Energy Pool
- Chef de Projets
Le Bourget du Lac cedex
2015 - maintenant
Définition de la stratégie commerciale pour assurer le développement de nouvelles solutions de valorisation pour le marché du Demand Response (Management de l’énergie) auprès des industriels. En charge de la rédaction des offres commerciales pour le marché « Western Europe ».
-
Boccard Energy
- Mechanical Supervisor
2013 - 2014
Mechanical Contractor’s supervision for a New Brine Preparation & Filtration unit (Bel Group) - Customer relationship on site with weekly meeting – Material procurement – Weekly progress report –Defined the priority regarding the progress schedule (3 months)
-
BOCCARD Energy
- Project Engineer
2013 - maintenant
BOCCARD ENERGY - New York (USA) Engineering Company - Power Sector – Project Engineer
Feasibility Analysis and Preliminary Design for CHP Project: 30% Design (Mechanical PID, HVAC drawing, Architectural and Structural drawing, Electrical drawing) - Economic model study (Historic data analysis, CHP Capital cost estimation, ROI calculation, future electrical and steam load estimation, CHP Operation & Maintenance cost estimation) – Launch Request for Quotation for mechanical equipment (Gas Turbine, HRSG, Blowdown System, Water treatment, Gas compressor package and Air compressor package).
- CHP Project ($ 20 million capital cost), capacity 8MW (SOLAR Gas Turbine)
- Cogeneration Project ($ 4 million capital cost), capacity 800KW (Capstone Gas Microturbine)
-
Boccard
- Project Engineer
Villeurbanne
2013 - 2013
Project: Thermal power plant with diesel engine_EDF_Electricity Power 120 MW
Principal in charge for the management of the valves & Instrumentation package: Wrote technical specification - Launch Request for Quotation & Material Procurement negotiation-
-
BOCCARD
- Project Manager
Villeurbanne
2012 - 2013
DGA-Direction Générale de l’Armement – EPC injection water production unit –$ 2 Million
Project Manager responsible of the Engineering, Construction and Commissioning & Start-up of a new turnkey water production unit (Civil & Structural work, Electrical & Automation, Mechanical & Piping). Construction of a new pump house included installation of two multistage vertical pumps (Ensival Moret - 250 m3/h - 360 psig).
- Lead the Engineering and construction team
- Water pump sizing (NPSH calculation and Pressure droop estimation)
- Wrote the technical specification (Civil Work and Mechanical & Electrical)
- Involved in the purchase negotiation process for the Equipment and Subcontractor procurement
- Performed the project schedule (Engineering, Construction and Commissioning & Start-up) with monthly progress curve and progress report
- Kick-off meeting with subcontractors and suppliers
- Supervised and Coordinated contractors on site
- Cost accounting and Monthly financial report
- Lead the commissioning and start-up operation (Mechanical completion audits and piping check-out)
- Quality inspection for hydraulics pump test manufacturing (Performance and NPSH measurement)
- Customer relationship (monthly meeting design review and weekly construction meeting)
-
Boccard
- Contractor Supervisor
Villeurbanne
2011 - 2011
DGA-Direction Générale de l’Armement–Revamped test benches – Capital Cost $ 5 Million
Managed Mechanical & Electrical phase construction of 3 meter carbon duct designed with the hight temperature conditions (from -50 C to 1400C) included a water cooling system network to assure a duct skin temperature below 200C.
- Mechanical & Electrical contractor management on site
- Progress control with weekly progress report
- Defined the construction actions plans regarding the construction priorities.
- Material procurement & Cost control
- Negotiation of the change orders with the client
- Weekly Construction meeting (client and contractor)
- Safety meeting and maintaining up the safety rules on site
- Control and inspection
-
Boccard
- Mechanical Contractor Supervisor
Villeurbanne
2011 - 2011
DGA-Direction Générale de l’Armement – Design & fabrication water / air heat exchanger (CODAP regulation ) – Capital cost $ 1 Million
Principal in charge of the design and fabrication of the horizontal heat exchanger (11’length x 10’ diameter - Gas flow variation between 170 kg/s at 2552 F and 30 kg/s at - 58 F) included the thermic & Thermo-Aeraulic study.
- Responsible to manage the heat exchanger thermal study (Thermo-Aeraulique , 3D model)
- Heat exchanger manufacturing progress (Kick off meeting, Quality inspection, progress control )
- Lead the design of General arrangement layout for the heat exchanger implantation (PDMS & Autocad.
- Worked deeply with the quality department to assure the fabrication under the CODAP regulation (LOFC definition, defined workshop inspections requirement and established the final quality report)
-
Boccard
- Project Manager
Villeurbanne
2009 - 2010
EDF Martigues –EPCC Fire Protection Water pumping unit (NFPA Regulation)- $ 2 Million – 10 months
Project Manager responsible for the Engineering, Construction and Commissioning & Start-up of a new EPC fire protection Water pumping unit (Civil Work, Electrical & Automation and Mechanical & Composite Piping). Construction of a new pump house included installation of a COLFAX ALLWEILER horizontal pumps (1100 m3/h - 140 HMT- sea water application) and the NFPA 20 electrical control panel
- Lead the Engineering and Construction team
- Water pump sizing (NPSH calculation and Pressure droop estimation)
- Wrote technical specification for subcontractor job & Equipment procurement
- Contractors management on site (Mechanical & Electrical and Civil Work)
- Cost control and financial monthly report
- Established the project schedule with monthly report (progress curve)
- Customer relationship (Design review meeting, Construction Meeting, Change Orders negotiation)
- Quality inspection for hydraulic pump test manufacturing (Performance and NPSH measurement)
- Wrote the commissioning & start-up procedure
- Lead the commissioning and start-up operation (Mechanical completion audits and piping check-out)
-
Boccard
- Productivity Management
Villeurbanne
2008 - 2009
Co-op study program (12 months) for my Master Degree – Engineering position
Established Project productivity report for the engineering department – Built and managed the monthly workload scheduling for the 3 engineering departments (France, Belgium Romania),
-
Boccard
- MASTER'S DEGREE INTERNSHIP
Villeurbanne
2008 - 2008
BOCCARD CSC Argentina - Mechanical & Industrial piping - Argentina - MASTER'S DEGREE
- Reorganization of a storage tank plant for the wine and food market
- Set-up new supply chain equipment to optimize production flow
- Performed Excels spreadsheets to follow and control the manufacturing Cost.
-
Defimetal
- Internship - industrial designer
2005 - 2005
Performed General Layouts & manufacturing drawings on Autocad for wine storage tanks.
Equipment List
Materials and Equipment procurement