,
Procedures, Precom/Com/Punch in coordination with Construction Team.
Project Handover Management.
* Management of the Logistic, IT Network, Icaps, HSE, Business Development.
* Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250
Expatriates and local workers) for the Basic and Detailed Engineering review.
Installation, precommissioning, Commissioning, Hand Over for the following Telecom
Systems:
- Access Control System - CCTV - Anti-Intrusion - General Alarm ;
- Atex Phone - Hotline - Intercom - VOIP
- LAN - TETRA - SDH/PDH - Entertainment
- Audio Visual - FOCN - Copper Cable -SDH/PDH
- Meteo Station - Building Management System
* ICAPS Software Telecom Data Base Management:
Operator, Population, Updating and statistics for the Precommissioning, Commissioning,
punch list and Hand-over phases. SL-1/4
-
EPCC
- Commissioning Leader & Telecom Leader
2010 - 2012
Cegelec Abu Dhabi-Doha
Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety
College Project (RLESC: 450 Million $ Project -26 Million $ Telecom Project):
* RLESC Project Precommissioning and Commissioning Leader:
Follow-up of all Project Precom/Com/Punch statistics and Leaders Management to avoid
delays in Precom and Com phases in coordination with Construction Team.
* Commissioning Contract Management for Cegelec Abu Dhabi:
Personnel, Logistic, IT Network, HSE, Business Development.
* Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250
Expatriates and local workers) for the Basic and Detailed Engineering review.
Installation, precommissioning, Commissioning, Hand Over for the following Telecom
Systems:
- Access Control System - CCTV - Anti-Intrusion - General Alarm ;
- Atex Phone - Hotline - Intercom - VOIP
- LAN - TETRA - SDH/PDH - Entertainment
- Audio Visual - FOCN - Copper Cable -SDH/PDH
- Meteo Station - Building Management System
* ICAPS Software Telecom Data Base Management:
Population, Updating and statistics for the Precommissioning, Commissioning, punch list
and Hand-over phases + Operator.
-
EPCC
- Commissioning Leader & Telecom Leader
2010 - 2012
Cegelec Abu Dhabi-Doha
Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety College
Project (RLESC: 460 Million $ Project -26 Million $ Telecom Project):
* RLESC Project Precommissioning and Commissioning Leader:
Follow-up of all Project Precom/Com/Punch statistics and Leaders Management to avoid delays in Precom and Com phases in coordination with Construction Team.
* Commissioning Contract Management for Cegelec Abu Dhabi:
Personnel, Logistic, IT Network, HSE, Business Development.
* Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250 Expatriates and local workers) for the Basic and Detailed Engineering review. Installation, precommissioning, Commissioning, Hand Over for the following Telecom Systems:
- Access Control System - CCTV - Anti-Intrusion - General Alarm ;
- Atex Phone - Hotline - Intercom - VOIP
- LAN - TETRA - SDH/PDH - Entertainment - Audio Visual - FOCN - Copper Cable -SDH/PDH ;
- Meteo Station - Building Management System
* ICAPS R3 Software Telecom Data Base Management:
Population, Updating and statistics for the Precommissioning, Commissioning, punch list and Hand-over phases + Operator.
SL-2/4
-
Cegelec-Qatar Petroleum
- Telecom Engineer
2007 - 2010
(9000 Employees, 900 Million Euros Turnover)
Tasks in Yemen for YEMGAS(Technip)-YLNG(Total) - (4.5 Billion $ Project - 15 Million $ Telecom project):
* Management of Spie oil & Gas Subcontractor, (12 Expatriates and 35 Local Workers) for the Installation, Precommmissioning, Commissioning, Hand-over of all following Telecom Systems:
- Access Control System: - CCTV
- Atex Phone: - Hotline
- LAN: - Telecom Mast
- VHF Aero: - VHF Marine
- Radar: - Racon
- UPS: - FOCN
- Anti-Intrusion - General Alarm
- Intercom - PABX
- Trunk System: - Paging
- HF Aero: - HF Marine
- Entertainment: - TV/DSL System
- Copper Cable
* ICAPS R3 Software Telecom Data Base Management: Population, Updating and statistics for the Precommissioning, Commissioning, punch list and Hand-over periods. ;
-
SNEF Group
- Telecom Engineer
2007 - 2010
(9000 Employees, 900 Million Euros Turnover)
Tasks in Yemen for YEMGAS(Technip)-YLNG(Total) - (15 Million $ Telecom Project -
4.5 Billion $ Project):
* Management of Spie oil & Gas Subcontractor, (12 Expatriates and 35 Local Workers)
for the Installation, Precommmissioning, Commissioning, Hand-over of all following
Telecom Systems :
- Access Control System - CCTV - Anti-Intrusion - General Alarm ;
- Atex Phone - Hotline - Intercom - PABX
- LAN - Telecom Mast - Trunk System - Paging
- VHF Aero - VHF Marine - HF Aero - HF Marine
- Radar - Racon - Entertainment - TV/DSL System
- UPS - FOCN - Copper Cable
* ICAPS Software Telecom Data Base Management: Population, Updating and statistics
for the Precommissioning, Commissioning, punch list and Hand-over periods.
-
SNEF
- Ingénieur Télécom
2007 - 2010
-
None
- Sabbatical preriod
2006 - 2007
: Sabbatical period in France to build personal projects following 15 years spent abroad.
-
DIETSMANN Monaco
- Telecom Project Manager
2005 - 2005
(2500 Employees, 200 Million Euros Turnover)
Tasks in Angola for TOTAL Onshore and Offshore (4.5 Million $ / year):
* Global CSTOR Telecom Contract Management at TOTAL Luanda.
* Management of the onshore and offshore Telecom structures and teams: 8 Expatriates and 15 Local workers for the following systems:
- PABX - LAN - VHF -UHF ;
- Satellite - Microwaves: IRT2000, MDL etc... - MUX ;
- UPS - FOCN - Copper Cable
* Stock Management, Planning, Reports, Training. ;
* New Telecom Projects surveys, quotations Precommissioning and Commissioning ;
-
DIETSMANN Monaco
- Telecom Project Manager
2005 - 2005
(2500 Employees, 200 Million Euros Turnover)
Tasks in Angola for TOTAL Onshore and Offshore (4.5 Million $ / year):
* Global CSTOR Telecom Contract Management at TOTAL Luanda.
* Management of the onshore and offshore Telecom structures and teams: 8 Expatriates
and 15 Local workers for the following systems:
- PABX - LAN - VHF -UHF ;
- Satellite - Microwaves: IRT2000, MDL etc... - MUX ;
- UPS - FOCN - Copper Cable
* Stock Management, Planning, Reports, Training. ;
* New Telecom Projects surveys, quotations Precommissioning and Commissioning
-
Philips Projects Centre
- Telecom Maintenance Manager
1999 - 2005
: Telecom Maintenance Manager Philips Projects Centre
Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):
* Global Telecom Contract Management at EPNL (TOTAL) Port Harcourt, Warri, Lagos
and Abuja.
* Management of the onshore and offshore Telecom structures and teams: 3 Expatriates
and 25 Local workers for the following systems:
- PABX - LAN -VHF - UHF ;
- Microwaves: ITR2000, MDL2013, STD10 etc... - Racon ;
- Solar Systems - Back-up Generator - UPS ;
- Telecom rectifiers - Telecom Mast - Aviation Lights - Copper cable ;
- Entertainment
* Stock Management, Planning, Reports, Training. ;
* New Telecom Projects surveys, quotations Precommissioning and Commissioning
-
Philips Projects Centre
- Telecom Maintenance Manager
1999 - 2005
: Telecom Maintenance Manager Philips Projects Centre
Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):
* Global Telecom Contract Management at EPNL (TOTAL) Port Harcourt, Warri, Lagos and Abuja.
* Management of the onshore and offshore Telecom structures and teams: 3 Expatriates and 25 Local workers for the following systems:
- PABX - LAN -VHF - UHF ;
- Microwaves: ITR2000, MDL2013, STD10 etc... - Racon
- Solar Systems - Back-up Generator - UPS - Telecom rectifiers - Telecom Mast - Aviation Lights - Copper cable ;
- Entertainment
* Stock Management, Planning, Reports, Training. ;
* New Telecom Projects surveys, quotations Precommissioning and Commissioning ;
-
TRT-Lucent Technologies
- Telecom Engineer
1996 - 1999
(150 000 Employees, +10 Billions $ Turnover)
Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):
* Maintenance contract of the following Microwaves Telecom Systems and their dedicated equipments:
- ITR2000: 3 Networks, 20 stations at Lagos, Warri and Offshore OML100. ;
- DECT Network - STD 10: 3 Networks - MUX: Semaplex
* Stock Management, reports, Trainings ;
* New Telecom Projects surveys, quotations Precommissioning and Commissioning ;
-
TRT-Lucent Technologies
- Telecom Engineer
1996 - 1999
(150 000 Employees, +10 Billions $ Turnover)
Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):
* Maintenance contract of the following Microwaves Telecom Systems and their
dedicated equipments:
- ITR2000: 3 Networks, 20 stations at Lagos, Warri and Offshore OML100. ;
- DECT Network - STD 10: 3 Networks - MUX: Semaplex
* Stock Management, reports, Trainings ;
* New Telecom Projects surveys, quotations Precommissioning and Commissioning
-
FEDD
- Telecom Transmission Engineer
1991 - 1996
Tasks completed in several countries for Public Telecoms and oil & Gas Companies:
-
FEDD
- Telecom Transmission Engineer
1991 - 1996
Tasks completed in several countries for Public Telecoms and oil & Gas Companies: