#Since March 2015: Installation Engineering Manager - TECHNIP Brasil - Client: PETROBRAS.
In charge of Engineering Coordination for four (4) PLSV (650t and 300t) for the Pre-Operational Department.
Expatriation: Rio de Janeiro - BRASIL
# Projet GIRRI SURF2 (2013/15) - TECHNIP Angola - Client: TEPA
Hook Up Manager: (2014/15): Offshore onboard Girassol & Dalia FPSOs to co ordianate the contruction phase
Lead Installation Engineer Senior (2013/14): FPSO mobilisation, I-tube installation to producing platform, Stucture installation, eng. co ordination with Client for installation and structure Dpt.
Expatriation: Luanda, ANGOLA
# Projet GIRRI SURF1 (2011/12) - TECHNIP France - Client TEPA
- Installation Engineer: Umbilicals production / water injection / infields with hook up to FPSO
- Method Statement / Detailed Engineering / Installation
Offshore onboard Deep Pioneer MCV.
Paris - FRANCE
# PAZFLOR project (end 2008/11)- TECHNIP France - Client TEPA
OPERATIONS: Nov 2010 - Mai 2011
Mobilizations @ Flexi-France (Le Trait) Mobile (USA) et Luanda/Dande (Angola)
Offshore:
- IPBs & Flextails transpooling (with HLVs)
- PIP spooling and installation (with Deep Blue)
- Single wall pipe installtion & PLETs (with Deep Blue)
- Flexible (Riser + Flowline) Installation (with Deep Pioneer)
- Pazflor Hook up to FPSO (onboard PAZFLOR FPSO)
Paris - FRANCE
2007 - End 2008: SAIPEM SA
METHODES DE CONSTRUCTION for OFFSHORE:
Missions Onshore: Congo (Pointe Noire) - Dubai - Coree du sud - Rotterdam
Mes compétences :
AutoCAD