Menu

Dumont CEDRIC

DUROBY

En résumé

Mes compétences :
Quality Assurance
Project Management
Procurement
Microsoft Windows XP
Microsoft Windows 2000 Professional
Contract administration and management
years management
technical planning
project management experience
optimum coordination
managed tower micro
manage the D-Wall For
contract management
Venomous Snake Handling
Team Management
Subcontractor management
Staff Development and Training
Onshore Oil & Gas
Offshore Oil & Gas
Multidisciplinary team management
Microsoft Windows Vista
Microsoft Project
Microsoft Office
Management of engineering and field teams
MYOB Accounting Software
Design management
Cranes
Cost Analysis
Client Liaison
Adobe Photoshop
Adobe Acrobat

Entreprises

  • keller grundbau gbmh - Project director

    2016 - 2019
  • VSL Australia - Project Manager

    2014 - 2015
  • Ground Core Pty Ltd Construction Consultancy - Director

    2014 - 2016 Capitalising on a robust network of industry contacts and a reputation for excellence in project
    management, within this start-up company I provide consultancy services to blue chip clients.

    Recent Clients
    * Menard Bachy: Project Consultant for dynamic compaction project at the Western Boral land field allowing
    for ground improvement of new leachate pound
    * PCA: Project Consultant for PCA on its micro pile/road stabilisation project at Wilsons Creek Road,
    Mullumbimby NSW
  • Ground Core Pty Ltd - Director/owner

    2014 - 2016
  • Australia (PCA) - Construction Manager Piling and Civil

    2013 - 2014 Employed on a full-time contract based on reputation, within this position I played an integral role in bedding
    down robust systems for project financial reporting, quality assurance (QA) reporting and contract
    management, and upgrading the information management system (IMS). In addition I project managed a
    number of concurrently running projects, as well as performing site engineering, site supervision,
    contraction management and resource management functions.

    Key Projects
    * ARK Construction Beechmont Road Slope stability of ground failure using soil nailing technics, ropeaccess assisted
    * McIlwaine Civil Western Creek Backlow Structure Milton Micro pile foundation of back flow structure
    using excavator-mounted piling rig
    * John Holland Proserpine Electric Line Micro pile foundation of 26 high voltage line towers
  • Piling and concreting Australia (PCA) - Construction Manager

    2013 - 2014
  • Menard Bachy - Senior Project Manager

    2008 - 2013 Initially employed as a Project Engineer on the AUD$45M Surfers Paradise Hilton Towers Dolphin Arcade
    development, / was promoted to the role of Assistant Project Manager, and subsequent to project
    completion offered the role of Senior Project Manager. Within this role I was accountable for end-to-end
    management of major on-shore and off-shore projects for blue chip clients, valued up to AUD$35M,
    reporting to the Regional Manager and Managing Director.

    Accountabilities
    * Management of projects through phases of initiation, planning, execution and closure
    * Scoping of works, including identification of client needs and information gathering, and change
    management of adaptations to scope as required
    * Planning and scheduling of works ;
    * Financial and technical planning, and budget control and reporting
    * Oversight of achievement of all quality and HSE requirements by project engineers, suppliers, consultants
    and subcontractors
    * Compliance with legislation, company policy and contractual requirements
    * Design management, including development of concept and documents issued for construction and design
    reports

    Employment History (cont.) RESUME 3

    Senior Project Manager
    Menard Bachy (subsidiary of Soletanche-Bachy), QLD Australia: continued

    Accountabilities
    * Communication of project management documentation to ensure implementation of appropriate processes
    and procedures, and achievement of key deliverables
    * Contract administration and management of variances ;
    * Management of engineering and field teams to ensure optimum coordination and production
    * Provision of key touch point for clients and a conduit for communication between all services of the company
    * Procurement of all products and services, including analysis, evaluation and homogenous comparison of
    tenders
    * Contractor and subcontractor recruitment and performance management across all disciplines
    * Management of the training register with a focus on upskilling the workforce through completion of
    Certificate IV qualifications

    Key Projects
    * ICHTHYS LNG Dynamic Replacement (DR) and Stone Column (vibro): Ground improvement of 350,000
    m2 (14,000 pillars) with 4 DR cranes and 25,000 m2 (5,000 columns) of vibro work offshore with onshore
    cranage - 12 months AUD$35M
    * BMD/Seymour White Port Connect Motorway JV: Ground improvement of 3 bridge abutment with floating
    control modulus columns (CMC), 50,500 Lm (5,000 Columns) with 3 piling rig - 4 months AUD$5M
    * Baulderstone Brisbane Container Terminal: Ground improvement of compacted sand for supporting rails
    for container crane with CMC, 93,000Lm (5,100 Columns) with 5 piling rig, including testing and predrilling -
    3 months AUD$6M
    * Bulk Water Alliance Cotter Dam Canberra Enlargement: Foundation injection using gin grouting
    technology. 6,000 Lm of percussion drilling, 560 Lm of grouting and 600T injected with computer controlled
    pumps - 4 months AUD$8M
    * John Holland Tunnelling Port Melbourne D-Wall Shaft: Construction of three D-Wall shafts for new
    Melbourne main sewer, including construction of 1,650 m2 of D-Wall at an average depth of 25m in a tight
    area - 3 months AUD$6M
    * Thiess-John Holland Joint Venture Air Link Brisbane D-Wall: Construction of 2 D-Walls to create access
    ramp for new Brisbane airport link tunnel, including creation of 4,000 m2 of D-wall at an average depth of
    20m - 2 months AUD$6M
    * Port of Brisbane Corporation Vacuum Consolidation: Vacuum set up of 95000 m2, including realisation
    of 18,706 m2 of slurry wall, installation of 1,967,111 Lm of wick drains, and set up of 95,000 m2 vacuum
    installation - 10 months AUD$24M
    * Rapcivic Surfers Paradise Hilton Towers Dolphin Arcade Development D-Wall/Barrettes: Project
    Engineer/Assistant Project Manager in charge of time, cost and quality control of 60 D-Wall panels and 100+
    barrettes at an average depth of 43m designed as foundations for six levels of basement under two major
    towers - 7 months AUD$45M
  • Menard Bachy - Project Manager

    2008 - 2013
  • Soletanche-Bachy - Project Manager & Business Engineer

    Rueil-Malmaison 2000 - 2005 Reporting to the Managing Director, within this role I project managed tower micro piling projects across
    France and Europe for `Electricitee de France, managing an annual budget of EU EUR 15M. This included the
    employment of specialised technologies including drilled micro piles and driven piles linked with an in-situ
    reinforced concrete base to support the specific pylon. I also had strong input towards the ISO 9001 quality
    certification, while assisting the QA manager in the upgrade and creation of their quality management
    system to a simplified computerised system usable at all levels of the business.
  • MCCF - Soletanche Bachy - Chare D'affaire

    2000 - 2005
  • Eiffage - Site Engineer

    Vélizy-Villacoublay 1999 - 2000

Formations

  • Griffith University (Gold Coast Mc)

    Gold Coast Mc 2007 - 2007 Master of Construction Engineering and Management
  • Griffith University (Brisbane / Goldcoast)

    Brisbane / Goldcoast 2006 - 2006 Graduate Diploma In environmental engineering
  • Ecole Superieur D'Economie Et Techiques De Construction ECOTEC (Cergy Pontoise)

    Cergy Pontoise 2000 - 2003 economie du batiment

    batiment
  • Ecole Spéciale Des Travaux Publics ESTP

    Paris 1997 - 1999 Conducteur de travaux bâtiment

Réseau

Annuaire des membres :