Menu

Alexandre JACQUET

Rueil Malmaison

En résumé

Pas de description

Entreprises

  • PSA PEUGEOT CITROEN - Deputy Project Director for project control

    Rueil Malmaison 2009 - maintenant Deputy Project Director for the project control of gasoline engines projects in co-operation with the two Joint-Ventures of the company in China (DPCA in Wuhan and CAPSA in Shenzhen) and with BMW (PRINCE 3)
    - Head of a 10 people team distributed in France and in China,
    - Planning – responsible for managing tenders at the project initiation and concerning new requests during the project,
    - Scheduling – responsible for controlling the time schedules for the powertrains projects in Europe and in China, using Microsoft Project,
    - Cost estimating – evaluation of the project budget and negotiation with the project owner at the opening of the project, and during the project to take into account évolutions
    - Cost control – control and monitoring of the project budget during the different project phases,
    - Change management – responsible for implementing and leading the global change management process within the project,
    - Risk management – responsible for co-leading with the project quality manager the global risk management process and for taking into account risks within the project control field,
    - Reporting – responsible for the whole project reporting to the management staff based on many KPIs regarding planning, cost, quality, technical advancement and milestones reviews.
  • PSA PEUGEOT CITROEN - Deputy Project Manager for project scheduling

    Rueil Malmaison 2007 - 2009 Deputy Project Manager for the project scheduling of gasoline engines projects in co-operation with BMW (PRINCE 2) (budget €250 million / 400 people / 2 engines plants in France and UK / 2 R&D centres in France and Germany)
    - Elaboration of the development time schedules for the engine launches on Peugeot and Citroën vehicles,
    - Control of the achievement of the activities and deliverables, using Microsoft Project: management of critical paths and time margins, detection of delay, reporting, definition and lead of actions plans to converge,
    - Guarantee of the consistency of the whole validation plan between the different technical domains involved,
    - Responsible for the prototypes resources.
  • PSA PEUGEOT CITROEN - Project Quality Manager

    Rueil Malmaison 2005 - 2007 Project Quality Manager of gasoline engines projects in co-operation with BMW
    - In charge of the project quality during the industrial launch (ramp-up 0 to 2000 engines/day in 6 months) in the PSA engine plant in Lens, France,
    - Transversal management of 10 technical quality engineers mainly to ensure the achievement of quality targets at suppliers,
    - Organization of the milestones reviews in order to get the board approval,
    - Coordination of task forces to solve internal defects and suppliers defects, and later to solve defects detected by the after-sales department,
    - Introduction of relevant quality Key Performance Indicators (KPI) and weekly report to the project director
  • PSA PEUGEOT CITROEN - Technical Quality Engineer

    Rueil Malmaison 2003 - 2005 Technical Quality Engineer in the engine system design department on different innovation and development projects
    - Quality Assurance: deployment of quality standards, process audits, continuous improvement,
    - Operational Quality: leading dependability studies and supplier quality insurance process.

Formations

  • ENSAM

    Paris 2002 - 2003 Advanced Master’s degree

    Quality Management
  • ENSHMG

    Grenoble 1999 - 2002 Master’s Degree in Engineering

Réseau

Annuaire des membres :