Menu

Vincent LAZARE

Paris

En résumé

Pas de description

Entreprises

  • EDF Energy - Pilote de Contrat

    Paris 2014 - maintenant Pilotage du contrat de pompes diverses pour l'EPR
  • Schlumberger - Sustaining Engineer

    Paris 2011 - 2014 Sustaining team is in charge to implement evolution coming from the site feedback and to ensure that the equipment complies with standard required by our customer. I’m in charge of transfer pumps, data headers, tanks and piping.

    Development of a new diesel and an electrical Transfer pump
  • Schlumberger - Product development Engineer

    Paris 2010 - 2011 Development of Well testing surface equipment:
    ->Mechanical design of frame, boiler and vessel, piping
    ->Random vibration and shock qualification
    ->Material selection and qualification
    ->Multiphase flow calculation
  • PCM - R&D Engineer

    Levallois-Perret 2007 - 2010 Improvement / development on the first metal to metal progressing cavity pump

    Development of an PHP software simulating the behaviour of an oil well equipped with a downhole PC Pump.

    Implementation of a new ISO standard (15136-1)

    Development of a downhole valve

Formations

Réseau

Annuaire des membres :