Technip
- Site Representative
Paris
2015 - maintenant
Block 15/06 for ENI in Hartlepool Port in UK
Scope of Work: 3 Rigid Jumpers
-
Technip
- Deputy Site Representative
Paris
2014 - 2015
Moho Nord UFR Project for TOTAL in Pori, Finland
Scope of Work: 46 Piping Modules, 14 PWMS, 1 JLay Collar and some Installation Aids
-
Sonamet (Subsea7), Lobito, Angola
- Deputy Project Manager
2012 - 2014
Expatriate Deputy Project Manager on the Project Block31 GES for BP
Scope of work: PLEMs, Protection Structures, Dewatering PLRs, Suction Piles, PSS..
I control and manage the complete fabrication activity of the Project and report to the Yard Manager. I maintain the efficiency and the Safety awereness. I follow the Fabrication Budget, I prepare and follow the Fabrication Schedule. I review the contract requirements, contract administration procedures and I ensure they are communicated and implemented. I identify any interaction between different project phases and parties. I anticipate/resolve problems accordingly (sequences optimisation, recovery plan, change order…) and report any deviation to the Yard Manager. I prepare Weekly, Monthly Report and Customers meetings.
Skill gained: Managing People, Meeting Goals/Targets, Multidisciplinary capacity. Liaising with all departments and Clients, taking responsibility for decisions/actions.
-
Sonamet (Subsea7), Lobito, Angola
- Planning Manager
2012 - 2013
Feb 2012 - Jan 2013 SONAMET (SUBSEA7) Lobito, Angola.
Expatriate Planning Engineer in Lobito, Angola.
I am in charge of the Planning Department. I supervise Fabrication Projects like CLOV (Block17) for TOTAL (SURF & Manifolds Fabrication) and South Nemba for CHEVRON (Jacket & Piles Fabrication); but also Civil Works Projects; Power Plant, New Bridge and Wet Dock Enlargement. I guarantee the optimisation, the resources follow-up and the development of cost follow-up and productivity follow up for each project.
Skill gained: Capacity to work in a multicultural environment, Training people, using Primavera, reaching goals, presenting results, liaising with all departments and clients, good knowledge in Oil & Gas Fabrication Processes.
-
DTP Terrassement _ Afrique_Mali (Bouygues-Construction)
- Ingénieur Matériel
2010 - 2011
Sept 2010 - Oct 2011 DTP TERRASSEMENT(BOUYGUES) Loulo/Gounkoto Gold Mine, Mali.
Expatriate Plant Engineer, I am managing the maintenance of a Heavy Mining Equipment fleet, assisting and acting for the Plant Manager (80 assets, including 350 Ton Excavators and 100 Ton Dumpers). I get involved in the commissioning of the new mine. I am in charge of the Plant Rebuilt Program (Budget 2011: 4169K€) and of the Planning Department, I guarantee the assets technical follow up, fleet performance reporting and analysis.
Skill gained: Understanding of the diverse West African culture and adapting to it, Training people, meetings organization, managing people, meeting goals/targets, predictive maintenance and mechanical components lifetime management.
-
École Polytechnique de Montréal / Hôpital Ste Justine
- Étudiante Maitrise Recherche en Génie Mécanique
2007 - 2010
Sujet de Maîtrise : Étude biomécanique des mécanismes de progression d’une maladie musculo-squelettique.
• Analyse du cahier des charges
• Développement et Validation d’un modèle éléments finis
• Programmation
• Études Mécaniques/Résistance
• Étude Statistique
• Rédaction d’un article scientifique en Anglais
Environnement : (ANSYS v11, Statistica…)
-
SAINT GOBAIN EMBALLAGE
- Ingénieur Stagiaire
2007 - 2007
Stage Ingénieur : Remise à jour d’un dossier de fabrication pour la réalisation des bouteilles en verre à Grands Contenants (3L à 15L).
• Analyse du Cahier des charges
• Création de base de données
• Ecriture de compte rendus/ Rapports de fabrication
• Amélioration des procédures de production
• Création d’un dossier de fabrication pour la formation des techniciens
Environnement : (Microsoft Office…)
-
FRESA (Actuellement AIR LIQUIDE)
- Ingénieur Stagiaire
2005 - 2005
Stage Ingénieur : Mise en œuvre, installation et modification d’une machine en vue d’améliorer la productivité de la ligne d’emballage d’électrodes enrobées pour le soudage à l’arc.
• Ecriture d’un cahier des charges
• Conception du système
• Réalisation et implantation
• Démarchage et appels d’offres
• Réalisation de plans
• Mise en place d’essais
• Programmation
Environnement : (AutoCAD…)