Menu

Stéphane LAURENT

MONEIN

En résumé

TESTING & COMMISSIONING MANAGER
EPCC OIL & GAS MAJOR PROJECTS
Multi-National Testing-Commissioning & Maintenance Teams Management
In Oil & Gas Industry
19 years in Oil & Gas Companies (ELF-TOTAL-SHELL-QP)
24 years in Middle East, Asia, East Europe, Africa


Mes compétences :
LAN/WAN > LAN
Synchronous Digital Hierarchy
Plesiochronous Digital Hierarchy
PABX
Offshore Oil & Gas
INTERCOM
CCTV
VoIP (Voice over IP)
Uninterruptible Power Supply
TETRA
MUX
Building Management Systems
Rectifiers
Radar
Project Handover Management
Microsoft Office
Management of Spie oil & Gas Subcontractor
EPCC Management
Contract Management
Stock Control
Onshore Oil & Gas
Business Development
SL1
Resuscitation
Global Telecom Contract Management
Global CSTOR Telecom Contract Management
Generators
Assitants Management

Entreprises

  • Blackcat-Qatar Petroleum - Testing & Commissioning Manager

    2012 - maintenant Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety College Project (RLESC: 460 Million $ Project -26 Million $ Telecom Project):

    * RLESC Project Precommissioning and Commissioning Manager:
    25 Multi-National Leaders and Assitants Management, (Instrumentation, Piping, Electrical, Mechanical, HVAC, Telecom, ICAPS, DCR, Planning) and Follow-up/review of Basic/Detailed Engineering, Procedures, Precom/Com/Punch in coordination with Construction Team.
    Project Handover Management.
    * Management of the Logistic, IT Network, Icaps, HSE, Business Development.
    * Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250 Expatriates and local workers) for the Basic and Detailed Engineering review. Installation, precommissioning, Commissioning, Hand Over for the following Telecom Systems:
    - Access Control System - CCTV - Anti-Intrusion - General Alarm ;
    - Atex Phone - Hotline - Intercom - VOIP
    - LAN - TETRA - SDH/PDH - Entertainment - Audio Visual - FOCN - Copper Cable -SDH/PDH ;
    - Meteo Station - Building Management System
    * ICAPS R3 Software Telecom Data Base Management:
    Operator, Population, Updating and statistics for the Precommissioning, Commissioning, punch list and Hand-over phases.
  • BLACKCAT Doha - EPCC - Commissioning Manager & Telecom Leader

    2012 - maintenant : EPCC - Commissioning Manager & Telecom Leader Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety
    College Project (RLESC: 450 Million $ Project -26 Million $ Telecom Project):

    * RLESC Project Precommissioning and Commissioning Manager:
    25 Leaders and Assitants Management, (Instrumentation, Piping, Electrical, Mechanical,
    HVAC, ICAPS, DCR, Planning) and Follow-up/review of Basic/Detailed Engineering,
    Procedures, Precom/Com/Punch in coordination with Construction Team.
    Project Handover Management.
    * Management of the Logistic, IT Network, Icaps, HSE, Business Development.
    * Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250
    Expatriates and local workers) for the Basic and Detailed Engineering review.
    Installation, precommissioning, Commissioning, Hand Over for the following Telecom
    Systems:
    - Access Control System - CCTV - Anti-Intrusion - General Alarm ;
    - Atex Phone - Hotline - Intercom - VOIP
    - LAN - TETRA - SDH/PDH - Entertainment
    - Audio Visual - FOCN - Copper Cable -SDH/PDH
    - Meteo Station - Building Management System
    * ICAPS Software Telecom Data Base Management:
    Operator, Population, Updating and statistics for the Precommissioning, Commissioning,
    punch list and Hand-over phases. SL-1/4
  • EPCC - Commissioning Leader & Telecom Leader

    2010 - 2012 Cegelec Abu Dhabi-Doha
    Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety
    College Project (RLESC: 450 Million $ Project -26 Million $ Telecom Project):

    * RLESC Project Precommissioning and Commissioning Leader:
    Follow-up of all Project Precom/Com/Punch statistics and Leaders Management to avoid
    delays in Precom and Com phases in coordination with Construction Team.
    * Commissioning Contract Management for Cegelec Abu Dhabi:
    Personnel, Logistic, IT Network, HSE, Business Development.
    * Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250
    Expatriates and local workers) for the Basic and Detailed Engineering review.
    Installation, precommissioning, Commissioning, Hand Over for the following Telecom
    Systems:
    - Access Control System - CCTV - Anti-Intrusion - General Alarm ;
    - Atex Phone - Hotline - Intercom - VOIP
    - LAN - TETRA - SDH/PDH - Entertainment
    - Audio Visual - FOCN - Copper Cable -SDH/PDH
    - Meteo Station - Building Management System
    * ICAPS Software Telecom Data Base Management:
    Population, Updating and statistics for the Precommissioning, Commissioning, punch list
    and Hand-over phases + Operator.
  • EPCC - Commissioning Leader & Telecom Leader

    2010 - 2012 Cegelec Abu Dhabi-Doha
    Tasks in Qatar for Blackcat-SEG-Qatar Petroleum-Ras Laffan Emergency and Safety College
    Project (RLESC: 460 Million $ Project -26 Million $ Telecom Project):

    * RLESC Project Precommissioning and Commissioning Leader:
    Follow-up of all Project Precom/Com/Punch statistics and Leaders Management to avoid delays in Precom and Com phases in coordination with Construction Team.
    * Commissioning Contract Management for Cegelec Abu Dhabi:
    Personnel, Logistic, IT Network, HSE, Business Development.
    * Telecom/Electrical Low Voltage Leader Managing CGC Subcontractor, (250 Expatriates and local workers) for the Basic and Detailed Engineering review. Installation, precommissioning, Commissioning, Hand Over for the following Telecom Systems:
    - Access Control System - CCTV - Anti-Intrusion - General Alarm ;
    - Atex Phone - Hotline - Intercom - VOIP
    - LAN - TETRA - SDH/PDH - Entertainment - Audio Visual - FOCN - Copper Cable -SDH/PDH ;
    - Meteo Station - Building Management System
    * ICAPS R3 Software Telecom Data Base Management:
    Population, Updating and statistics for the Precommissioning, Commissioning, punch list and Hand-over phases + Operator.


    SL-2/4
  • Cegelec-Qatar Petroleum - Telecom Engineer

    2007 - 2010 (9000 Employees, 900 Million Euros Turnover)
    Tasks in Yemen for YEMGAS(Technip)-YLNG(Total) - (4.5 Billion $ Project - 15 Million $ Telecom project):

    * Management of Spie oil & Gas Subcontractor, (12 Expatriates and 35 Local Workers) for the Installation, Precommmissioning, Commissioning, Hand-over of all following Telecom Systems:
    - Access Control System: - CCTV
    - Atex Phone: - Hotline
    - LAN: - Telecom Mast
    - VHF Aero: - VHF Marine
    - Radar: - Racon
    - UPS: - FOCN

    - Anti-Intrusion - General Alarm
    - Intercom - PABX
    - Trunk System: - Paging
    - HF Aero: - HF Marine
    - Entertainment: - TV/DSL System
    - Copper Cable
    * ICAPS R3 Software Telecom Data Base Management: Population, Updating and statistics for the Precommissioning, Commissioning, punch list and Hand-over periods. ;
  • SNEF Group - Telecom Engineer

    2007 - 2010 (9000 Employees, 900 Million Euros Turnover)
    Tasks in Yemen for YEMGAS(Technip)-YLNG(Total) - (15 Million $ Telecom Project -
    4.5 Billion $ Project):
    * Management of Spie oil & Gas Subcontractor, (12 Expatriates and 35 Local Workers)
    for the Installation, Precommmissioning, Commissioning, Hand-over of all following
    Telecom Systems :
    - Access Control System - CCTV - Anti-Intrusion - General Alarm ;
    - Atex Phone - Hotline - Intercom - PABX
    - LAN - Telecom Mast - Trunk System - Paging
    - VHF Aero - VHF Marine - HF Aero - HF Marine
    - Radar - Racon - Entertainment - TV/DSL System
    - UPS - FOCN - Copper Cable

    * ICAPS Software Telecom Data Base Management: Population, Updating and statistics
    for the Precommissioning, Commissioning, punch list and Hand-over periods.
  • SNEF - Ingénieur Télécom

    2007 - 2010
  • None - Sabbatical preriod

    2006 - 2007 : Sabbatical period in France to build personal projects following 15 years spent abroad.
  • DIETSMANN Monaco - Telecom Project Manager

    2005 - 2005 (2500 Employees, 200 Million Euros Turnover)
    Tasks in Angola for TOTAL Onshore and Offshore (4.5 Million $ / year):

    * Global CSTOR Telecom Contract Management at TOTAL Luanda.
    * Management of the onshore and offshore Telecom structures and teams: 8 Expatriates and 15 Local workers for the following systems:
    - PABX - LAN - VHF -UHF ;
    - Satellite - Microwaves: IRT2000, MDL etc... - MUX ;
    - UPS - FOCN - Copper Cable
    * Stock Management, Planning, Reports, Training. ;
    * New Telecom Projects surveys, quotations Precommissioning and Commissioning ;
  • DIETSMANN Monaco - Telecom Project Manager

    2005 - 2005 (2500 Employees, 200 Million Euros Turnover)
    Tasks in Angola for TOTAL Onshore and Offshore (4.5 Million $ / year):

    * Global CSTOR Telecom Contract Management at TOTAL Luanda.
    * Management of the onshore and offshore Telecom structures and teams: 8 Expatriates
    and 15 Local workers for the following systems:
    - PABX - LAN - VHF -UHF ;
    - Satellite - Microwaves: IRT2000, MDL etc... - MUX ;
    - UPS - FOCN - Copper Cable
    * Stock Management, Planning, Reports, Training. ;
    * New Telecom Projects surveys, quotations Precommissioning and Commissioning
  • Philips Projects Centre - Telecom Maintenance Manager

    1999 - 2005 : Telecom Maintenance Manager Philips Projects Centre
    Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):

    * Global Telecom Contract Management at EPNL (TOTAL) Port Harcourt, Warri, Lagos
    and Abuja.
    * Management of the onshore and offshore Telecom structures and teams: 3 Expatriates
    and 25 Local workers for the following systems:
    - PABX - LAN -VHF - UHF ;
    - Microwaves: ITR2000, MDL2013, STD10 etc... - Racon ;
    - Solar Systems - Back-up Generator - UPS ;
    - Telecom rectifiers - Telecom Mast - Aviation Lights - Copper cable ;
    - Entertainment
    * Stock Management, Planning, Reports, Training. ;
    * New Telecom Projects surveys, quotations Precommissioning and Commissioning
  • Philips Projects Centre - Telecom Maintenance Manager

    1999 - 2005 : Telecom Maintenance Manager Philips Projects Centre
    Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):

    * Global Telecom Contract Management at EPNL (TOTAL) Port Harcourt, Warri, Lagos and Abuja.
    * Management of the onshore and offshore Telecom structures and teams: 3 Expatriates and 25 Local workers for the following systems:
    - PABX - LAN -VHF - UHF ;
    - Microwaves: ITR2000, MDL2013, STD10 etc... - Racon
    - Solar Systems - Back-up Generator - UPS - Telecom rectifiers - Telecom Mast - Aviation Lights - Copper cable ;
    - Entertainment
    * Stock Management, Planning, Reports, Training. ;
    * New Telecom Projects surveys, quotations Precommissioning and Commissioning ;
  • TRT-Lucent Technologies - Telecom Engineer

    1996 - 1999 (150 000 Employees, +10 Billions $ Turnover)
    Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):

    * Maintenance contract of the following Microwaves Telecom Systems and their dedicated equipments:
    - ITR2000: 3 Networks, 20 stations at Lagos, Warri and Offshore OML100. ;
    - DECT Network - STD 10: 3 Networks - MUX: Semaplex
    * Stock Management, reports, Trainings ;
    * New Telecom Projects surveys, quotations Precommissioning and Commissioning ;
  • TRT-Lucent Technologies - Telecom Engineer

    1996 - 1999 (150 000 Employees, +10 Billions $ Turnover)
    Tasks in Nigeria for EPNL (TOTAL) Onshore and Offshore (3 Million $ / year):

    * Maintenance contract of the following Microwaves Telecom Systems and their
    dedicated equipments:
    - ITR2000: 3 Networks, 20 stations at Lagos, Warri and Offshore OML100. ;
    - DECT Network - STD 10: 3 Networks - MUX: Semaplex
    * Stock Management, reports, Trainings ;
    * New Telecom Projects surveys, quotations Precommissioning and Commissioning
  • FEDD - Telecom Transmission Engineer

    1991 - 1996 Tasks completed in several countries for Public Telecoms and oil & Gas Companies:
  • FEDD - Telecom Transmission Engineer

    1991 - 1996 Tasks completed in several countries for Public Telecoms and oil & Gas Companies:

Formations

  • ALPHA LANGUES (Pau)

    Pau 2007 - 2007 TOEIC

    740 en 2007

Réseau

Annuaire des membres :