Menu

Jean-Marc CHAUTRU

CERGY

En résumé

Pas de description

Entreprises

  • IFP Middle East Asia W.L.L. (Bahrain)

    maintenant
  • Geovariances - Directeur Etudes et Formation

    2014 - maintenant Direction de la division Etudes et Formation, pour les secteurs Mines, Pétrole et Environnement.
  • Geovariances - Directeur Etudes et Formation, secteur Pétrole

    2013 - 2014
  • Beicip-Franlab - Consultant senior, Chef de projet

    1989 - 2013 KEY QUALIFICATIONS

    Expert in Reservoir Modelling (static and dynamic)

    •Technical supervisor for the use of geostatistical methods in the three Geosciences departments of Beicip-Franlab (Geophysics, Geology, Reservoir engineering).

    •Project manager for Integrated 3D Reservoir Modelling studies, with more than 18 years of worldwide professional experience. Acting as a senior consultant in the domains of rock-typing and reservoir modelling in complex environments.

    •Reservoir Engineer from mid 2004.


    EXPERIENCE RECORD SUMMARY

    2011:Technical advisor and Member of Technical Steering Committee for Rock-Typing and Reservoir Modelling; Integrated study of Burgan field, for KOC.

    2010-2011:Project manager, Reservoir Engineer and Reservoir Modelling advisor; Integrated study of Bul Hanine field, Arab D reservoirs for TOTAL and Qatar Petroleum

    2008-2010:Reservoir engineer & deputy project manager
    Integrated study of Maydan Mahzam field, Arab A, B, C, D reservoirs for TOTAL and Qatar Petroleum

    2004 - 2007:Reservoir engineer.
    -Studied fields: Magid, Gialo (Lybia).

    1997 - 2004:Rock-Typing and Reservoir Modelling Expert. Project Manager.
    -Expatriation during 3 years in Abu Dhabi.
    -Studied fields: Cantarell (Mexico); Shah, Asab, Sahil, Upper Zakum (UAE); Ghawar-North Haradh (Saudi Arabia); Hassi Messaoud (Algeria); Jusepin, Temblador (Venezuela).

    1989 - 1997:Project Manager at the Petroleum Software Division of BEICIP
    Development, marketing and technical support of IFP group software in the domain of GeoModelling.

    CONTINUING EDUCATION

    - 2 months of training in reservoir engineering (PVT, well tests interpretation, dynamic simulation) with IFP Training (2005).
    - Training session in management with MOORTGAT (2009).

Formations

Réseau

Annuaire des membres :