-
EDF Energy
- Pilote de Contrat
Paris
2014 - maintenant
Pilotage du contrat de pompes diverses pour l'EPR
-
Schlumberger
- Sustaining Engineer
Paris
2011 - 2014
Sustaining team is in charge to implement evolution coming from the site feedback and to ensure that the equipment complies with standard required by our customer. I’m in charge of transfer pumps, data headers, tanks and piping.
Development of a new diesel and an electrical Transfer pump
-
Schlumberger
- Product development Engineer
Paris
2010 - 2011
Development of Well testing surface equipment:
->Mechanical design of frame, boiler and vessel, piping
->Random vibration and shock qualification
->Material selection and qualification
->Multiphase flow calculation
-
PCM
- R&D Engineer
Levallois-Perret
2007 - 2010
Improvement / development on the first metal to metal progressing cavity pump
Development of an PHP software simulating the behaviour of an oil well equipped with a downhole PC Pump.
Implementation of a new ISO standard (15136-1)
Development of a downhole valve