En résumé

Business Manager System Integrations - & Project Leader: en AVL IBERICA

Entreprises

  • AVL Espagne - Project Manager Jaguar Project (UK).

    2014 - maintenant Upgrade of 21 Engine Test cells:
    • Fluids Modules (Coolant-Oil-Intercooler: -10ºc /+150ºc accuracy +/-0,4ºC
    • Ventilation Units
    • Combustion Air with pressure simulation (+/-100 mbars)
    • News Facility for the TC
    o 2.8 MW de chiller water at 2ºC
    o 700 KW LT temperature chiller a -25ºC
    o 2 News transformer
  • AVL Espagne - PROJET MANAGER

    2014 - maintenant JAGUARD WHITLEY Upgrade of 21 Engines Test Cell s and news Facilities 12ME

    New Chiller plant :
    * Chiller Water production 2/7ºC 2,4 Mw
    * Chiller water production -25ºC 700 Kw
    * News Transformers 2500 Kva

    News facilities for 21 test cell s :
    * Ventilation Unit 30 000 M3/h ;
    * Combustion Air Unit with altitude Simulation ;
    * Engines Fluids Controls with a lower control accuracy to 0.4ºC and quick response time
  • AVL Espagne - Project Manager turnkey: Chassis Dynos 4 x 4 Renault Aubevoye :

    2012 - 2013 • Chassis Dynos :4 x 4 de 62”- 0/270 Km/h
    • Wind simulation:0/220Km/h- homogeneity < 5%
    • Température: 5 à 45ºC with Humidity control
  • AVL Spain - BUSINESS MANAGER

    2011 - 2014 Development Internal solution for AVL Ib and sales support in other affiliates of the AVL Group:

    * AVL FRANCE: (RENAULT; CONTINENTAL; TOYOTA )
    * AVL UK : (JLR)
    * AVL ROMANIA (DACIA)
    * AVL RUSSIA (AUTOVAZ)
    * AVL GRAZ..
  • AVL Espagne - 2011-2012: Project Manager Turnkey Engine

    2011 - 2012 Business Manager System Integrations: Main references
    Sales manager for internal products and for big turnkey project in support of other AVL affiliates
    AVL France – AVL UK – AVL Graz- AVL Inde - AVL Chine -
  • AVL IB - PROJECT MANAGER

    2008 - 2011 Project Turnkey to Renault France new Building in the TC in Lardy/France. < 30 MEuro

    * Design, manufacturing and Installation of 10 Engines Test Cell s for mechanics reliability. ;
    * Design, manufacturing and Installation of 8 Transient Test Cell s for Calibration ;
    * Design, manufacturing and Installation of 4 news Engine Test Cell s concept (Patent)
    Climatic Wind Tunnel
    * Design, manufacturing and Installation of one powertrain Test Cell s concept (Patent)
    Climatic Wind Tunnel.
  • AVL Espagne - Project manager Turkey project Renault PIM Lardy. > 25ME.

    2008 - 2011 Completion of 22 Engines test cell´s,
    so 5 with wind tunnel simulation in climatic environment in 25
    months with an increase in the margin and order Intake
  • AVL - Key Account manager

    2006 - 2008 * Volvo- Siemens Automotives - Magnetti Marelli - Bosch-Delphi-Total ;
    * Sales Engineer for Projects Integration o TurKey: ( Renault PIM 25ME;Renault NVH
    25ME;Renault Romania News TC 25ME,CRITT news TC for Turbochargers Testing
    8ME;Peugeot ...
  • AVL France - Key Account Manager

    Croissy-sur-Seine 2006 - 2008 Key account manager for the Oems and others customer: Volvo ; Siemens, Magnetti-Marelli,
    Bosch, Delphi, Total, CRitt M2A, Peugeot
  • AVL France - Key Account Manager

    Croissy-sur-Seine 2001 - 2005 Key account manager for Renault, and support at the AVL affiliates in Spain for the Renault project
    in Spain and Brazil
  • AVL - Key Account manager

    2001 - 2006
  • AVL FRANCE

    Croissy-sur-Seine 2000 - 2008
  • VINCI ENERGIE ( ACTEMIUM) - KEY ACCOUNT MANAGER

    1996 - 2001
  • Renault - Key Account manager

    Boulogne-Billancourt 1996 - 2001 Project Manager Project Turnkey Project 12 Engine Test Cell s for Certification 12ME
    DAXTRA MERGED
  • Actemium France - Key Account Manager

    Montesson 1996 - 2001
  • Clemessy - Project Manager

    Mulhouse 1991 - 1996
  • CLEMESSY - Projet Manager

    Mulhouse 1991 - 1996 Project Manager for Turnkey Project: IFP,TOTAL,RENAULT
  • RENAULT - Maintenance Team Leader

    Boulogne-Billancourt 1986 - 1991 Team Leader at 20 People working in two Shift.
  • Renault - Maintenance Team Leader

    Boulogne-Billancourt 1986 - 1991 Supervision of teams specialized in maintenance on ways of testing Lardy and support at the
    project manager for the realization of new test facilities
  • MILITARY Coopération - Training Team leader

    1984 - 1986 Training young Mexican Engineers and Support on the Engine Test cells and preparation of prototype
    cars
  • Renault - Cooperation Militaire - pour Renault Mexique

    Boulogne-Billancourt 1984 - 1986 Training young Mexican Engineers and Support on the Engine Test cells and preparation of
    prototype car´s.