Menu

Kader HEBOUCHE

Paris

En résumé

According to job specification for material preservation during storage, construction, pre-commissioning and commissioning procedure there are three preservation phases (Initial preservation, Maintenance during preservation, Restoration) to enter in SMC Material preservation module for each job plan into an integrated field plan, Easy plant Software.
• identify preservation resource needs at key project phases, develop and submit staffing plans for Project Manager Approval, and staff the preservation organization.
• operating machinery must be protected from the elements. Painting, plating, sheltering, use of corrosion-resistant materials of construction and many other means are available to achieve the desired protection.


Mes compétences :
Quality Control
Quality Assurance
Quality Management
Procurement
Petroleum
logistics management
inventory control
extensive skills and experience
equipment maintenance
Technical assistance
Purchase orders
Preparation of the daily report and discrepancy re
Piping Materials
Materials Management
ISO 900X Standard
Good communications skills
Forecasting
Excellent communications skills
Oil Field
Warehousing
Warehouse Operations
TAS
Supply Chain

Entreprises

  • TECHNIP - Preservation Engineer

    Paris 2013 - maintenant Project : Rehabilitation & Adaptation Project of Algiers Refinery
    According to job specification for material preservation during storage, construction, pre-commissioning and
    commissioning procedure there are three preservation phases (Initial preservation, Maintenance during
    preservation, Restoration) to enter in SMC Material preservation module for each job plan into an integrated
    field plan, Easy plant Software.

    * identify preservation resource needs at key project phases, develop and submit staffing plans for Project Manager
    Approval, and staff the preservation organization.

    * operating machinery must be protected from the elements. Painting, plating, sheltering, use of corrosionresistant materials of construction and many other means are available to achieve the desired protection.

    * Unpack and check received equipment and accessories against the requisition and packing lists. Ensure
    equipment is in good condition and also protected against rusting / deterioration / dust accumulation. Check
    equipment for Vendor's storage requirements, which shall include preservation minimum requirements of
    storage atmosphere and preservation expiration date as requirement in accordance with API Recommended
    Practice 686.

    * For nitrogen sealed equipment, periodical checked, fill nitrogen if necessary to maintain suitable pressure.
    * Vapour seals shall be protected, and any damage repaired immediately, until equipment is serviced for start up.
    Spray compressor, and turbine casings and rotors with MIL P-10 or equal when it is opened.
    * Purge equipment casings with dry nitrogen and seal them with nitrogen gas by providing a nitrogen blanketing
    system as required by Vendor's procedure.

    Spray bearings with MIL. P-20 or equal, if recommended by Vendor
    Apply shafts, exterior surfaces of couplings and unpainted metal parts with MIL. P-19 or equal.
  • TECHNIP - Preservation job Plan

    Paris 2013 - maintenant Contract Value: 899 million $
    Project : Rehabilitation & Adaptation Project of Algiers Refinery
    According to job specification for material preservation during storage, construction, pre-commissioning and commissioning procedure there are three preservation phases (Initial preservation, Maintenance during preservation, Restoration) to enter in SMC Material preservation module for each job plan into an integrated field plan, Easy plant Software.
    * identify preservation resource needs at key project phases, develop and submit staffing plans for Project Manager Approval, and staff the preservation organization. ;
    * operating machinery must be protected from the elements. Painting, plating, sheltering, use of corrosion-resistant materials of construction and many other means are available to achieve the desired protection. ;
    * Unpack and check received equipment and accessories against the requisition and packing lists. Ensure equipment is in good condition and also protected against rusting / deterioration / dust accumulation. Check equipment for Vendor's storage requirements, which shall include preservation minimum requirements of storage atmosphere and preservation expiration date as requirement in accordance with API Recommended Practice 686. ;
    * For nitrogen sealed equipment, periodical checked, fill nitrogen if necessary to maintain suitable pressure. ;
    * Vapour seals shall be protected, and any damage repaired immediately, until equipment is serviced for start up.
    Spray compressor, and turbine casings and rotors with MIL P-10 or equal when it is opened.
    * Purge equipment casings with dry nitrogen and seal them with nitrogen gas by providing a nitrogen blanketing system as required by Vendor's procedure.
    Spray bearings with MIL. P-20 or equal, if recommended by Vendor
    Apply shafts, exterior surfaces of couplings and unpainted metal parts with MIL. P-19 or equal.
  • SAIPEM - Senior QC material

    Montigny-le-Bretonneux 2010 - 2013 Position : Senior Quality Material
    Contract Value: 5 milliard Euro
    Project : LNG 4.7 Million Ton /year
    As part of QA/QC department team assigned to warehouse Construction Site main responsibilities include to:
    * Ensures compliance to project quality requirement for procured material at receiving warehouse site. ;
    * Reviewing Material Test Certificates, EN 10204 3.1 3.2, Inspection Release Certificate referring to ITP / QCP requirement as per applicable code and national regulation ARH, International Codes and Standards: ASTM, ASME/ANSI, API, BS. ;
    * Visual Receiving Inspection of all project , Piping, Valves, E & I & Mechanical Materials as per Purchase Order/Packing list/Delivery Note/Shipping Documents. ;
    * Maintaining up to date records of Discrepancy Report (DR) & Non Conformance Report (NCR) and implementing of Correcting Action system as per Project Specification & Vendor Requirement. ;
    * Involvement in Hydro-Test and Pneumatic Test package preparation & witnessing Pressure &
    Pneumatic test prior to release the Test Pack.
    * Interface with client's construction supervisors and Subcontractor QC personnel to deal with specific issues. ;
    * Liaising with procurement department (Milan & Algeria Offices) to initiate material requisitions, Purchase orders & its follow-up
    Accountable for Inspecting and witness examination of material supply.
    * Conversant with computerized inventory control system & Materials Management Software (Marian syst.) ;
    * Preserving all Materials as per Safety Data Sheet (MSDS) & Quality Management Procedure (QMP).Safe storage, handling, as per vendor / Manufacturer Instruction.
  • SAIPEM-ENI - Senior QC Material

    2010 - 2013 Position : Senior Quality Material
    Contract Value: 5 milliard Euro
    Project : LNG 4.7 Million Ton /year

    As part of QA/QC department team assigned to warehouse Construction Site main responsibilities include to:
    * Ensures compliance to project quality requirement for procured material at receiving warehouse site.
    * Reviewing Material Test Certificates, EN 10204 3.1 3.2, Inspection Release Certificate referring to ITP / QCP
    requirement as per applicable code and national regulation ARH, International Codes and Standards:
    ASTM, ASME/ANSI, API, BS.
    * Visual Receiving Inspection of all project , Piping, Valves, E & I & Mechanical Materials as per Purchase
    Order/Packing list/Delivery Note/Shipping Documents.
    * Maintaining up to date records of Discrepancy Report (DR) & Non Conformance Report (NCR) and
    implementing of Correcting Action system as per Project Specification & Vendor Requirement.
    * Involvement in Hydro-Test and Pneumatic Test package preparation & witnessing Pressure &
    Pneumatic test prior to release the Test Pack.
    * Interface with client's construction supervisors and Subcontractor QC personnel to deal with specific issues.
    * Liaising with procurement department (Milan & Algeria Offices) to initiate material requisitions, Purchase
    orders & its follow-up
    Accountable for Inspecting and witness examination of material supply.
    * Conversant with computerized inventory control system & Materials Management Software (Marian syst.)

    * Preserving all Materials as per Safety Data Sheet (MSDS) & Quality Management Procedure (QMP).Safe
    storage, handling, as per vendor / Manufacturer Instruction.
  • Saipem - Engineer QC Material

    Montigny-le-Bretonneux 2008 - 2009 Project : 300 M barrels /Day
    Contract Value: 2 Milliard Euro
    Control the material received in warehouse and specially to be the link between site material manager and QC Controller by checking all the materials and documents ordered during the project.
    - At inspection:
    - Visual inspection for damages, inspection of the conformity and traceability (included marking) against specifications, certificates and purchased order ;
    - Dimensional check of the material might be carried out with the support, if necessary, of relevant specialists. ;
    - Implement Engineering technical requirements and to coordinate inspection arrangements and material certification. ;
    - Checking of different material technical certificate (type 2.1 to 3.2), Mill certificate, PMI and PQR. ;
    - During the inspection, all Heat number shall be reported thoroughly on the MRN.
  • Saipem - Engineer QC Material

    Montigny-le-Bretonneux 2008 - 2010 Project : 300 M barrels /Day
    Contract Value: 2 Milliard Euro
    Control the material received in warehouse and specially to be the link between site
    material manager and QC Controller by checking all the materials and documents ordered
    during the project.
    - At inspection:
    - Visual inspection for damages, inspection of the conformity and traceability (included
    marking) against specifications, certificates and purchased order,
    - Dimensional check of the material might be carried out with the support, if necessary,
    of relevant specialists.
    - Implement Engineering technical requirements and to coordinate inspection
    arrangements and material certification.
    - Checking of different material technical certificate (type 2.1 to 3.2), Mill certificate, PMI
    and PQR.
    - During the inspection, all Heat number shall be reported thoroughly on the MRN.
  • Saipem - Engineer quality control material

    Montigny-le-Bretonneux 2008 - 2009 Control the material received in warehouse and specially to be the link between the material manager and QC Dept by checking all the material and documents ordred during the project.

    at inspection :
    -Visual inspection for damages, inspection of the coformity and traceability against specifications, certificates and purchased order,
    - dimensional check of the MTL might be carried out with the support, if necessary, of relevant specialists.
    -during the quality inspection, all Heat number shall be reported thoroughly on the MRN.
    Then, teh RFI should be signed by authorized party, and items from MRR have to be posted by syst. Mariana operator after receipt of signed RFI in copy.
  • Ourhoud Organization - Codification of material

    2004 - 2008 Project : crude oil 234 Mbarils /Day
    Coding and standardized the materials ordered by company, more than twenty five
    thousand items integrated in the software ``Intermat Struxure'' and managed by D7i Datastrem system.
    - Update of data, insertion of the manufacturer/supplier names' and additions of
    models/ part numbers and Tag number.
    - Preparation of the daily report and discrepancy reports of material to the physical
    reception.
    - Up-date of the physical inventory file's to each end year.
  • Ourhoud Organization - Cataloguer Engineer

    2004 - 2008 Project : crude oil 234 Mbarils /Day
    Coding and standardized the materials ordered by company, more than twenty five thousand items integrated in the software ``Intermat Struxure'' and managed by D7i Data-strem system.
    - Update of data, insertion of the manufacturer/supplier names' and additions of models/ part numbers and Tag number. ;
    - Preparation of the daily report and discrepancy reports of material to the physical reception. ;
    - Up-date of the physical inventory file's to each end year.
  • JGC-INITEC - Codification of Spart parts 2 years Exploitation

    2001 - 2003 Position : Materials & control Codification
    Contract Value: 800 milloin $
    Project : crude oil 230 Mbarils /Day process plaint

    Project involved materials control and codification for oil materials production in Ourhoud-
    field, CPH (Center of Production Hydrocarbon), responsibilities included more than nine
    thousand items ordered with the JGC-INITEC contractor's.
  • JGC-INITEC - Cataloguer Engineer

    2001 - 2003 Position : Materials & control Codification
    Contract Value: 800 milloin $
    Project : crude oil 230 Mbarils /Day process plaint
    Project involved materials control and codification for oil materials production in Ourhoud-field, CPH (Center of Production Hydrocarbon), responsibilities included more than nine thousand items ordered with the JGC-INITEC contractor's.
    Empolyer: PEPSI COLA Alegria ltd.
    Position: Maintenance operator machines
  • PEPSICO - Maintenance operator

    2001 - 2001 Maintenance of digital Kroness machine
  • Pepsi cola - Operator and Maintenance

    2000 - 2001 Maintenance of digital Kroness machine

Formations

  • Sonatrach (Hassi-Messaoud)

    Hassi-Messaoud 1998 - 1998 fin etude

    * Technical assistance of MT/HT electrical cables installation with project SONATRACH & TAS-Japan
    in Hassi-Messaoud / South Algeria.

    (SONATRACH)
    Period 1998
    * Six months of training with the SONATRACH Company, end study thesis subject :
    Drop Voltage during the start of two electrical motors 5.5kV.

    * Skills Inventory:
    * Plans and implements the best Qual
  • Sonatrach (Hassi-Messaoud)

    Hassi-Messaoud 1998 - 1998 STAGE PRATIQUE POUR FIN ETUDE

    * Technical assistance of MT/HT electrical cables installation with project SONATRACH
    & TAS-Japan
    in Hassi-Messaoud / South Algeria.

    (SONATRACH) Period 1998
    * Six months of training with the SONATRACH Company, end study thesis subject :
    Drop Voltage during the start of two electrical motors 5.5kV.


    * Skills Inventory:
    * Plans and implements the best Quality Ma

Réseau

Annuaire des membres :