-
AOFP, Algeria
- Warehouse Manager
2012 - maintenant
Reporting directly to the SCM manager of a new fertilizer plant actually in commissioning phase. Development and implementation of material management procedures and operations. In charge of warehouse staff selection and coaching them as per procedures and company policies. More than 25 000 line items to be managed through material management system.Participing in ERP selection committee.
-
BP- Statoil-Sonatrach (Joint venture)-Algeria
- Material Coordinator
2008 - 2011
Reporting directly to the Construction manager, organized delivery and recording system using Maximo V6. Re-organized yard and warehousing. Hired staff and trained contract staff to ISG standards in HSE and materials handling. Responsible for receiving ordered goods and issuing to contractors, materials according to MTO for prefabrication and packaging materials to contractors for field installation. ISG requirements are for full traceability therefore issued materials must be fully identified to Purchase Order and material data sheets to ensure that products comply with national and international legal and quality standards. Apart from main central yard also responsible for two separate remote yards at other locations which receive materials from central yard and issue materials to site activities. Due to delivery problems ‘just in time’ deliveries, are not uncommon, and use of existing stock and tracing the materials requires quick and accurate response.
-
ConocoPhillips
- Material Inspector
Paris
2006 - 2008
Report to the QC manager and directly responsible for construction project inventory management and distribution off all material associated with static and rotating equipment ( turbine/Generators, compressors, centrifuges, pumps and the like).Responsible for receiving Rotating Equipment packages including Power Generation (Nuovo Pignone- Frame 5) and Turbo-Compressor (Nuovo Pignone BCL 358) Packages and coordinating their acceptance by the Discipline Supervisor and the Mechanical QC Inspector.Physically check every shipped loose item. Proactively thoroughly review vendor field assembly drawings and manuals to ensure all materials and components are provided in packing lists and field material MTO’s. Reconcile deficiencies in vendor MTO’s and components and participate in coordination discussions with vendor field reps and factory reps.. Advise Vendor of outstanding items and expedite to site or initiate procurement action, if Vendor is not responsible for supply of shortage items. Proper storage, coordinate preservation & maintenance activities.Coordinated commissioning and 2 years spares part, special tools inventory supplies to avoid shortages. Ensure OS&D including non-conformance are raised & closed out. Assisted with installation & pre-commissioning activities
-
BP
- Warehouse Supervisor
Cergy
2003 - 2006
Supervise four separate warehouses on different sites. Main activities include material receipt, inventory of spare parts. Material management through Maximo (Power user), overseas and local purchasing coordination, expediting. Carry out all variety of duties related to materials and inventory activities Review all stock item creation to ensure that specifications, description and information are correct Generate .stock replenishment report and updating regularly description, specifications and the stock parameters according to the latest recorded annual consumption and end user information’s.
Preparation of warehouse management procedures; safety presentation and team coaching
-
ConocoPhillips
- Material & Procurement Coordinator
Paris
2001 - 2003
In charge of maintenance warehouse organization, material receipt, inventory and
Syria DEZ Gas documentation. Responsible for material procurement and stores through Benchmate
Deir Ezzor, Syria (material control system), overseas purchasing coordination and expediting. Establishing
and restocking of min-max, generally maintaining a flow of materials to the maintenance
team. Generate monthly re order report
-
ConocoPhillips
- Material Control Consultant
Paris
2001 - 2001
(Rotating Equipment)
Directly responsible for construction project inventory management and distribution off all
DEZ Gas material associated with Nuovo Pignone PGT-10/2B gas turbine/Compressors.
Deir Ezzor, Syria Coordinated commissioning and 2 years spare parts, special tools inventory supplies to
avoid shortages. Ensure OS&D including non-conformance are raised & closed out.
Assisted with installation & pre-commissioning activities.
-
BP
- Inventory Control
Cergy
2000 - 2001
adjusting stock levels. Required familiarity with all types of petrochemical material
Enhanced Oil Recovery (construction & spare parts) mechanical, electrical, instrument, etc. Generate all kind of
Project Rhourd El warehouse management reports
Baguel, Algeria
-
M.W. Kellogg Co.
- Material Controller
1998 - 2000
(Rotating Equipment)
Responsible for receiving Rotating Equipment packages related to Power Generation
Sonarco Enhanced Oil (Nuovo Pignone- PGT10) and Turbo-Compressor (Nuovo Pignone Frame 5) Packages and
Recovery Project Rhourd coordinating their acceptance by the Discipline Supervisor and the Mechanical
El Baguel, Algeria Inspector.Physically check every shipped loose item. Proactively thoroughly review vendor
field assembly drawings and manuals to ensure all materials and components are provided
in packing lists and field material MTO's. Reconcile deficiencies in vendor MTO's and
components and participate in coordination discussions with vendor field reps and factory
reps.Proper storage , coordinate preservation & maintenance activities
-
M.W. Kellogg Co.
- Equipment Supervisor
1997 - 1998
(Static Equipment)
Responsible for maintenance, overhauling and testing of all exchangers and other Static
LNG K1 Renovation equipment as per QC data sheets.
Project Skikda, Algeria
-
SOMIZ
- QC inspector
1996 - 1997
Duties included insulation quality inspection, also tracking and progress the
LNG-1Z Renovation schedule/percent complete of the work under Bechtel supervision. Reported to the QA/QC
Project-, Arzew , Algeria manager.
-
Somiz
- Schedule & Cost Technician & Mechanical Supervisor
1993 - 1996
Responsibilities included tracking and progress schedule and percent complete of new
LNG 2Z Renovation static and rotating equipment. Also supervised the installation of the foam generation units.
Project Arzew, Algeria Reported to the SOMIZ project manager.
-
The M.W. Kellogg Company
- Equipment Inspector
1993 - 1993
Seconded to The M.W. Kellogg Company for the preparation of work order scope for all
LNG 2Z Renovation Rotating and Static Equipment. Reported to MW Kellogg mechanical superintendent and
Project, Arzew , Algeria QA/QC.