Menu

David BEAUCHET

BORDEAUX

En résumé

Après 15 années passées en Technicentre industriel de maintenance ferroviaire SNCF, je souhaite poursuivre ma deuxième partie de carrière en conjuguant technique et plaisir dans un milieu exigent et entreprenant. Mes compétences et mon obstination à vouloir toujours faire progresser l'environnement dans lequel je suis sont des atouts qui m'aideront à réussir.

Mes compétences :

construction of technical specifications
Management
Gestion de la production
Maintenance industrielle

Entreprises

  • sncf - Technicentre site de Saintes - Dirigeant d'unité opérationnelle

    2014 - maintenant Management of the rolling stock unit, with 140 people, including 8 proximity officers, a production scheduler and a quality specialist. Responsible for the QSE policy of the unit as well as the organization of the production and the Management of the rolling stock unit, with 140 people, including 8 proximity officers, a production scheduler and a quality specialist. Responsible for the QSE policy of the unit as well as the organization of the production and the respect of the costs and crossing times on VB2N, V2N, Corail.
    In charge of the deployment of operational excellence in the business teams and within the Staff.
    Develop the skills of employees, organize annual meetings and organize seminars.
    Participate in the Management Committee.
  • SNCF - Production manager

    2012 - 2014 Responsible for the quality of the TGV engines before the electrical tests, respect of the TGV R and Thalys motorways crossing time, development of the production monitoring and daily commitment of the personnel (electricians, mechanics and brake specialists)
    Reduced crossing times from 80 to 60 days.
    Reorganization of work teams by small units.
    Pilotage of the EUROSTAR half-life prototype.
  • SNCF - Proximity Leader

    2010 - 2012 Management of the team composed of 52 people including 10 supervisors, responsible for the quality of the engines, realization and monitoring of operators and testing agents, skills development and training schedule.
    Construction site 5S TGV engine blocks.
    Installation of a conformity grid before testing the TGV.
    Development of a "Feedback" database.
    100% of the checks carried out (including testing).
    Innovation bench of connectors.
    Control of the TGV parts storage site.
    Revision of electricians working time.
  • SNCF - Assistant to the project manager

    2008 - 2010 Anticipation of the needs in installations and tools, preparation of specifications, development of operating procedures, planning of major works, technological watch (trade fairs, visits to companies ...), participation in the creation of work schedules and diagrams.
    Definition of TGV SE roof treatment processes (conformity, tools, installations).
    Definition of bogies processing process: marble with measuring arms, mobile turning benches (Business trip to Manchester), devices ....
    Construction of the spécifications of a new paint tunnel.
    Realization of the treatment procedure for TGV SE roofs.
  • Sncf - Technicentre De Maintenance Industrielle - Technician

    saint denis 2007 - 2008 to the methods department : preparation of the engineering dissertation
    Development of the TGVA and TGV SE "half life" work ranges.
    Demonstration of conflicts related to installations and proposals for solutions, conceptual development of the building for TGV engines in collaboration with the Architecture Department, project budget estimate and return on investment calculation.
    Development of the spécifications of the TGV engines building and presentation of the project ( EUR 6M).
    Establishment of a aerogommage workshop in asbestose treatment sub-section 4.
    Control the modification of the NORACK electric test bench for the TGV SE.
  • SNCF - Proximity manager

    2002 - 2007 Management of the team composed of 24 people, development of agents skills, planning of legal visits, benchmarking on other SNCF sites, complex work studies, orders and follow-up of formal documents.
    Work vouchers; Target of outstanding <10
    Conduct major projects: installation of a dryer and modification of the line of the compressors of the establishment, modernization of the air network,
    Installation of the "battery treatment" site.
  • PETITBATEAU - Head of the team

    Troyes 1994 - 2002 "adjusters on circular looms at knitting service''

Formations

  • CNAM TROYES

    Troyes / Reims 2001 - 2008 INGENIEUR

    cours dispensé à Troyes et Reims
    mémoire intermédiaire passé au CNAM Paris
  • CNAM

    Troyes / Reims 1996 - 1999 premier cycle CNAM « économie et gestion »

  • Lycée Les Lombards

    Troyes 1990 - 1992 BTS MAINTENANCE
  • Lycée Les Lombards

    Troyes 1988 - 1990 BAC PRO MSMA

    « maintenance des systèmes mécaniques automatisés » Pack Office

Réseau

Annuaire des membres :