2015- SAIPEM MALAYSIA
Project Fabrication Representative
fabrication pressure vessel Kaombo project

2014-2015- SAIPEM SA, KARIMUN BRANCH , INDONESIA .
Project Engineer
Jangkrik project fabrication topside

20120-2014 SAIPEM DO BRAZIL
Project fabrication Manager

2011-2012 SAIPEM SA, JAKARTA, INDONESIA
lead Method Construction - GORGON Project Barrow Island LNG
Fabrication Yard: PT Hanjung, Bandar Lampung, Indonesia.

•Engineering and controlling of activities such as crawler crane lifting (single or multi lifts), roll-up of jacket panels using cranes and winches, lifting & transportation of structure components, structure construction technologies, mooring of barges, ballasting for load-out activities.
•Definition and verification of engineering study philosophies, verification of calculation notes and method statements procedures.
•Reporting to the Project Engineering Manager and assuming the coordination with the drafting office.
•Training of expatriate and local junior engineers.

2010 SAIPEM SA, PAU, FRANCE
Site Representative – USAN Project

•Responsible for all onshore fabrication, construction, hook up and pre-commissioning works for offshore installation
•Carry out all construction and fabrication supervision / monitoring activities required for the successful delivery of the Contracts assigned.
•Implement Company HSE policies and Contract HSE requirement.
•Assist in constructability reviews and the planning and scheduling of construction jobs.
•Close Liaison with contractors and their sub-contractors, ensuring all permits to work are in place and problems are efficiently and timely solved.
•Ensure Projects are completed and handed over on schedule.
•Supervises the works of the project team.


2006-2010 SAIPEM SA, PORT HARCOURT, NIGERIA
Technical office Method Construction – Project USAN & AKPO
•Feasibility studies of construction operations, construction assembly studies, yard layouts and workshop construction activities studies.
•Structural designing and calculations.
•Preparation of various construction method statements, checking of construction drawings, coordination between engineering and construction.
•Creation of a methods construction entity. Training of future local workforce.
•Prefabrication / Fabrication, loading and jacking-up of Piping on AKPO Project


2006 PETROMAR, SOYO BASE, Angola
Lead 0ffice Method – Project Rosa Bhor

•Design on Autocad of an assembly workshop for 1 mile RISER TOWER for deep field.
______________________________________________________________________________________________________

2006 PETROMAR, Ambriz, Angola
Lead Method Construction – Multiple projects - Projet KIZOMBA A & B, ROSA LIRIO Seal Quad

• Design and creation of a welding -seal quad of a production line in a coating workshop and FDS loading.
• Method Construction of jumpers spool and flet, with assembling lifting sequence in order to optimize and make easier the construction.
• Finalization of the as-built drawings onshore / offshore
______________________________________________________________________________________________________

Before 2006 Technor, France
Draftsman – Multiple projects - Projet KIZOMBA A & B, ROSA LIRIO Seal Quad

• Superintendant on multiple sites in France, and in particular industrial sites, such as incineration factory, ciment industry and petrochemical industry.







French: Mother Tongue
English: Fluent
Computer skills: Word, Power Point, Excel, Autocad

Mes compétences :
Pétrochimie
AutoCAD
Management
fabrication supervision / monitoring
Responsible for all onshore fabrication
Microsoft Word
Microsoft Project
Microsoft PowerPoint
Microsoft Excel
Autocad Tekla Microstation
Ingénierie
Étude de faisabilité de projets
Organisation du travail

Entreprises

  • Saipem bresil - Fabrication Manager

    2012 - maintenant
  • SAIPEM DO BRAZIL - Project Construction Manager

    2012 - maintenant * Responsible for all onshore fabrication, construction, hook up and pre-commissioning works for offshore installation ;
    * Carry out all construction and fabrication supervision / monitoring activities required for the successful delivery of the Contracts assigned. ;
    * Implement Company HSE policies and Contract HSE requirement. ;
    * Assist in constructability reviews and the planning and scheduling of construction jobs. ;
    * Close Liaison with contractors and their sub-contractors, ensuring all permits to work are in place and problems are efficiently and timely solved.
    * Ensure Projects are completed and handed over on schedule. ;
    * Supervises the works of the project team. ;
  • SAIPEM INDONESIA - Lead Methode Construction

    2011 - 2012 Lead Method Construction - GORGON Project Barrow Island LNG
    Fabrication Yard: PT Hanjung, Bandar Lampung, Indonesia.

    * Engineering and control of activities such as crawler crane lifting (single or multi lifts), roll-up of jacket panels using cranes and winches, lifting & transportation of structure components, structure construction technologies, mooring of barges, ballasting for load-out activities. Yard layouts, manufacturing workshop and painting workshop, coordination of work ;
    * Definition and verification of engineering study philosophies, verification of calculation notes and method statements procedures. ;
    * Reporting to the Project Engineering Manager and coordonating the drafting office. ;
    * Training of expatriate and local junior engineers. ;
  • SAIPEM - Site Representative

    Montigny-le-Bretonneux 2010 - 2010 * Responsible for all onshore fabrication, construction, hook up and pre-commissioning works for offshore installation ;
    * Carry out all construction and fabrication supervision / monitoring activities required for the successful delivery of the Contracts assigned. ;
    * Implement Company HSE policies and Contract HSE requirement. ;
    * Assist in constructability reviews and the planning and scheduling of construction jobs. ;
    * Close Liaison with contractors and their sub-contractors, ensuring all permits to work are in place and problems are efficiently and timely solved. ;
    * Ensure Projects are completed and handed over on schedule. ;
    * Supervises the works of the project team. ;
  • SAIPEM NIGERIA ( SCNL LTD) - Method Construction Technical Office

    2005 - 2010 Method Construction Technical Office - Project USAN & AKPO

    * Feasibility studies of construction operations, construction assembly studies, yard layouts and workshop construction activities studies. ;
    * Structural designing and calculations. ;
    * Preparation of various construction method statements, checking of construction drawings, coordination between engineering and construction. ;
    * Creation of a methods construction entity. Training of future local workforce. ;
    * Prefabrication / Fabrication, loading and jacking-up of Piping on AKPO Project ;
  • PETROMAR - Lead 0ffice Method

    Bucharest 2004 - 2004 Lead 0ffice Method - Project Rosa Bhor

    * Design on Autocad of an assembly workshop for 1 mile RISER TOWER for deep field. ;
  • Saipem - Project engineer fabrication

    Montigny-le-Bretonneux 2003 - maintenant
  • PETROMAR ( SAIPEM ANGOLA ) - Lead Method Construction

    2003 - 2003 Lead Method Construction - Multiple projects - Projet KIZOMBA A & B, ROSA LIRIO Seal Quad

    * Design and creation of a welding -seal quad of a production line in a coating workshop and FDS loading. ;
    * Method Construction of jumpers spool and flet, with assembling lifting sequence in order to optimize and make easier the construction. ;
    * Finalization of the as-built drawings onshore / offshore ;
  • Saipem-sa - Lead Method construction

    Montigny-le-Bretonneux 2003 - 2012
  • TECHNOR - Draftsman

    1979 - 2003 Technor, - Multiple projects - Projet KIZOMBA A & B, ROSA LIRIO Seal Quad
    * Superintendant on multiple sites in France, and in particular industrial sites, such as incineration factory, ciment industry and petrochemical industry.