VINCI CONSTRUCTION GRANDS PROJETS
- Bid Manager
2019 - maintenant
Head Office, Rueil Malmaison, France
Tender Phase and negociation with Clients for 2 projects in Lisbon Portugal :
DEPUTY BID MANAGER
. New Montijo Airport Project (Client ANA - VINCI Airports)
New Airport Development including Terminal Building, Runway, Taxiway, reclaimed land (extension in the sea), parkings, access roads, etc.
. Montijo-Barreiro Crossing Project (Client LUSOPONTE - VINCI Highways)
BID MANAGER
Access Roads to the New Montijo Airport and Montijo-Barreiro corssing, viaduct, immersed tunnel, bored tunnel.
-
VINCI CONSTRUCTION GRANDS PROJETS
- Bid Manager for the Shafts
2018 - 2019
Head Office, Rueil Malmaison, France
Tender Phase, Rail project Lyon-Turin – « Puits d’Avrieux »
JV : VCGP / DODIN CAMPENON BERNARD / VCF LYON / SALINI IMPREGILO / BERGTEAMET
BID MANAGER for the SHATFS
Contract Value : 500 M€ - 36months
Construction Site Location : French Alpes, nearby Avrieux city.
Construction of four ventilation shafts depth 500m each of Ø5,20m diameter using Raise Boring technology, and construction of 10 km of galeries using standard explosive methodology.
-
Vinci Construction Grands Projets
- Construction Manager and VCGP Representative
Rueil-Malmaison Cedex
2018 - 2018
Work Site : Reading, UK - M4 Smart Motorway Project, 53km highway widening 2x3 lanes to 2x4 lanes, West of London from Heathrow Airport to Reading
JV : VCGP / VINCI UK / BALFOUR BEATTY
CONSTRUCTION MANAGER and VCGP REPRESENTATIVE for the JV
Contract Value : 850 M£
Project divided in 2 contracts, C1 : 29km – 40months - 420M£ / C2 : 23km – in negociation – budget estimation 430M£
Contrat 1 : 3 Overbridges to be demolished and rebuilt, 1 Underbridge above the Thames to be widened, Earthworks, Drainage, Traffic Management, Portals, Signage, L Shape Walls, Sheetpiling, Piling for Bridges, Environmental Barriers, Smart System to manage traffic with speed control using speed cameras and traffic information panel signs, Slipformed concrete barriers and drains, pavement, diversion and protection of utilities
Works under live traffic : 3 lanes live during day and minimum 1 lane live during the night
-
Vinci Construction Grands Projets
- Construction Manager
Rueil-Malmaison Cedex
2015 - 2017
Work Site, Doha Qatar - New Orbital Highway 2 (NOH2)
48 km of highway 2 times 7 lanes
Civil Works Construction Manager
Global amount of the project 1 Billion Euros - Project duration 26 months
Civil Works 300 M€, 300,000 m3 of concrete - Staff and Workers 1,100
In charge of 2 main bridges 4 spans each, 1 ramp bridge 16 spans 700m, 3 underpasses 600m, 3 braids 500m, 2 cut and cover 800m, Freyssinet precast arches, MSE walls, etc.
-
Vinci Construction Grands Projets
- Project Manager
Rueil-Malmaison Cedex
2012 - 2015
Work Site, Port Antonio, Jamaica - Port Antonio Water Sewerage and Drainage Project PROJECT MANAGER
Contract Value : 21 MUSD - Project Duration : 23 months - Total Staff and Workers : 250 (VCGP and Subcontractors)
The project consists of three main components :
- Water : 9500m HDPE pipes DN100 to DN250, 140m D.I. pipes DN250 to DN300, Approx. 1000 service connections, Fittings, Air Valves, Washouts, Fire Hydrants, etc.
- Sewerage : 5500m uPVC gravity pipes DN200 to DN350, 850m HDPE pressure pipes DN150 to DN250, Three new Pumping Stations, Approx. 500 house laterals with 3500m uPVC gravity pipes DN125, 144 concrete precast manholes Ø1200mm
- Drainage : 850m concrete precast box culverts (internal size : from 1000x750mm to 1600x800mm), 880m HDPE corrugated pipes DN450 to DN750, cast in situ reinforced concrete access chambers and manholes, catchbasins, concrete stormwater sea outfall, concrete channels repair, coastal rock revetment.
-
Vinci Construction Grands Projets
- Projects Engineer
Rueil-Malmaison Cedex
2009 - 2012
Head Office, Rueil Malmaison, France
PROJECTS ENGINEER, International Water Works
In charge of Jamaican Projects (Awarded or in Tender) : Technical (Design Offices : Process, Civil Works, Electricity/Automatism), Procurement and Logistics in Europe, Contractual and Administrative.
Awarded Projects :
1) Kingston, Jamaican Water Supply Implementation Project - JWSIP (24 months, 50 M€), 2 water treatment plants to refurbish, installation of 6km of diam. 600mm pipeline, installation of 70 000 water meters, detection and repair of the network
2) Kingston Jamaica, Mona & Hope Water Treatment Plants (18 months - 14 M€), Refurbishment of Mona WTP and Hope WTP.
-
Vinci Construction Grands Projets
- Section Engineer
Rueil-Malmaison Cedex
2007 - 2009
Work Site, Trinidad and Tobago W.I. - Interchange CRH/UBH, Package B
SECTION ENGINEER
Contract Value : 50 M€ - Project Duration : 20 months
In charge of the Work Section mainly including :
- A flyover viaduct composed of steel beams and concrete deck, 600m long and 16m wide
- A concrete overpass, 50m long and 20m wide
- Production of concrete precast slabs for box culverts
The project was located on the Island of Trinidad, junction of the two main highways.
. Viaduct : Precast concrete piles driven with diesel hammer, pile caps, piers, crossbeams, abutments, seismic bearings, steel structure installed using hydraulic jacks (launching system), precast deck slabs, stiches, seismic expansion joints, concrete barriers, accessories.
. Overpass : Precast concrete piles, pile caps, piers, crossbeams, abutments, seismic bearings, AASHTO precast concrete beams, precast deck slabs, stiches, concrete barriers, accessories.
From August 2008, in addition to being Section Engineer additional responsibility as
QUALITY MANAGER for the entire Project (Civil works + Drainage + Earthworks)
-
Vinci Construction Grands Projets
- Study Engineer
Rueil-Malmaison Cedex
2004 - 2007
Head Office, Rueil-Malmaison - France and Abroad
STUDY ENGINEER
Department of Engineering and Technical Resources
- In charge of Price Studies, Works Methods and Schedules on different tenders (France) :
A41 Mont-Sion tunnel, between Annecy and Geneva / Pipeline between Kufra and Tazerbo,
Libya, pipeline 300km DN4000 and 70km DN3600, pumping stations / Immersed Tunnel of Bjorkvika, Norway / Immersed Tunnel of Limerick, Irland / Launching station "Soyouz", Guyana.
- In charge of Price Studies, Works Methods and Schedules on different tenders (Abroad) :
New line for Budapest metro, Hungary / Tel Aviv metro, Israel / Chiloe bridge project in Chile, Germany / Motorway between Korinthos-Patra-Tsakona, Greece
-
Vinci Construction Grands Projets
- Trainee Engineer
Rueil-Malmaison Cedex
2004 - 2004
Work Site, London - England, four months engineering training working on the Heathrow Airport Terminal 5 (T5) project
TRAINEE ENGINEER
Construction methods of the Junction between Piccadilly line Tunnel and Piccadilly line
Extension Tunnel for the new Terminal 5 of Heathrow Airport.