Consultant Pétrole
- Leader Inspection Baseline
maintenant
-
TOTAL/Dietsmann/Cegelec Oil&Gas
- Leader Inspection baseline
maintenant
FPU ALIMA/ FPSO AKPO/ FPSO USAN
-
TOTAL OFON2
- Inspection & Ingénierie Field Operation MIEC
2012 - maintenant
Inspection & lead MIEC on Site Construction
-
Total
- INSPECTION ENGINEER
COURBEVOIE
2012 - 2014
New Build OFP2-OFON2 2012-2014: INSPECTION ENGINEER - Lead Inspection In
----- (Job Description Attached) & Maintenance Support
Support StartUp & Commissioning
Support Storage & Preservation Package & Equipment
Support Quality Control to QAQC
OFFSHORE SITE / Inspection Lead - All EPCC's
In Charge of OFQ-OFP2-OFP1 Integration and Modification ,
-
FPSO USAN Korea
- LEAD INSPECTION
2009 - 2011
-
FPSO AKPO Nigeria
- LEAD INSPECTION
2009 - 2009
New Build FPSO 2008: DEPUTY LEAD INSPECTION SITE BASELINE on FPSO AKPO
Year 2008 : TOTAL UPSTREAM NIGERIA LIMITED
Baseline Inspection Supervisor Field Operations
FPSO AKPO Project
-
FPSO AKPO
- LEAD INSPECTION
2008 - 2008
Inspection on site Onne Nigeria `` Baseline'' ; Rotation 4x4
(Before boarding on
. Finality Document Baseline Inspection
. Development of an inspection report and subjection of
Corrective actions with Team Start Up & Maintenance
HEAD OF MIE TOTAL:
-
Total
- LEAD INSPECTION
COURBEVOIE
2008 - 2008
. Inspection on site Ulsan Corée `` Baseline'' ; Rotation 8x2
. Documents Checking for conformity
. Visual Inspection Pressure vessel, Pressure safety valve,
Lifting
. Thickness Measurement of the piping steel & Vessel
according to inspection area
. Visual monitoring of the piping, research for Main defect..."
. Visual monitoring of the self-supporting quality piping &
equipment, defect "insulation"
. Visual monitoring of the floor, research for defect "fixing"
. Visual monitoring of the whole Secondary and tertiary
structures
. Reporting Photo ; all Item Inspection
. Reporting areas of PT Corrosion on the scale, defect of
coating and construction
. Development of an inspection report and subjection of
corrective actions with Team construction & Commissioning
Leader Project Inspection/Maintenance TOTAL :
-
DIETSMANN TECHNOLOGIES
- Inspector - Engineering
2007 - 2007
FPU MOHO BILONDO ``ALIMA''
Inspector - Engineering Structure Corrosion
Study of Corrosion Criticality of the FPU Structures Topside &
Equipment
MIEC DIETSMANN For ``TOTAL E&P CONGO''
Site Office Engineering Dietsmann (France)
. Referencing of the structural elements according to procedure of the
customer
. Actualization of the scales
. Development of an inspection scale according to the criticality of the
corrosion
. Installation of a scope for inspection on site
. Development WSE; determination of areas of inspection on scale
. Codings of inspection areas according to the control method
. Structural identifications by Primary/Secondary/Tertiary criterion
. Determination of level of corrosivity on the structure according to the
environment
. Regrouping datas on EXCEL board
. Development functional topo of the structure
. Installation Inspection file
Site Office Total Corée (Ulsan)
. Inspection on site Corée Leader Baseline Inspection
. Documents Checking for conformity of Integrity
. Visual monitoring of the Primary structures, according to the
conformity Scales
.Thickness Measurement of the paint coat "Microtest "
. Thickness Measurement of the piping steel & Vessel
according to inspection area
. Visual monitoring of the piping, research for Main defect..."
. Visual monitoring of the self-supporting quality piping &
equipment, defect "insulation"
. Visual monitoring of the floor, research for defect "fixing"
. Visual monitoring of the whole Secondary and tertiary
structures
. Reporting Photo (Power point); zone of splash & zone by
level
. Reporting areas of PT Corrosion on the scale, defect of
coating and construction
. Development of an inspection report and subjection of
corrective actions with Team construction & Commissioning
Clients: DIETSMANN TECHNOLOGIES
Manager Corrosion Engineer: Mr Fonetchoura Eric
HEAD OF MIE Total
on AKPO Project Onshore New Build FPU Jan-Dec 2007 : LEADER INSPECTION SITE BASELINE on
Engineering FPU Structure DIETSMANN ,
-
LEADER INSPECTION Coating
- Baseline Inspector
2006 - 2006
FPU MOHO BILONDO ``ALIMA'' TOTAL 2006 : LEADER INSPECTION Coating / Corrosion TOTAL E&P
-
TOTAL E&P
- Inspector & Supervisor
2006 - 2006
° Campaign inspection Vessels Offshore external and internal
° Campaign inspection Structure Offshore / Corrosion
- Insulation system
- Degas of capacity ;
- Cleaning internal of capacity ;
- Opening and closing of the equipment ;
- Inspection internal/external UT - NDT-
- Corrective action
Office : France ``Mission export ; specific''
Clients : TOTAL EP QATAR
Manager Total : Inspection & Corrosion Engineer :
painted Platform DP1 // The Al Khalij oilfield is located
offshore Qatar, Block 6, approximately 110 km east of the
mainland and 45 km NE of Halul Island.
In charge of the supervision, the day to day planning and the
quality of the work in accordance with Total specifications.
Assist TEPQ , whenever it is necessary, make some quality or
safety audits
Office: France "Mission Export; Specific "
Clients: TOTAL EP QATAR
Manager Total : Inspection & Corrosion Engineer :
-
DIETSMANN TECHNOLOGIES
- Inspector - Engineering
2004 - 2006
AKOGEP Phase 2
Inspector - Engineering Structure Corrosion "in freelance"
Study of Corrosion Criticality of the Platforms structures AMP2 &
AMD3 "Jacket & Topside" AKOGEP Phase 2
Office: France "Mission Export; Specific "
Clients: TOTAL/EPNL
. Referencing of the structural elements according to procedure of the
customer
. Actualization of the scales
. Development of an inspection scale according to the criticality of the
corrosion
. Installation of a scope for inspection on site
. Development WSE; determination of areas of inspection on scale
. Codings of inspection areas according to the control method
. Structural identifications by Primary/Secondary/Tertiary criterion
. Determination of level of corrosivity on the structure according to the
environment
. Regrouping datas on EXCEL board
. Development functional topo of the structure
. Installation Inspection file
. Inspection on site Nigeria Baseline;
. Documents Checking for conformity
. Visual monitoring of the Primary structures, according to the
conformity Scales
.Thickness Measurement of the paint coat "Microtest "
. Thickness Measurement of the piping steel & Vessel
according to inspection area
. Visual monitoring of the piping, research for Main defect..."
. Visual monitoring of the self-supporting quality piping &
equipment, defect "insulation"
. Visual monitoring of the floor, research for defect "fixing"
. Visual monitoring of the whole Secondary and tertiary
structures
. Reporting Photo (Power point); zone of splash & zone by
level
. Reporting areas of PT Corrosion on the scale, defect of
coating and construction
. Development of an inspection report and subjection of
corrective actions
Office: France "Mission Export; Specific "
Clients: DIETSMANN TECHNOLOGIES
Manager Corrosion Engineer : Mr Sainrapt Olivier
PIC - Person in Charge // Campaign
painted Platform New Build PLTs 12/2004-01/2006 : LEAD INSPECTION QC & Baseline DIETSMANN on PLT AMP2
for TOTAL E&P AKOGEP Phase 2 AMP2 ,
-
SCPP- TOTAL
- TOTAL & AGIP CONGO executive
2003 - 2004
CONGO E&P CONGO
Responsible of the quality insurance/Interim HSE "In freelance"
Installation of the system & the quality insurance document
Mission : TOTAL & AGIP CONGO executive Contrat Obtained
Office: PNR CONGO "Mission; "resident''
Clients : TOTAL-AGIP-SCHLUMBERGER-SCLOG-
HALLIBURTON...
Main Businesses: TOTAL & AGIP executive Contrat Obtained-
Revamping of Seven SCLOG tanks" fuel deposit"
. Responsible for the technical finalization of the SCPP establishment
. Responsible of the relationship for the quality between TOTAL &
SCPP.
. Development of technical & Quality documents for the TOTAL
accreditation
. Installation of technical & Quality documents for the GEPI
(consortium of industrial painting) to become a member
. Responsible for the followed-up of the staff training (examination
ACQPA via TOTAL)
. Responsible marketing and study of the important TOTAL & AGIP
call bids
. Monthly Participation in HSE of TOTAL meeting
. Supervision and coordination work of revamping seven SCLOG
tanks
. Participation in the kick off meeting, with all the speakers
. Installation of mob/demob logistics building site
. Following-up the phases for assembling, scaffolding for
APAVE certification
. Following-up the phases for surface scouring, ACQPA-
FROSIO procedure
. Following-up the Phases for painting application, ACQPA-
FROSIO procedure
. Following-up the Phases of work reception, by the client
Responsible of the inspection and the quality control;
. Control of the painting conformity
. Control of the media conformity "grit" cleanliness, granulometry
. Scope control required by the client
. Climatic control "hydrometry" to start work
. Material implementation control "Air cleanliness''
. Control after scouring, surface roughness according to the scope
. Cleanliness of surface control before paint application
. Control of qualified staff
. paint coat control wet film "wet measure"
. paint coat control dry film "microtest
. Notification of the various phases on quality card
. Development of traceability document client/company
. Responsible for the investigations on offshore & onshore oil rig site
for the clients for call bids:
. Visual report of corrosion level
. Determination of areas which need to be treated
. Test of painting adherence, pull of test
. Procedures of work completion
. material & human ways to work
. times of work preparation and execution
. Study of Environmental risk
. Development of an insurance quality scale & HSE scale for each
Mission
TOTAL EP CONGO
Interlocutor/Manager Corrosion Engineer : Mr Lamige Jean-Paul
Leader of the quality Insurance/Interim HSE ,
-
SPI CONGO Coating
- Technical Executive Assistant
2002 - 2002
: Technical Executive Assistant "Adviser & Shareholder"
Technical Adviser for SPI inplantation in
: Technical exectutive Assistant "Adviser & Shareholder" Technical
Adviser for SPI inplantation in CONGO
Mission : Accreditation of TOTAL CONGO
Office: France "Mission Export; Specific''
Clients: TOTAL-AGIP-SCHLUMBERGER-SCLOG-
HALLIBURTON
. Participation in the Assembly meetings "France"
. Participation in the Recruitment of the expatriated staff
. Participation in the investments choices
. Responsible of the relationship between the various local
Governments
. Participation in the studies of Main call bids
. Adviser on the local suppliers selection
. Adviser for materials & Human logistics
. Adviser on the technical procedures for executing
works
-
RASIC INTERNATIONAL
- Technical Executive Assistant
1999 - 2001
"Adviser & Shareholder"
Technical Adviser for SPI inplantation in 01/1999-12/2001 : Branch manager "Managing & Associated"
Commercial & Technical Management
Commercial & Technical Management
Mission: Accreditation of ELF CONGO
Office: PNR CONGO "Resident"
Main Client: ELF CONGO
Businesses: Acquisition of the executive Contrat of Elf Congo
. Putting into place RASIC structure
. Responsible for the assembly of the status files of the company
. Responsible for the construction of the base "offices and
warehouses"
. Responsible for logistics; importation of the material from France
. Responsible for the public relations & the administrative and local
customs
files
. Responsible for the recruitment of the local staff
. In charged of recruiting an expatriated Technical engineer
. Putting into order the directives to be followed and objectives to be
reached
. Responsible for the technical & safety files of the RASIC
implantation
. In Charged of the relations for introducing RASIC to ELF
. Development of the technical & Quality documents to get the
accreditation from ELF
. Development of technical & Quality documents internal RASIC
. Responsible for the follow-up and the safety training course for
ELF staff
. In Charged of the investigations on offshore & onshore sites for
the clients
for eventual call bids
. Participation at monthly meeting HSE from ELF
. Organising internal meeting for the staff "meeting courses &
safety"
. Responsible of the inspection and the quality control;
. Control of the painting conformity
. Control of the media conformity "grit" cleanliness, granulometry
. Scope control required by the client
. Climatic control "hydrometry" to start work
. Material implementation control "Air cleanliness''
. Control after scouring, surface roughness according to the
scope
. Cleanliness of surface control before paint application
. Control of qualified staff
. paint coat control wet film "wet measure"
. paint coat control dry film "microtest
. Notification of the various phases on quality card
. Development of traceability document client/company
. Responsible for the investigations on offshore & onshore oil rig site
for the clients for call bids:
. Visual report of corrosion level
. Determination of areas which need to be treated
. Test of painting adherence, pull of test
. Procedures of work completion
. material & human ways to work
. times of work preparation and execution
. Study of Environmental risk
. Development of an insurance quality scale & HSE scale for each
Mission
TOTAL EP CONGO
Interlocutor/Manager Corrosion Engineer : Mr Corbineau
-
ANTIROUIAFRIQUE
- Interim Branch manager
1996 - 1998
: ANTIROUIAFRIQUE-CONGO Coating "Registered office Gabon"
Technical Leader Department (Interim Branch manager)"
: ANTIROUIAFRIQUE-CONGO "registered office Gabon"
Technical Leader Department (Interim Branch manager)" in Freelance"
Management: Technical & Commercial
Mission : to get Accreditation of ELF CONGO & To promote the
company
Office: PNR CONGO "Resident"
Main Client: ELF CONGO
Main Businesses: Two Tanks in work of Neuvage, KITINA project AGIP
client; Project Leader Manager AGIP Mr. Celestino LEDRI "Supervision
& ELF Coordination"
. Responsible for the relations & the administrative and local customs
files
. Responsible for the recruitment of the local staff
. In charged of recruiting an expatriated Technical engineer
. Putting into order the directives to be followed and objectives to be
reached
. Responsible for the technical & safety files of the company
. Responsible for the relations between ELF & AGIP
. Development of technical & Quality documents for the ELF & AGIP
accreditation
. Installation of technical & internal Quality documents of the company
. Responsible for the followed-up and the safety training course of
ELF staff
. Responsible Marketing and study of call bids
. Montly Participation in HSE from ELF meeting
. responsible in setting internal meeting with the staff "training course,
meeting & safety"
. Project leader of Coat painting "Int/Ext." of the Two floating roof tanks of
KITINA Project (oil rig deposit/ELF-DJENO Deposit); 2 X 70000 m3
. Participation in the kick off meeting, with all the speakers
. Installation of mob/demob logistics building site
. putting in two teams Dayshift/nightshift
. Following-up the phases for surface scouring, ACQPA-FROSIO
procedure
. Following-up the Phases for painting application, ACQPA-
FROSIO procedure
. Following-up the Phases of work reception, by ELF (Mr. Menela,
Mr. Jean louis Brazy)
. Responsible of the inspection and the quality control;
. Control of the painting conformity
. Control of the media conformity "grit" cleanliness, granulometry
. Scope control required by the client
. Climatic control "hydrometry" to start work
. Material implementation control "Air cleanliness''
. Control after scouring, surface roughness according to the scope
. Cleanliness of surface control before paint application
. Control of qualified staff
. paint coat control wet film "wet measure"
. paint coat control dry film "microtest
. Notification of the various phases on quality card
. Development of traceability document client/company
. Responsible for the investigations on offshore & onshore oil rig site for the
clients for call bids:
. Visual report of corrosion level
. Determination of areas which need to be treated
. Test of painting adherence, pull of test
. Procedures of work completion
. material & human ways to work
. times of work preparation and execution
. Study of Environmental risk
. Development of an insurance quality scale & HSE scale for each
mission
-
SPI
- Work Supervisor & Coordinator
1990 - 1993
Management: Building site & staff
Mission : Offshore & Onshore Work
Office: FRANCE "Mission export; Specific "
Main Client: ELF GABON
Main missions: Tanks of the Oil terminal ELF CAPE LOPEZ -
Offshore/platform TORPEDOES - Offshore/GRONDIN platform
II/ PROFESSIONAL EXPERIENCES DETAILS