OIL PLANTS HOOK UP AND SHUTDOWN MANAGEMENT

OIL ¨PLANT CONSTRUCTION AND REVAMPING MANAGEMENT
-
ONSHORE/OFFSHORE MAINTENANCE CONTRAT & ORGANISATION AND FOLLOW UP MANAGEMENT

Entreprises

  • Technip - Directeur de chantier

    Paris 2013 - 2015 Directeur de chantier - Remplacement Steam Boilers Pétroineos - Lavera France
  • Technip - Project Manger

    Paris 2011 - maintenant INEOS - refinery France
    TECHNIP
    From Mars 2011 to September 2012
    Project Manager
    Studies and Replacement of Three old reactors on an oil hydrocrack ( HCK) by two 410 Ton new units.
    Including all facilities like: harbour revamping, transportation on multi wheels, heavy lifting (700 ton crane), three structures construction building, old concrete block adaptation to the new units.
    Piping and mechanic installation, instrumentation set up, electrical connection.
    Safety Follow up, scaffold erection, approval, including all safety requirements like induction meeting for new comers, tool box meeting before new job, medevac check up
    Safety and procedure studies, before job, further INEOS procedure.
    Painting, pre-commissioning commissioning and units start up
    Units area clean up and environmental rehabilitation.
  • Total Angola (contracté par Mercury Consulting ) - New job offshore project team leader (DT-ITV-PJT/Offshore & Onshore)

    2006 - 2009 TOTAL ANGOLA
    Mercury Consulting
    From December 2006 to June 2009

    From January 2008 to June 2009
    New job offshore project team leader (DT-ITV-PJT/Offshore)
    FPSO Dalia Angola
    New construction department organisation Studies with TOTAL team
    From December 2006 to January 2008
    Identical job than before but limited to the DALIA FPSO after new organisation implementation
    New job offshore project team leader (DT-ITV-PJT/Offshore & Onshore)
    Implementation on Block 3 – FPSO Girassol & FPSO Dalia Angola

    In charge of studies and realisations of the construction new jobs on FPSO and production platforms
    Spare parts procurement for new jobs in contact with TOTAL department
    Spare part minimum stock listing to the maintenance store
    Contractor job follow up including: electrical, instrumentation, piping, beam structure, painting, metallic forming.
    Safety studies before & during the construction and Safety follow-up during the project realisation.
    End of commissioning Follow up, bunch list follow up and clearance.
    In charge of the block 3 transfers to SONANGOL.
    ITV- PJT, reorganisation study.

    TECHNIP FRANCE

    INNOVENE / INEOS - refinery France
    TECHNIP
    From June 2005 to July 2006
    Construction Superintendent
    New jet fuel treatment unit construction Supervision, commissioning, and Start up