EIFFAGE METAL
- Ingénieur d'affaires
Vélizy-Villacoublay
2015 - maintenant
Ingénieur d'affaires
NAIAX Project - Construction of Unibridge Type Bridge (3000 tons)
NAIA Expressway alignment (Philippines)
EIFFAGE Construction Métallique, Fos-sur-Mer, France
Relevant tasks:
* Project management (4.8M EUR budget)
* Follow-up of financial reports
* Invoice issuance
* Project reporting
* Project contract management
* Sub-contractor management
-
Eiffage Infrastructures
- Planning Reporting Manager
Vélizy-Villacoublay
2014 - 2014
PLANNING REPORTING MANAGER
EPCC - OFON PHASE 2 Project - OFQ Living Quarter
TOTAL E&P NIGERIA LIMITED - HOOK UP OML 102 (Site rotations - Offshore)
EIFFAGE Construction Métallique, Fos-sur-Mer, France
Planning/Reporting manager and Logistic Coordinator, Hook-Up Coordinator
Relevant tasks:
* Building of Hook-Up Schedule (Primavera P6)
* All disciplines activities (STR, PVV, EIT, HVAC, COR, COM, etc) ;
* Building of WBS (Work Breakdown Structure)
* Activity network analysis ;
* Ressources assignement (S-Curves and Histograms) ;
* Workload analysis ;
* Progress documents preparation (progress table, progress sheet) ;
* Baseline planning
* Layout preparation
* Follow-up of Hook-Up schedule (weekly update)
* Building dedicated planning
* Follow-up remaining task (punch-list)
* Follow-up of progress documents (Overall progress, S-Curves, Histograms, etc.)
* Daily progress report issuance (Mobilization, tasks, etc.)
* Hook-Up reporting (Weekly/monthly report issuance)
* Logistic coordination (Headquarter, Onshore base; Offshore)
* Hook-Up task coordination (multi disciplines coordination)
-
Eiffage Infrastructures
- Planning Reporting Manager
Vélizy-Villacoublay
2012 - 2013
PLANNING REPORTING MANAGER
EPCC - OFON PHASE 2 Project - OFQ Living Quarter (4500 tons) Jacket (700 tons)
TOTAL E&P NIGERIA LIMITED - CONSTRUCTION (Worksite mobilization)
EIFFAGE Construction Métallique, Fos-sur-Mer, France
Relevant tasks:
* Building of the EPC project schedule (Primavera p6)
* Multi scope activities (Eng, Proc, Construction, Commissioning, Hook-Up) ;
* Several worksites planning integrated into overall schedule ;
* All disciplines activities (STR, PVV, EIT, HVAC, COR, COM, etc) ;
* Building of WBS (Work Breakdown Structure)
* Activity network analysis ;
* Ressources assignement (S-Curves and Histograms) ;
* Workload analysis ;
* Progress documents preparation (progress table, progress sheet) ;
* Baseline planning
* Layout preparation
* Follow-up and update of project schedule (monthly update)
* Follow-up and review of sub-contractor schedule (weekly review)
* Follow up of the worksites progress and roll up to the overall project progress
* Monitoring of construction at 2 local worksites (Lagos and Port Harcourt)
* Scheduling and progress measurement procedure
* External sub-contractors prefabrication and installation follow up
* Training course to local planning engineers
* Project reporting (weekly, monthly reports)
* Work statement preparation for monthly invoice
-
Eiffage Infrastructures
- Planning Reporting Manager
Vélizy-Villacoublay
2010 - 2012
PLANNING REPORTING MANAGER
EPCCI - ANGUILLE Redevelopment Project -AGMN Wellhead (1200 tons) Jacket (800 tons)
TOTAL GABON Limited - Construction & Hook Up (6 weeks in Gabon)
EIFFAGE Construction Métallique, Fos-sur-Mer, France
Relevant tasks:
* Building of the EPCCI project schedule (Primavera p6 v7, ICAPS)
* Multi scope activities (Eng, Proc, Construction, Commissioning) ;
* All disciplines (STR, PVV, EIT, HVAC, COR, COM, etc) ;
* Building of Baseline planning
* Follow up of the progress (S-curves, Histograms)
* Follow-up of sub-contractor progress ;
* Follow-up of actual progress regarding planned ;
* S-curves et Histograms issuance
* Follow up of the sub-contractors schedule
* Building of the hook up schedule
* Building of job cards
* Building of progress documents
* Icaps coordinator for the hook up phase
-
VEOLIA EAU
- INGENIEUR STAGIAIRE AUTOMATISME
Paris
2010 - 2010
Intégration de nouveaux équipements et optimisation de l'automatisme générale YOKOGAWA
Mise en place d'une démarche qualité continue - Méthode 5S appliquée au laboratoire micro-biologique
-
MACLEAN POWER FRANCE
- STAGIAIRE ASSISTANT INGENIEUR
2009 - 2009
Détermination de temps moyens de production par chrono-analyse video
-
ICARE, laboratoire microbiologique
- PROJET INGENIEUR
2008 - 2009
Conduite d'un projet 5S sur le stock d'approvisionnement du laboratoire
-
Société Mécanique de Précision
- OPERATEUR STAGIAIRE
2008 - 2008