ITER
- Mecanical Package Manager
2017 - maintenant
-
NOC (North oil Company) QATAR
- Head Shutdown and Campaign
2016 - maintenant
Multicultural Management
Shadowing MOQ Lead SD and Campaign
Write shadowing reports
Write the exhibit for future contracts
Write the job description for each position
Prepare the budget (opex, capex)
Prepare and manage the steering committee
Do the interviews to select new staff for the transition period
Make all requests for IT equipment
Followed the preparation of scope of work SD and Campaign
Followed preparation material
Weekly meeting for preparation SD and Campaign with MOM
Audit the different contractors
Followed the planning for SD and Campaign
Survey offshore to collect all information’s for SD/Campaign
-
Veolia Water SAOUDI ARABIA
- Site Project Manager
2016 - 2016
Multicultural Management
Followed a punch list
Material order
Solving technical problems
Followed the spare part and spare part list
Followed and check material
Followed material arrival
Site training personnel
Followed prefabrication and installation of GRP and stainless steel piping
Followed a punch list
Followed of the problems of instrumentation material
Followed of the as built drawings
Daily progress report
Weekly site meeting with MOM
-
Vale NEW CALEDONIA
- Construction Lead
2015 - 2016
Multicultural Management
Followed material arrival
Followed and check material.
Followed the civil construction (support)
Audit and follow up contractors.
Followed prefabrication piping HDPE, C.S and QA/QC Doc.
Followed prefabrication support
Followed daily and weekly progress
Followed Weekly meeting
Daily and weekly progress report
Followed planning with due respect.
Followed as built drawing
Pre site visit and meeting with contractors.
Followed document Control.
Followed of tool box and safety meetings.
Followed and check equipment.
Followed commissioning and Hydraulic test.
Work Permit Preparation and follow up.
Preparation and Organization of QAQC inspections after welding.
Preparation and Organization of HSSE during Construction.
-
Total NIGERIA
- Head of Construction Coordinator / Project Shutdown Coordinator
COURBEVOIE
2014 - 2015
Multicultural Management
Followed and check equipment.
Followed prefabrication piping
Followed prefabrication structure
Followed daily and weekly progress
Followed Weekly meeting
Daily and weekly progress report
Followed material arrival
Followed planning with due respect.
Audit and follow up contractors, for shutdown preparation.
Pre site visit and meeting with contractors.
Followed document Control.
Prepared and follow the green book
Manage and Coordinated offshore shutdown
Organization of safety meetings.
Followed and check equipment.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Followed ICAPS document multidisciplinary.
Meetings Organization for shutdown preparation progress.
Shutdown administration organization.
Work Permit Preparation and follow up.
Daily report.
Progress daily meeting.
Preparation and Organization of QAQC inspections after welding.
Preparation and Organization of HSSE during shutdown.
Prepares the close-out report after shutdown.
-
Total NIGERIA
- Shutdown Coordinator
COURBEVOIE
2013 - 2014
Prepares and Coordinated the Shutdown on the platform off and onshore OML 99 and OML 58
Management multicultural
Auditing and followed contractors, for the preparation of shutdown.
Pre site visit and meeting with contractors.
Followed the document Control.
Management and Coordination shutdown offshore and onshore.
Organization of safety meetings.
Followed and control equipment.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Followed ICAPS document multidisciplinary.
Followed Logistics of the accommodation barge (hospital, doctor, food, accommodation, administrator, etc.) offshore part.
Organization of logistics in platform in kitchens during the shutdown (time, food, etc.).
Followed a list of staff and their qualifications (sas Huet, License welding, etc.).
Organization of meetings for the advance preparation of shutdown.
Organization of the administration for the shutdown.
Preparation and followed of work permit.
Progress meeting on site.
Preparation and Organization of inspections after welding, QA/QC.
Preparation and Organization of hygiene and safety during shutdown (HSSE).
-
TN International (AREVA) NIGER
- Deputy Site Director
2012 - 2013
Management multicultural
Management and Coordination of construction
Followed planning with due respect.
Construction meeting
Weekly report with the project director
Monthly report
Followed HSE
Followed QA/QC
Followed construction, civil work, piping, electrical, mechanical, equipment’s, material
Followed pre com and commissioning
Followed field engineering
Followed PCM (planning, progress curve, cost, administration, material)
Followed mobilisation plan
Followed the contract with the contract manager
-
Vale NEW CALEDONIA
- Shutdown and Maintenance Lead
Rio de Janeiro
2011 - 2012
Management Multicultural
Document Control.
Auditing and followed of contractors, for preparation shutdown and curative maintenance.
Create and following the work packs (for reducing cost).
Pre site visit and meeting with contractors.
Implementation and following the JSA (Job Safety Analysis) before work permit
Organize the maintenance preventive and curative.
Preparation and Organization of hygiene and safety role during all intervention (HSSE)
Preparation and following work permit.
Preparation and Organization of QA/QC inspections.
Followed planning with due respect.
-
TOTAL NIGERIA
- SHUTDOWN MANAGER
COURBEVOIE
2010 - 2010
Function: Shutdown Manager Oil & Gas
Context: Prepares and Manage the Shutdown of the platform OML 99
Management multicultural (TOTAL staff and contractors)
Followed and auditing of contractors, for the preparation of shutdown.
Pre site visit and meeting with contractors.
Document control.
Management and coordination shutdown.
Organization of safety on site
Followed and control equipment, material and tools.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Manage the logistics in platform and the accommodation barge (hospital, doctor, catering, accommodation, administrator, surfer, etc.).
Followed by a list of staff and their qualifications (sas Huet, License welding, etc..).
Organization of meetings for the advance preparation of shutdown.
Organization of the administration for the shutdown.
Preparation and followed the work permit.
Meeting on site for the planning respect.
Manage and organize the inspections after welding heath treatment and QA/QC.
Manage and Organization hygiene and safety during shutdown HSSE.
Reporting
-
SUNGDONG KOREA
- Construction Manager
2010 - 2010
Management multicultural (8 supervisor, 6 subcontractor)
Followed personnel and subcontractor
Quality audits subcontractor
Managed assembly (piping, welding, insulation)
Implementation of HSSE
Followed and compliance with the lifting and handling
Compliance with international standards of construction gas
Management QA/QC
Followed planning
Followed and respect for the delay of manufacturing and delivery
Followed budget
Cost control
-
GRTGAZ
- Site Superintendent
Bois-Colombes
2009 - 2009
Management of staff and subcontractors (5 supervisors, 4 subcontractor)
Followed by the construction Multidisciplinary
Quality Audit
Inspection and followed by the material (equipment) and by the construction
Control quality and quantity of equipment
Management of the location of graves of regulations, recoveries of water, valves and technical buildings in XYZ
Supervision and inspection of concrete, HP, drying pipe with final report and Cathodic protection
Respect for the safety standards of the means of lifting and the implementation of the piping’s
Followed by planning with the client
Followed earthwork
Followed by the civil work according to the standards BAEL 91 and eurocod
Followed ICAPS multidisciplinary
File of acceptance and reception civil work
File of acceptance and reception of the piping’s and the envelope before put in the ground
Respect for the standards gas
Followed equipment and control equipment
Followed by pre-assembly and assembly of piping, welding
Followed safety rules for working in ATEX zone
Application of the standards of hygiene and safety
-
ALSTOM POWER HYDRO SOUDAN
- Manager BOP Mechanical
Levallois-Perret Cedex
2008 - 2009
Multicultural Management (10 supervisors)
Control cost
Checking equipment and plans for progress
Planning of the works following progress with customer
Definition of resources required for the project
Management of personal and subcontractor
Control of isometric
Followed QA / QC and reception with the client
Followed by non-destructive testing and penetrate test
Followed pre manufacture (mechanical, piping, HVAC)
Reception and control of the material
Followed by stocks
Followed by assembly
Modifying and updating isometrics
Followed supply equipment
Followed and respect for the lifting and the handling
Respect for the standards of hygiene’s and safety
Respect for the standards builder
-
SIEMENS VAI TURKEY, CHINA, BELGIUM
- Site Manager
Savigneux
2006 - 2008
Multicultural Management (5 managers, 10 supervisors)
Followed by the construction Multidisciplinary
Control cost
Definition of resources required for the project
Management of personal and subcontractor
Planning of the works following progress with customer
Followed machining
Followed by prefabrication (mechanics, piping)
Followed by assembly
Reception and control of the material
Followed and respect for the lifting and the handling
Followed by the supplies material
Followed by the final assembly (mechanics, piping, electric, automatism)
Followed by the commissioning and rise progressive in step
Respect hygiene’s et security
Final reception of rolling mills
-
CRYOSTAR KOREA, JAPAN, MALAYSIA, SPAIN
- Manager
HESINGUE
2002 - 2006
Multicultural Management (7 supervisors)
Planning with the customer following progress
Management the assembly of the piping’s on compressors
Followed by cryogenic regulation of valves, PT, pressostats, PT 100, compressors (piping, mechanical, electric and programming)
Loop test
Respect for the standards gas
Followed safety rules for working in ATEX zone
Final inspection and acceptance with the customer
Running test and surge test
Reporting
Gas trial (Offshore)