BOURBON - TOTAL E&P
- OFFSHORE CONSTRUCTION SUPERVISOR
2016 - maintenant
Onboard BE805 and BO101 to carry out following activities:
IMR & new installation installation (X-Tree, Subsea module, jumper tie in, HFL's & EFL's flying leads) on Block 17 and 32.
-
SBM Offshore
- SHIFT SUPERVISOR
SCHIEDAM
2014 - 2015
Shift Supervisor Onboard Normand Installer: Offshore
* Plan, organize and execute daily task assigned for the shift (Deck, Welding, ROV) ;
-
SUBSEA7
- SHIFT SUPERVISOR
SURESNES
2012 - 2014
Shift Supervisor Onboard 7Polaris: Offshore
* Plan, organize and execute daily task assigned for the shift (Deck, Welding, ROV) ;
* Implement Subsea7 safety policy and rules
Assistant Deck foreman onboard 7Borealis and 7Polaris: Offshore
* Assist deck foreman in daily work, heavy lift (Guara & Lula project)
-
Subsea 7
- Offshore
SURESNES
2012 - 2014
-
Saipem
- Operation Engineer on Cabiunas project
Montigny-le-Bretonneux
2012 - 2012
nPreparation in office of Piplelay Offshore campaign:
-Tendering of sub-contractor (Diving, Coating, AHT)
- Liaise with Engineering department regarding installation feasibility VS planing and money
- Plannification and determination of means neccessary of offshore logistic during installatation phase
-
Saipem
- Operation Engineer
Montigny-le-Bretonneux
2011 - 2012
Operation engineer on SAIPEM fleet:
• Being project representative onboard and report to project management in office
• Liaise directly with Client onboard for technical, operational and contractual matter encountered
• Making sure operational planning is safely respected and well understood by all parties involved onboard
• Assuring materiel and vessel logistic on Field (more then 5 vessels and 2 cargo barge)
• Preparing MOC and daily task with Superintendent
• Follow of subsea asset fabrication and SIT on fabrication yard
-
ENSAM
- Assistant Engineer
Paris
2008 - 2008
* Implementation and conception of measure system to improve calibration
of dynamic sensor
-
Saipem SA
- Ingenieur travaux Offshore / Field Engineer
Montigny-le-Bretonneux
2008 - 2011
Main functions:
• Reading, performing and implementing procedures onboard Saipem vessel
• Assisting superintendent in technical matters encountered
• Assisting assistant superintendent during subsea operation with ROV
• Follow up of equipment commissioning and integration on vessel deck
• Preparation of maintenance program and planning of assigned vessel
• Writing of lesson learnt and vessel performance report
• Mobilization of barge from onshore
• Work preparation in Paris office
USAN project: S3000 HLV and FDS, Client TOTAL (September 2010 to July 2011)Offshore, Nigeria
• Mudmats and suction piles installation
• Flowlines installation
• SHR installation
NKOSSA project: S3000 HLV, Client TOTAL(September2010)Offshore, Congo
• Flexible jumper removal and installation
GEP project SCP: S3000 HLV, Client TOTAL (June 2010)Offshore, Soyo
• Free span correction, flooding and hydrotest of 12’’ line
• PLEM and spool installation
• Acoustic metrology
LIBONDO project: S3000 HLV, Client TOTAL (May 2010)Offshore, Congo
• Installation of 1off jacket 800T in upending mode with piles and conductors
• Installation of 1off deck 500T
OLOWI Project: S3000 HLV, Client CNRI (January to February 2010)Offshore, Gabon
• Splicing, laying , pulling througth Jtube and connection of DEH cable at WHTA, WHTB, WHTD
• Mattresses, anode cage, insulation cover installation
GEP project SCP: S3000 HLV, Client TOTAL (October to November 2009)Offshore, Soyo
• Preparation works and mobilization of S3000 in Pointe Noire
• Installation of 1off jacket 500T with piles and conductors
OLOWI Project: S3000 HLV, Client CNRI (September 2009)Offshore, Gabon
• Subsea spools 10’’ and 4’’ metrology, fabrication and installation
OLOWI Project: S355 lay barge, Client CNRI (May to July 2009)Offshore, Gabon
• Mobilization and installation of No. 13 km sea lines 10’’+ electrical cable in piggy back and No.1 sea line 4’’
MTOE Project: ANNA B Trenching Barge, Client CHEVRON (February to May 2009)Offshore, Cabinda
• Preparation works and mobilization of trenching barge (No.2 weeks in Paris office, No.6 weeks in Congo)
• Supervision of offshore trenching operation
ALNG Project phase II: S355 lay barge, Client Exxon Mobil (January to February 2009)Offshore, Italy
• Mobilization and installation of mattresses, spool and fiber optical cable with diving spread along LNG terminal
INAGIP Project: S355 lay barge, Client INAGIP (August to December 2008) Offshore, Croatia
• Mobilization and installation of No.2 sea lines 10’’+3’’+2’’ in piggy back
• Mobilization and installation of No.8 conductor pipes 26’’, No.2 boat landings, No.3 barge bumpers and No.1 well head module (125T)
• Installation of No.1 deck (200T)
-
ACERGY
- Assistant Project Engineer
2007 - 2007
Oil and gas subsea construction. ;
* Assistant Field Engineer during 2 weeks in offshore on Acergy Osprey