Cost control ,Plannig of all services ,prospecting of all services,technical assistance.
3rd Party SEREPT 2010 – 2011 (1 an)
Reboiler reception : SOCOMENIN – AMELYA (ITALY) .
Valve reception according to API 6D: SOCOMENIN –MECATORCK (FRANCE).
Air receiver reception according: SOCOMENIN –MECATORCK (FRANCE).
Hydrotest of Decanter :SOCOMENIN -SEREPT TUNISIA.
Hydrotest of Column :SOCOMENIN -SEREPT TUNISIA.
Inspection of lifting sets according to BS 12079 - SAROST TUNISIA.
Inspection of offshore containers according to BS 12079 - SAROST TUNISIA .
Pipe reception : BRITSH GAS – UMRAM CELIK BORU (TURKEY) .
Hydrotest of pipeline 15 Km GAZODUC:TPS - PROJECT HAGOUNA TUNISIA.
Hydrotest - PIRECO - PROJECT HASDRUBAL PETROFAC
QA/QC engineer - PIRECO - PROJECT HASDRUBAL PETROFAC
NDT monitoring - PIRECO - PROJECT HASDRUBAL PETROFAC
Senior QA\QC - PIRECO - PROJECT SOUR GAS Worley Parsons .
Leak test :GTS – TUNISIA-SFAX.
Forcklift inspection according to TUNISIAN regulation:GTS – TUNISIA-SFAX.
Crane inspection according to TUNISIAN regulation:GTS – TUNISIA-SFAX.
lifting sets inspection according to TUNISIAN regulation:GTS – TUNISIA-SFAX.
Pneumatique test of the tank according to API 650 storage RIMAR – SKHIRA.
Inspection of Casing and Tubing according to 5CT: SAROST- Alpha Petroleum
Trainning of Device driver: cranes and forklifts : SOTRIM- TUNISIA.
Accumulation of Hydrotest of pipeline 153 Km GAZODUC : BOUCHAMOUI Industries TUNISIA.
Accumulation of Hydrotest of pipeline 46 Km GAZODUC : RETEL TUNISIA.
3rd party of Revamping Project :SOCOMENIN -SEREPT TUNISIA.
Periodic inspection for elevator : GE-STEG – SFAX
Thickness mesurement : GE-STEG – SFAX
Endoscopic control : GE-STEG – SFAX.
Pressure vessel inspection -SEREPT-SOCOMENIN – SFAX
Hydro test pressure vessel -SEREPT-SOCOMENIN – SFAX
Hydro test pressure Steam Boiler - CPC -Tunis
Senior QA/QC Sour Gas Project
PIRECO
octobre 2006 – décembre 2009 (3 ans 3 mois)
Welding Inspector Sour Gas Project
Hydraulic Inspector of Test
Follow‐up of the daily advance of production
Follow‐up of the welders
Follow‐up of control NDT
Control Document
Planning with MS-Project
Shut Down 2008
Owner of a station Super Lavage février 2006 – mai 2007 (1 an 4 mois)
Owner of a station of washing and another service Car

Mes compétences :
Authorized inspector by Ministry in Steam Boiler
API 653 - Above Ground Storage Tank Inspecto
Training ISO 9001
Microsoft Office
Authorized inspector by Ministry inPressure Vessel
PV - Elite
Inspection
Robot Structural Analysis
Authorized inspector by Ministry in Pipelines
NDT
Training ISO 14001
Training OHSAS 18001
Loyyds lifting inspector

Entreprises

  • TIC - Technical Responsablecw

    2013 - maintenant
  • Smart Inspection Services - Branch Area Manager

    El Manar Tunis 2013 - 2013
  • Professional Inspectors - Branch Manager

    2009 - 2013
  • PIRECO - Senior QA/QC

    Les Berges du Lac 2007 - 2009

Formations

  • ENIS (Sfax)

    Sfax 2009 - 2010 Mastère professionnel


  • ENIS (Sfax)

    Sfax 2004 - 2008 Diplôme d'Ingénieur
  • ISET (Sfax)

    Sfax 2001 - 2003 Technicien Supérieure

Réseau

Annuaire des membres :