Hocine SADI

Paris

En résumé

Career Summary / Objective:

Familiar with all execution phases of EPC Projects as Mechanical Engineer. Performing the activities of verification and preparing of procedures for assembling of static and rotating equipment, follow-up the construction phase by providing technical clarifications requested by the Client and proposing solutions to problems faced by the construction team.

Coordinate with engineering department and equipment suppliers to schedule deliveries and corrective actions to be adopted.

Ensure activities related to equipment during the Pre-commissioning / commissioning phases by checking test procedures, tests execution, start-up and punch lists cleaning out.

Involved in shutdowns of Plants for corrective maintenance and/or revamping purpose.

Mes compétences :
Design : PDS, Autocad, Solid Works
Microsoft Office: Word, Excel, Power Point

Entreprises

  • Technip - Mechanical Equipment Shutdown Preparation Leader

    Paris 2013 - maintenant Plant: Algiers Refinery Rehabilitation and Adaptation, Algiers, Algeria.

    Main-Tasks:

    - Participate to the list of pre-shut-down, shut-down and post shut-down activities
    - Ensure that all the basic engineering details such as equipment list, Tie-in List, Technical Specifications, PID,… are attached to Job Cards
    - Coordinate with H.O. Engineering Manager for the engineering documents
    - Ensure the best technical solutions to be adopted to carry out works on live facilities (hot tapping,…)
    - Request and provide necessary clarifications of planned activities with all involved parties, through site surveys, meetings, presentations
    - Validate the construction level 3 schedule established by Job Cards
    - Coordinate with Client for the interfaces foreseen during shutdowns with Client Operation and other parties
    - Participate to the Constructability Program and provide to engineering and commissioning construction inputs in the shut-down design
  • SAIPEM - Package Specialist Engineer

    Montigny-le-Bretonneux 2010 - 2013 Plant: Oil & Gas Plant Hassi Messaoud LPG3 - zcina

    Main Tasks:
    - Mounting of six Furnaces (BIH)
    - Field Engineering and construction Follow-up of static and rotating equipments
    - Issuing of Equipments Site Queries to Vendors
    - Responding to Equipments Site Queries issued by Subcontractors
    - Focal Point for ARH (Autorité de Régulation des Hydrocarbures [FR] = Hydrocarbon Regulatory Authority [Eng] : Algerian ministerial institution) as Pressure Vessels and lines Specialist for Site Acceptance Tests and Hydrotests.
  • Saipem - Equipments Field Engineer

    Montigny-le-Bretonneux 2010 - 2011 Plant: Crude Oil treatment plant BRN ROD, SAIPEM

    Main Mission :
    - Supervise corrective maintenance and start-up of the Fired Heater (BIH) during shutdown of the production process of the plant
  • Saipem - Machineries Field Engineer

    Montigny-le-Bretonneux 2009 - 2010 Plant: Crude Oil treatment plant Hassi Messaoud UTBS,

    Main Missions :
    - Mounting and strat-up of three Furnaces (HEURTEY)
    - Installation and start-up of vertical pumps (FLOWSERVE)
    - Installation, commissioning and certification of over-head cranes (J-BRANSLEY CRANES) and other handling equipments
    - Maintenance of rotating machinery such as centrifugal and volumetric pumps
  • TOEC Contracting & Trading - Studies Engineer

    2008 - 2009 Main Missions : Preparation of technical and commercial tenders (Buildings and Pipeline)

Formations

  • Eni Corporate University (Algiers)

    Algiers 2010 - 2011 Trainings


    Certifications & Achievements:
    2010 : 'Problem Solving & Decision Making' by Eni corporate university - Algiers
    2011 : 'Introduction to Project Management' by Eni corporate university - Algiers
    2011 : 'PDS Equipments and Piping 3D modeling' by INTERGRAPH - Algiers
  • USTHB (Alger)

    Alger 2001 - 2008 Génie Mécanique, Option Thermo Energétique

    Mechanical Energy - Theme sustained for obtaining the degree at Thermo Energy: « Design and Modeling cogeneration systems in the compressor station pipeline ». The study aimed to analyze the process of pre-heat recovery gas turbine exhaust gas station Compression SC2, by implementing a system of optimal Cogeneration Type Combined Cycle Gas - Steam in order to product electricity.

    Diploma acquired
  • Houari Boumediene University Of Sciences And Technology USTHB, Bab Ezzouar (Algiers)

    Algiers 2001 - 2008 Mechanical Engineering Degree

    Mechanical Thermo Energy - Theme sustained for obtaining the degree at Thermo Energy: « Design and Modeling cogeneration systems in the compressor station pipeline ». The study aimed to analyze the process of pre-heat recovery gas turbine exhaust gas station Compression SC2, by implementing a system of optimal Cogeneration Type Combined Cycle Gas - Steam in order to product electricity.

    Diploma a