Menu

Arnaud PELLET

Bolton

En résumé

Pas de description

Entreprises

  • Husky Injection Molding Systems - Business Advisor South America

    Bolton 2013 - maintenant Drive local market intelligence in Beverage Packaging
    Own Application Development Roadmap for Packaging key accounts and early innovators
    Objectives: Drive incremental business on proactive selling (B to B) on refurbishment / conversion activity
  • Husky Injection Molding Systems - Project Engineer

    Bolton 2010 - 2013 Responsible for ensuring that customers' orders are processed in a timely, costly and quality manner.
    Coordinating projects through the various stages of completion,
    working closely with the customers and engineering, manufacturing, sales departments.
    Responsible for the host of customer visits, project quotes develops, product presentation, application verification and machine/mold verifications.

    Working with different region such as India and Middle East.
  • Nestle Waters R&D Center - PTC - Project Engineer

    2007 - 2010 Sandwich program at engineering department for HOD business
    • 5 Gallon caps:
    - Technical benchmark (suppliers, specifications and evaluation)
    - Development and implementation of laboratory test methods
    • Alternative material to replace PC:
    - Benchmark on material and technologies
    - Implementation of new testing protocol for bottle and resin evaluation.

  • Nestle Waters - Project Engineer

    Issy-les-Moulineaux 2006 - 2007 Source PERRIER in sandwich program in packaging department. (11 months at the factory)
    • Development of new packaging within a team of 6 people
    -Technical support for Perrier FLUO implementation (preform, bottle, shrink film,
    interlayer, and test for validation)
    - Coordination of tests with Laboratoire National d’Essai (LNE) for palette validation
    • Eradicate the corrosion on crown steel cap for glass bottle (consumer complaint)

Formations

Réseau

Annuaire des membres :