Je suis ingénieur d'état en génie mécanique, option construction métallique
Mes compétences :
Microsoft Project
Hangars
Autocad
RDM
Microsoft Word
Microsoft PowerPoint
Microsoft Excel
Entreprises
GAMA Power Systems Engineering and Contracting, Inc
- MECHANICAL QA/QC INSPECTOR
2016 - maintenantProject Simple Cycle Power Plant 704,129 MW chez ENPRO - BOUFARIK - BLİDA
ENPRO
- QA/QC INSPECTOR
2015 - 2016Project Simple Cycle Power Plant 704,129 MW chez ENPRO - BOUFARIK - ALGER -
3 x Exhaust Gas Stacks + 8 each Field Erected Storage Tanks (including engineering, manufacturing and site erection)
İn chagre of :
• Follow-up and control of welder’s homologations
• Follow–up weldıng progress
• Establishment of the punch list
• Follow-up hydrostatic steps
• Checking weld joint preparation, fit up, alignment & dimensional inspection as per drawings.
• Preparation fınal folder of hand hover
• Cover all ınspectıon of tanks and stacks for GT as per procedure, specıfıcatıon and QCP
• Follow-up paıntıng ınspectıon and sand blastıng
• Follow-up steel structure erectıon
• Prepare weldıng log
• Prepare weld map
• Follow-up RT schedule and progress, UT and MT
• Prepare procedure for reparatıon and TQ
• Ensure a good Coordination between quality, constructıon department and contractor
• Prepare RFI for all ınspectıons as per QCP
• Prepare weekly RFI Log, RT Log and weld log
• Follow-up NCRs and prepare actıons plan
Technip
- SPHERES & TANKS QC INSPECTOR
Paris2014 - 2015ALGIERS REFINERY REHABILITATION AND ADAPTAION POJECT
QC Inspector tanks and spheres for:
-02 sphères of butane
-02 sphères of propane
-30 tanks fixed roof and 09 floating
Details of job responsibilities:
• Review the quality control document (QCP, NDT Procedure).
• Review and check the documentation on a daily basis to meet the project requirement to affect the final documentation hand over.
• Preparation & review of preliminary welding procedure specification and welding procedure
• Check the Inspection Test Notification and Inspection test Report as per QCP
• Cover all Tanks (Vacuum box testing for detection leaks, Leak test with penetrating oil)
• Checking weld joint preparation, fit up, alignment & dimensional inspection as per drawings.
• Witness of material inspection, Leveling, Plumpness, Peaking Banding, roundness for Tank as per Code & Company requirements.
• Daily monitoring of welding according to WPS and procedures
• Test pack
• Punch list
• Follow-up of hydro-test step (settlement, air test and collapse test)
BATENCO OUEST
- Chef De Projet Junior
2011 - 2013 Monitor the work site in terms of quality and deadlines
Details of job responsibilities:
• Monitoring assembly 06 storage tanks (diesel, gasoline and kérosène)
• Monitoring the building in steel structure
• Follow-up and control the manufacturing in work shop of steel structure
Eurl Bureau d'Ingénierie Bourouba (BIB)
- Ingénieur de construction & assistant technique
2009 - 2011 - Study and monitoring of two projects, steel structural for SIDAL account (AIR LIQUIDE) Development of Acetylene Unity and LINDE GAS ALGERIA Reghaia Algiers.
-Modeling and preparing folder fabrication and workshop and erection drawings.
Mechanical Engineer at the site at Cap Djinet Boumerdes DESALINATION STATION project with a capacity of 100000m3 / J UTE CDJ (FCC - OHL) for the AEC account (ALGERIA ENERGY Company)
Mission :
• Modeling and preparing folder fabrication and workshop and erection drawings.
• Follow-up and control of rack and steel structure installation (building)
• Follow-up and control the manufacturing in work shop of steel structure
• Follow-up and control of mechanical equipment installation
• Follow-up of civil works (foundation
METALENG GROUPE ENCC
- Ingénieur coordinateur
2008 - 2009• JANUARY 2008 TO FEBRUARY 2009: engineer coordinator (study, design and site supervision). The principal tasks are performed:
• Total project study, designer and preparation drawing for manufacturing and site of the roof, stairs and walkways bitumen storage tanks at TINES
• ALGESCO project study, designer and preparation the file execution (drawing) for manufacturing and site) of the building in steel with bridge cranes with a capacity of 2 * 40T in Boufarik W. Blida
• ALSTOM project preparation the file execution (drawing) for manufacture and erectıon for 11 tanks at Relizen.
• Project Manager of construction of 350 cottages in GHARDAIA
APRIL 2009 TO JUNE 2009: Department Head steel work.
The major tasks performed are:
• Establish Schedules for studies.
• Monitoring and organizing documents, verification drawing and calculations notes
SNC MOKABLI
- Ingénieur en charpente métallique
2007 - 2007• Modeling and preparing folder fabrication and workshop and erection drawings.
• Follow-up and control manufacturing of steel structure in work shop
• Follow-up and control erection of steel structure on site
• Intervention and solve problems on site
SARL LOTUS ENGINEERING
- INGENIEUR DE PROJET
2007 - 2007: SARL LOTUS ENGINEERING & SERVICE à Dely Brahim - Alger.
l'expertise des pylônes en charpente métallique pour le compte de DJEZZY.