Subsea 7
- Vessel Support Team for Seven Borealis - Senior Installation Engineer on Deep Water Project
SURESNES
2012 - maintenant
In charge of Engineering of SCR (Steel Catenary Risers) Installation scope in 1200m Water Depth: Initiation on SHO, Normal J-Lay, SCR Transfer to FPSO, Pulling from FPSO.
Trip on Seven Borealis (in Angola) for Pipelaying in J-Lay and FLET & ILT Installation.
-
Subsea 7
- Vessel Support Team for Seven Polaris - Pipeline Installation Engineer on Tender
SURESNES
2012 - 2012
Realisation of Tender technical documentation relative to Seven Polaris scope of work:
Time Estimate / Equipment List / Engineering Manhours / Installation Flowcharts / Requisitions / Scope of Works / Transportation Plan / Technical Qualifications
-
Subsea 7
- Project Engineer - Pipeline Installation
SURESNES
2010 - 2012
- Procedures & Requisitions for Pipeline activities (Pipelaying / Above Water Tie-In / Line Recoveries & Flange Installation / Crossing Preparation...)
- Material Follow-up
- Long time spent Offshore (in Nigeria) on this project, on four different Vessels
- Barges / Vessels mobilisation & demobilisation in Project logistic base (Snake Island, Nigeria)
-
Subsea 7
- Design & Installation Engineer on Tenders
SURESNES
2009 - 2010
Realisation of Time Estimates / Equipment Lists / Engineering Manhours / Installation Flowcharts / System Descriptions / Requisitions / Scope of Works / Cargo Barge Rotation Plans / Technical Qualifications
-
Subsea 7
- Pipeline Design Engineer
SURESNES
2008 - 2009
Realisation of various analysis: Pipe Walking & Lateral Buckling by Finite Element Analysis, Lateral Buckling screening, Freespanning, Expansion, Requisitions, Maximum Pipe Stacking Height, 3D Spool Design by Finite Element Analysis