Menu

Jean-Christophe ESTOUP-IRUBETAGOYENA

Gennevilliers

En résumé

• Project Manager with 8 years of experience focusing on competitive and innovative products development and industrialization
• Expertise in Budget Management, Resource Planning, Mechanical Design Engineering (plastic and metal), Functional analysis, FMECA, Innovative and Creative Methods
• Strong qualitative and quantitative analytical skills and proven ability to present results in a clear and concise manner
• International Focus: Worked over Europe and USA
• French - English - Spanish Trilingual
• Master of Science from Cranfield University (UK)

Mes compétences :
Automobile
Mécanique
Gestion de projet
Gestion budgétaire

Entreprises

  • Tesla Motors - Sr. Engineering Project Manager - Propulsion Systems

    Gennevilliers 2015 - maintenant
  • Tesla Motors - Senior Project Manager: New Product Introduction

    Gennevilliers 2014 - 2015  Increases European facility capacity by a factor 2, by implementing new equipment, standardizing jobs and decreasing cycle time
     Creates a financial gain of $X.XM/quarter by decreases vehicle manufacturing costs by ($XXXX) improving touch time, and reallocating resources
     Coordinates, monitors and manages technical cross functional team
    Purchasing/Manufacturing/Quality/Logistic/IT/Business System/Facilities
     Transfers assembly line line from Fremont facility to Netherlands (Conveyor line and End
    Of Line Testing)
     Implements new assembly line and testing line in Europe
     Manages project up to of XX,XXX,XXXUSD investments
     Manages Specifications, manufacturing/product validation and tuning (End Of line
    Equipment, Marriage systems, Tooling)
     Establishes and maintains timing schedule
     Manages the project reviews, consolidates actions plan and provides reporting
     Provides industrial plan, testing procedures, process trials & cut over schedules
  • Plastic Omnium Auto Exterior (Duncan, SC, USA) - Engineering Change Manager

    2013 - 2014 (Temporary replacement position)
    • Managed various combinations of Engineering Changes: tool modification (assembly tools, molds), product modification, production assembly line move to several plants...
    • Coordinated and monitored Purchasing/Manufacturing/Quality/Logistic activites for each change
    • Managed bumpers and fenders projects (BMW (E53, E70, E71, F25) and GM)
    • Secured XXX.XXXUSD
    • Defined a completely new process to implement, follow, track, and document input and output of a tuning.
    • Managed inventory of all tuned parts in accordance to customer build phases and requirements
  • Plastic Omnium Auto Exterior (Duncan, SC, USA) - Engineering Project Manager

    2013 - 2014 Missions:
    • Ensures the product design and product industrialization including associated tools (molds, checking fixtures, validation equipment, etc.) within the QCT requirements (non-event launch, robust manufacturing)
    • Ensures cross functional management of extended team
    • Ensure RETEX and lessons learnt

    Activities:

    Product design & validation:
    • Involved in upstream phases of the project (expertise phase, acquisition phase)
    • Analyzes Customer Needs and Draw-up PO Specifications
    • Defines the concepts of the product design to meet customers specifications and GD&T and ensures that the design for manufacturing (assembly, paint & packaging) are fulfilled
    • Is the main technical contact with the customer during the design & tuning phases
    • Manages and perform risk analysis (DFMEA + Design reviews)
    • Manages Specifications, manufacturing and validation of the means (injection tools, checking fixtures, test jigs, End Of Arm Tooling)
    • Manages Product validation (functional, geometry and cosmetic quality)
    • Manages Product tuning (mold tuning, checking fixture tuning)
    • Participates to the closure of project and gives feedback regarding best practices and difficulties

    Project Management:
    • Defines initial Statement of Work of product engineering perimeter including extended team, regarding project perimeter, development budget (hours)
    • Defines and set up the engineering project planning
    • Manages the engineering project reviews, consolidates actions and provides reporting and action plans
    • Proposes adjustments and modifications linked to perimeter evolution during project life time

    Budget management:
    • Allocates budget to his extended team
    • Ensures the follow up of project budget and escalade in case of deviation
    • Determines internal and external perimeter versus SOW
    • Contribute to investment optimization through part design
  • FMC Technologies (Sens, France & Dunfermline, UK) - Project Engineer

    2010 - 2012 Technical/Commercial package submission to customers
    • Analyzed customers technical needs, pre-designed and selected material regarding Quality-Cost-Delivery criteria and company strategy
    • Completed quotation layouts drafts
    • Secured 50M$ worth of new contracts

    Post orders engineering
    • Advanced design to match customer requirements

    Libya/Chad Base Support
    • Supported Service Engineers on field
    • Reported issues, and improved components after feedback
    • Created a database recording all special operations for each customer

    New product development
    • Developed with success worldwide retrofit key and technology advanced product
    • Managed workload for multi disciplinary and international team

  • FPK SA (Bilbao, Spain) - Automotive Project Manager

    2008 - 2010 Project Management from Request for Quotation to Final Delivery
    • Developed technical solution in plastic molded parts to replace metal sheets structural parts (Front End Carriers, Cockpit Carriers, etc …)
    • Entered in a new strategic customer into tactical project (electric car)
    • Managed projects for the French car manufacturer Renault, with high level of customer satisfaction
    • Specialized in Cockpit Carriers specifications
    • Led Engineering/Quality/Production/Logistic teams (up to 6 peoples)
    • Created documentation and actions related to Product Quality Plan (ANPQP)
    • Monitored suppliers and industrialization
    • Managed and monitored projects budgets
    • Secured 26.9M€ worth of new contracts (12.5% of annual turnover guarantied for 6 years)

    Mechanical Design
    • Managed and staffed CAD/CAE resources to comply with customer mechanical behaviors specifications, with a "design to cost" orientation
    • Created Design standard according to plastic molding operations

    Processes maintenance and creation
    • Tracked and reported European R&D projects status
    • Released, updated and improved Key Performance Indicators and processes

    FEA Analyst
    • Integrated new FEA tools: NX Nastran and PamCrash
    • Calculated static, harmonic and dynamic load cases, completed project reports
    • Developed report templates and engineering calculation standards
  • SAFT BATTERIES (Bordeaux, France) - System Intergration Engineer

    2006 - 2008 Mechanical design on electric truck
    • Designed and industrialized European project EUREKA KB1 Electric Hybrid
    • Interacted on a regular basis with suppliers and customers
    • Managed team a team of 3 drafters

    Test analysis
    • Tested prototype on site, recorded data, analyzed data, and improved design

    Continuous improvement
    • Developed C++ application for "torque" according to applicable standards
    • Released welding standard for symbolization and FEA application

Formations

Réseau

Annuaire des membres :