Menu

Fahmi LOGHMARI

PARIS

En résumé

Willing to pursue and further develop an international career in Oil and Gas.

Mes compétences :
Chimie
Energie
Pétrochimie
Traitement des eaux
Heat Exchanger
Procurement
HYSYS
site experience
contract negotiations
conformance management
SAP
Quality Assurance
Purchase Orders
Project Management
Natural Gas
Instrument Design
Gambit
Develop a pilot
Conducting risk analysis
Autoclaves
Autocad

Entreprises

  • Fjords Processing - Package Manager

    2014 - maintenant (France - Paris
    &
    Australia - Perth)

    Context:
    Fjords Processing - (Global provider of products and system integration for oil & gas, with 265 Mln$ revenue and 600 worldwide employees - www.fjordsprocessing.com
    - Fontenay Sous Bois - Paris - France)
    Projects: Wheatstone project: 2 TEG and 1 MEG for DSME/Chevron - Moho Nord Project (1 TEG for HHI/ TOTAL), Zubeir Project (1 Desalter for ENI), Kaombo (4 Desaletr for TOTAL), Johan Sverdrup (1 TEG for STATOIL), GC-29 (3 Separators for PETROFAC)

    Realisation :

    * Reporting to Operations Director EMEA, leading a team of 18 engineers (project engineering, procurement, H&S & quality, manufacturing control), and controlling a fabricator with 80 working Employees.
    * Completed contract negotiations for subcontractors and suppliers, collaborating with Legal affairs, and coordinating all the operations on products compliance, delivery of materials and change orders.
    * Compliance with project management process and systems according to company standards, interfacing with Finance (for cost control) and Planning (for schedule).
    * Projects reporting (risk and opportunities, cost control, schedule) to headquarters in Norway.
    * Assist site manager on site (S. Korea and Spain) and ensure coordination between site and home office
    * Follow-up of fabrication activities / Ensure coordination with inspection
    * Follow up progress of fabrication and report to management.
    * Ensure that HSE and Quality standards are applied. ;
    * Liaise with QA/QC department for non-conformance management if any. ;
  • Aker Process Solution - Project Engineer

    2012 - 2014 France - Paris &
    S. Korea - Goeje & Ulsan)

    Context:
    Aker Solutions - (Global provider of products and system integration for oil & gas, with 43 Bln$
    revenue and 28.000 worldwide employees - www.akersolutions.com - Fontenay Sous Bois - Paris - France)
    Projects:
    • 1 module of MEG and 2 modules of TEG Regeneration for Wheatstone Upstream Platform (Chevron Australia Pty Ltd), based at DSME Okpo yard, South Korea.
    • 1 module of TEG Regeneration for MOHO NORD Project (TOTAL France), based at HHI ULSAN yard, South Korea)

    Realisation :

    - Technical focal-point of contract for the client and supplier:
    - Coordinate all technical aspects to ensure completion of work within project mandate (Quality, cost, delay, HSE)
    - Coordinate the technical discipline within project team.
    - Oversaw all aspect of the project, with respect to Engineering, Procurement and Contract Coordination with Project Manager direction.
    - Coordination of preparation of requisitions and other specifications to purchase equipment and evaluation of technical offers from vendors and prepare the Technical Bid - Evaluation, expediting and tracking shipments.
    - Attended Kick off Meetings, Pre-Inspection Meetings, and Final Acceptance Tests.
    - Assisted to the construction phase for skids (POSCO - ULSAN - S. KOREA); Pressure Vessels (ALPEC - POHANG- S. Korea).
    - Assisted to the construction phase in DSME ship yard (OKPO - S. KOREA).
    - Conducted Construction progress meeting with staff, manufacturers/contractors and client
    - Participate in Lessons Learned
    - Identify Risks and Opportunities.
  • Aker Process Solution - Process Engineer

    2011 - 2012 Context:
    Glycol Gas Dehydration units (TEG) designed to purify natural gas in order to meet high dew point depression requirements (projects name: LAGAN, WHEATSTONE,).
    MEG regeneration unit (Wheatstone project).
    Desalter (LA SAMIR);

    Realisation :

    PROJETS CLIENTS :
    * Process : Design & datasheets
    * P&ID Modification & Development,
    * Heat and Material Balance (HYSYS), ;
    * Process Equipment Design and calculation note :
    * Pumps
    * Heat exchangers: HTFS / HTRI
    * Distillation column
    * Line sizing ;
    * Instrument Design: implementation, review and checking:
    * Pressure control valve
    * Pressure safety valve
    * Line sizing
    * Data Sheets Development, ;
  • STERICHEM TBM - Process Engineer

    2010 - 2011 Context : Construction and manufacturing of steam autoclaves type GMP, LCD, LCD +, designed for pharmaceutical and bio-technology laboratories, and health care facilities, and Ethylene Oxide sterilizers for sterilization of medical devices in industrial context

    Realisation :
    * Project management:
    * Planning tasks ;
    * Ensure technical performance adapted to specific customer needs

    * Process : Design & datasheets ;
    * Participation in the responses to Tenders ;
    * Creation and validation of PID (steam sterilizers and ethylene oxide)
    * Development of process diagrams with material balances and heat
    * Design, implementation of datasheets, calculation note for different equipment and instruments

    * FAT : Developing strategies for validation of sterilizers ;
    * Written in collaboration with the actors plans for validation and qualification IQ, OQ, FAT ;
    * Participation in the validation tests ;
    * Ensure the qualification / validation according to defined plans Validation ;
    * Approval of documents (protocols, reports,....)

    * Conducting risk analysis and failure ;
    * Identification of possible failure modes for each device ;
    * Implementation of corrective actions

    * R&D ;
    * Develop a pilot for a new heat sterilization process integrated with our steam sterilizers.
    * Develop new methods for treating gas with low energy consumption

  • F.B Engineering SRL - Process Engineer

    2009 - 2010 Context : Design and construction of a plant for the production of detergent powder
    * Process :
    * update, modification and validation and of PFD and P&IDs ;
    * Design ;
    * Determination of dimensions of the reactors (based on the pressure, the amount of injected reagents and the desired performance) ;
    * Determination of dimensions of the atomizer (depending on the humidity at the exit and the flow of hot air) ;
    * heat exchangers (plate)
    * Heat and Mass balance H&MB

    * Equipment:
    * Technical specification & data sheets ;
    * Spray, heat exchangers, condensers, pumps, pressure gauges, temperature transmitters, pipes, reactors, Cooling ;
    * Evaluation and validation of technical propositions of suppliers in cooperation with the purchasing department ;
    * Follow suppliers (Italy, France, Morocco) ;
  • FAST - DOCTORANT

    2005 - 2008 Ingénieur Doctorant

    Contexte du projet : Ce projet est réalisé en collaboration avec le Laboratoire Thermocinétique de Nantes et le Laboratoire de Transferts Écoulements Fluides Énergétique de Bordeaux. La mission était de déterminer les paramètres dynamiques et thermiques lors de la formation des revêtements métalliques par projection des gouttes individuelles fondues sur un substrat solide plat (Application à la projection thermique).

Formations

  • Ecole Nationale Supérieure Des Techniques Avancées (Paris)

    Paris 2003 - 2004 Génie des Procédés

    DEA en Génie des Procédés

Réseau

Annuaire des membres :