Mes compétences :
Lean 6 sigma
Manufacturing
Manufacturing supply
Supply chain
Gestion de projet
Maintenance
Technique
Entreprises
Ipsen
- Responsable Maintenance
Boulogne-Billancourt 2013 - maintenantEncadrement et gestion d’une équipe pluridisciplinaire de techniciens et cadres
Installation d’une nouvelle organisation du service avec une orientation satisfaction client
Intégration des approches amélioration continue dans le fonctionnement routine du service
Amélioration de la disponibilité des installations de 2% avec une réduction des couts de 20% sur 2 ans
En charge d’un projet corporate visant à l’amélioration globale des services maintenances : définition des KPI, installation d’audits de maturité, benchmark, élaboration des feuilles de routes pour chaque site
Ipsen
- Operational Excellence Leader
Boulogne-Billancourt 2012 - 2013
Lafarge
- Continuous Improvement Manager at
Paris2011 - 2012-In charge of the implementation of the continuous improuvement at Lafarge plasterboard plant (Carpentras)
Poclain Hydraulics
- Procurement Superviser
Verberie2010 - 2011In charge of a team of 4 persons; by the leading the procurement function for all the business unit (Poclain Hydraulics s.r.o Brno)
Poclain Hydraulics
- Project Engineer
Verberie2008 - 2010Project Manager continuous improvement and industrialization
Project Management Team (2 to 19 people, 4 different nationalities). Languages used in work: Czech 60% English 40%
Lean 6 sigma
- Reduction of the global company inventory by 25%: 12 month duration
-Improvement of the overall productivity of assembly lines by 11%
Industrial and technological project manager
EIFFAGE TP
- Management of an industrial project
Vélizy-Villacoublay2007 - 2008Management of an industrial project to develop a new TEXSOL machine: market research, development of a functional requirements specification, management of invitation to tender, definition of a budget, implementing plans to manufacture, trade consultations, pilot production of the various parts of the product, overseeing first site scheduled before June 2008
SONATRACH
- Designer
2006 - 2006responsible for project studies on the dimensions of swamp coolers used in pipelines systems. Thermodynamic analysis of the project and development of engineering solutions adapted to the problems identified
General Electric
- In charge of a 6 sigma green belt project
Paris2006 - 2006in charge of a 6 sigma project which has as its subject the improvement of the external logistics, animation brainstorming to define the real expectations of GE in terms of delivery times, development of team's charter with the management of three collaborators, analysis of delays caused by suppliers, design new metrics, connect to Oracle data bases that permit the suppliers’ analysis. Training in lean manufacturing and 6-sigma methodology.
Total
- Consultant
COURBEVOIE2006 - 2006within a team of student engineers, preparation, development and review of statistical survey project of the exit flow of fuels. The goal was the optimization of the site
Formations
Brno University Of Technology (Brno)
Brno2005 - 2008Double diplôme France – Europe centrale et oriental