-
TECHNIP
- Preservation Engineer
Paris
2013 - maintenant
Project : Rehabilitation & Adaptation Project of Algiers Refinery
According to job specification for material preservation during storage, construction, pre-commissioning and
commissioning procedure there are three preservation phases (Initial preservation, Maintenance during
preservation, Restoration) to enter in SMC Material preservation module for each job plan into an integrated
field plan, Easy plant Software.
* identify preservation resource needs at key project phases, develop and submit staffing plans for Project Manager
Approval, and staff the preservation organization.
* operating machinery must be protected from the elements. Painting, plating, sheltering, use of corrosionresistant materials of construction and many other means are available to achieve the desired protection.
* Unpack and check received equipment and accessories against the requisition and packing lists. Ensure
equipment is in good condition and also protected against rusting / deterioration / dust accumulation. Check
equipment for Vendor's storage requirements, which shall include preservation minimum requirements of
storage atmosphere and preservation expiration date as requirement in accordance with API Recommended
Practice 686.
* For nitrogen sealed equipment, periodical checked, fill nitrogen if necessary to maintain suitable pressure.
* Vapour seals shall be protected, and any damage repaired immediately, until equipment is serviced for start up.
Spray compressor, and turbine casings and rotors with MIL P-10 or equal when it is opened.
* Purge equipment casings with dry nitrogen and seal them with nitrogen gas by providing a nitrogen blanketing
system as required by Vendor's procedure.
Spray bearings with MIL. P-20 or equal, if recommended by Vendor
Apply shafts, exterior surfaces of couplings and unpainted metal parts with MIL. P-19 or equal.
-
TECHNIP
- Preservation job Plan
Paris
2013 - maintenant
Contract Value: 899 million $
Project : Rehabilitation & Adaptation Project of Algiers Refinery
According to job specification for material preservation during storage, construction, pre-commissioning and commissioning procedure there are three preservation phases (Initial preservation, Maintenance during preservation, Restoration) to enter in SMC Material preservation module for each job plan into an integrated field plan, Easy plant Software.
* identify preservation resource needs at key project phases, develop and submit staffing plans for Project Manager Approval, and staff the preservation organization. ;
* operating machinery must be protected from the elements. Painting, plating, sheltering, use of corrosion-resistant materials of construction and many other means are available to achieve the desired protection. ;
* Unpack and check received equipment and accessories against the requisition and packing lists. Ensure equipment is in good condition and also protected against rusting / deterioration / dust accumulation. Check equipment for Vendor's storage requirements, which shall include preservation minimum requirements of storage atmosphere and preservation expiration date as requirement in accordance with API Recommended Practice 686. ;
* For nitrogen sealed equipment, periodical checked, fill nitrogen if necessary to maintain suitable pressure. ;
* Vapour seals shall be protected, and any damage repaired immediately, until equipment is serviced for start up.
Spray compressor, and turbine casings and rotors with MIL P-10 or equal when it is opened.
* Purge equipment casings with dry nitrogen and seal them with nitrogen gas by providing a nitrogen blanketing system as required by Vendor's procedure.
Spray bearings with MIL. P-20 or equal, if recommended by Vendor
Apply shafts, exterior surfaces of couplings and unpainted metal parts with MIL. P-19 or equal.
-
SAIPEM
- Senior QC material
Montigny-le-Bretonneux
2010 - 2013
Position : Senior Quality Material
Contract Value: 5 milliard Euro
Project : LNG 4.7 Million Ton /year
As part of QA/QC department team assigned to warehouse Construction Site main responsibilities include to:
* Ensures compliance to project quality requirement for procured material at receiving warehouse site. ;
* Reviewing Material Test Certificates, EN 10204 3.1 3.2, Inspection Release Certificate referring to ITP / QCP requirement as per applicable code and national regulation ARH, International Codes and Standards: ASTM, ASME/ANSI, API, BS. ;
* Visual Receiving Inspection of all project , Piping, Valves, E & I & Mechanical Materials as per Purchase Order/Packing list/Delivery Note/Shipping Documents. ;
* Maintaining up to date records of Discrepancy Report (DR) & Non Conformance Report (NCR) and implementing of Correcting Action system as per Project Specification & Vendor Requirement. ;
* Involvement in Hydro-Test and Pneumatic Test package preparation & witnessing Pressure &
Pneumatic test prior to release the Test Pack.
* Interface with client's construction supervisors and Subcontractor QC personnel to deal with specific issues. ;
* Liaising with procurement department (Milan & Algeria Offices) to initiate material requisitions, Purchase orders & its follow-up
Accountable for Inspecting and witness examination of material supply.
* Conversant with computerized inventory control system & Materials Management Software (Marian syst.) ;
* Preserving all Materials as per Safety Data Sheet (MSDS) & Quality Management Procedure (QMP).Safe storage, handling, as per vendor / Manufacturer Instruction.
-
SAIPEM-ENI
- Senior QC Material
2010 - 2013
Position : Senior Quality Material
Contract Value: 5 milliard Euro
Project : LNG 4.7 Million Ton /year
As part of QA/QC department team assigned to warehouse Construction Site main responsibilities include to:
* Ensures compliance to project quality requirement for procured material at receiving warehouse site.
* Reviewing Material Test Certificates, EN 10204 3.1 3.2, Inspection Release Certificate referring to ITP / QCP
requirement as per applicable code and national regulation ARH, International Codes and Standards:
ASTM, ASME/ANSI, API, BS.
* Visual Receiving Inspection of all project , Piping, Valves, E & I & Mechanical Materials as per Purchase
Order/Packing list/Delivery Note/Shipping Documents.
* Maintaining up to date records of Discrepancy Report (DR) & Non Conformance Report (NCR) and
implementing of Correcting Action system as per Project Specification & Vendor Requirement.
* Involvement in Hydro-Test and Pneumatic Test package preparation & witnessing Pressure &
Pneumatic test prior to release the Test Pack.
* Interface with client's construction supervisors and Subcontractor QC personnel to deal with specific issues.
* Liaising with procurement department (Milan & Algeria Offices) to initiate material requisitions, Purchase
orders & its follow-up
Accountable for Inspecting and witness examination of material supply.
* Conversant with computerized inventory control system & Materials Management Software (Marian syst.)
* Preserving all Materials as per Safety Data Sheet (MSDS) & Quality Management Procedure (QMP).Safe
storage, handling, as per vendor / Manufacturer Instruction.
-
Saipem
- Engineer QC Material
Montigny-le-Bretonneux
2008 - 2009
Project : 300 M barrels /Day
Contract Value: 2 Milliard Euro
Control the material received in warehouse and specially to be the link between site material manager and QC Controller by checking all the materials and documents ordered during the project.
- At inspection:
- Visual inspection for damages, inspection of the conformity and traceability (included marking) against specifications, certificates and purchased order ;
- Dimensional check of the material might be carried out with the support, if necessary, of relevant specialists. ;
- Implement Engineering technical requirements and to coordinate inspection arrangements and material certification. ;
- Checking of different material technical certificate (type 2.1 to 3.2), Mill certificate, PMI and PQR. ;
- During the inspection, all Heat number shall be reported thoroughly on the MRN.
-
Saipem
- Engineer QC Material
Montigny-le-Bretonneux
2008 - 2010
Project : 300 M barrels /Day
Contract Value: 2 Milliard Euro
Control the material received in warehouse and specially to be the link between site
material manager and QC Controller by checking all the materials and documents ordered
during the project.
- At inspection:
- Visual inspection for damages, inspection of the conformity and traceability (included
marking) against specifications, certificates and purchased order,
- Dimensional check of the material might be carried out with the support, if necessary,
of relevant specialists.
- Implement Engineering technical requirements and to coordinate inspection
arrangements and material certification.
- Checking of different material technical certificate (type 2.1 to 3.2), Mill certificate, PMI
and PQR.
- During the inspection, all Heat number shall be reported thoroughly on the MRN.
-
Saipem
- Engineer quality control material
Montigny-le-Bretonneux
2008 - 2009
Control the material received in warehouse and specially to be the link between the material manager and QC Dept by checking all the material and documents ordred during the project.
at inspection :
-Visual inspection for damages, inspection of the coformity and traceability against specifications, certificates and purchased order,
- dimensional check of the MTL might be carried out with the support, if necessary, of relevant specialists.
-during the quality inspection, all Heat number shall be reported thoroughly on the MRN.
Then, teh RFI should be signed by authorized party, and items from MRR have to be posted by syst. Mariana operator after receipt of signed RFI in copy.
-
Ourhoud Organization
- Codification of material
2004 - 2008
Project : crude oil 234 Mbarils /Day
Coding and standardized the materials ordered by company, more than twenty five
thousand items integrated in the software ``Intermat Struxure'' and managed by D7i Datastrem system.
- Update of data, insertion of the manufacturer/supplier names' and additions of
models/ part numbers and Tag number.
- Preparation of the daily report and discrepancy reports of material to the physical
reception.
- Up-date of the physical inventory file's to each end year.
-
Ourhoud Organization
- Cataloguer Engineer
2004 - 2008
Project : crude oil 234 Mbarils /Day
Coding and standardized the materials ordered by company, more than twenty five thousand items integrated in the software ``Intermat Struxure'' and managed by D7i Data-strem system.
- Update of data, insertion of the manufacturer/supplier names' and additions of models/ part numbers and Tag number. ;
- Preparation of the daily report and discrepancy reports of material to the physical reception. ;
- Up-date of the physical inventory file's to each end year.
-
JGC-INITEC
- Codification of Spart parts 2 years Exploitation
2001 - 2003
Position : Materials & control Codification
Contract Value: 800 milloin $
Project : crude oil 230 Mbarils /Day process plaint
Project involved materials control and codification for oil materials production in Ourhoud-
field, CPH (Center of Production Hydrocarbon), responsibilities included more than nine
thousand items ordered with the JGC-INITEC contractor's.
-
JGC-INITEC
- Cataloguer Engineer
2001 - 2003
Position : Materials & control Codification
Contract Value: 800 milloin $
Project : crude oil 230 Mbarils /Day process plaint
Project involved materials control and codification for oil materials production in Ourhoud-field, CPH (Center of Production Hydrocarbon), responsibilities included more than nine thousand items ordered with the JGC-INITEC contractor's.
Empolyer: PEPSI COLA Alegria ltd.
Position: Maintenance operator machines
-
PEPSICO
- Maintenance operator
2001 - 2001
Maintenance of digital Kroness machine
-
Pepsi cola
- Operator and Maintenance
2000 - 2001
Maintenance of digital Kroness machine