Mes compétences :
Management
Certification ISO 9001
Lean supply chain
Suivi des fournisseurs
Assurance qualité
Management de la qualité
Conception mécanique
Relations clients
Injection plastique
Gestion de projet
Entreprises
Rolls-Royce
- Head of Quality and HSE
Bracknell2014 - maintenantMission: Manage Quality & HSE Operations of RR Toulouse & Hamburg and act as Rolls-Royce Toulouse Quality local focal point for RR customers: Airbus and the Airlines
Collaborative management of a team of 8 members in charge of Operational Quality, Quality Assurance, Certification and HSE (located in Toulouse and in Hamburg)
Creation of the HSE full time role to manage RR Toulouse & Hamburg specific HSE risks
Development of the Quality culture within RR TS operational teams: Completion of 8Ds on RR TS local Q issues, mechanics jobs instructions improvement in collaboration with Head of Operations
Improvement of the feedback loop to the RR Supply Chain Units on the Quality issues found at Airbus
Airbus Group
- Engine Quality and Supply Chain Manager
Blagnac 2010 - 2014Mission: Manage Quality & Supply Chain performances of the supplier Rolls-Royce for 3 engine types: Trent 700 (A330), 900 (A380) and XWB (A350)
Significant improvement of the supplier quality and supply chain performances: 100% on time delivery (OTD) maintained and Key Performance Indicator (KPI) improved by a factor of 3 during the last 3 years.
Creation and application of a procedure validated by the EASA to authorize the installation of used engines on new A380 aircrafts: Airbus Award obtained for this specific project.
Airbus Group
- Engine and Nacelle Physical Integration Leader
Blagnac 2006 - 2010Mission: Define the physical interfaces between the aircraft, engine and nacelle through coordination of technical activities between Airbus, Nacelle and Engine suppliers design offices
2008-10: Continuous improvement of the physical integration of 2 RR engines installed on production aircrafts
2006-08: Integration manager on the development project of a Flight Test Powerplant with no installation or physical integration issues, delivered on plan
Visteon
- Project Design Team Leader
PARIS LA DEFENSE2004 - 2006Mission: Manage development from initial design up to production full ramp-up of the Peugeot 207 interior door panels: 12000 door panels / day production rate achieved on time.
Management of a 6-member CAD designer team
Customer technical focal point: Negotiation of the Design Changes: 75% of the associated costs charged to PSA
New plant start in Slovakia: Training of a local design team to support production ramp-up