Mes compétences :
Recherche
Ingénierie
Pipeline
Mécanique
Ansys
Gestion de projet
Entreprises
SEAL Engineering (Nîmes)
- Subsea Engineering Project Lead
2011 - maintenantDONG Hejre Platform:
-Design and in-place analysis of subsea risers and J-tubes on a shallow water jacket platform.
.DNV-OS F101 based Pipelines design
.Free span length determination (Onset VIV)
.Global in-place analysis
VERTIWIND Project:
-Modelling and dynamic analysis of a floating vertical axis wind turbine
.Modelling of the vertical axis wind turbine
.Modelling of the floating structure
.Coupling analysis of the Hydro-aero-elastic structure
SEAL Engineering (Nîmes)
- Subsea Project Engineer
2006 - 2009SEAL Engineering (Technip Group), Nimes, France, 12/06 to 06/09
• Cascade and Chinook Project (Petrobras): In place analyses of Cascade and Chinook Free Standing Hybrid Riser (FSHR)
• Thunder Horse (BP): VIV fatigue Analysis
• CETO (EDF): On bottom Pipeline stability analysis
• PARADIP (Leighton): On bottom pipeline stability analysis
• PDET (Petrobras): In place and Fatigue analysis of the Free Standing Hybrid Riser Design (FSHR)
TECHNIP
- Subsea Pipeline Installation Specialist
Paris2006 - 2010Technip USA, Inc., Houston, TX
Installation Analyst
Shell Princess P3 Project (Shell):
•Installation analysis of the Rigid Steel Flowline and Riser using Orcaflex (3D non linear time domain finite element).
•Installation analysis of the Pipeline End Terminations (1st and End PLET) using Orcaflex.
•Fatigue installation analysis of the Rigid Steel Flowline and Riser using Orcaflex (3D non linear time domain finite element).
•Installation Analyst onboard the Deep Blue vessel during the Offshore campaign.
Appaloosa Project (ENI petroleum):
In charge of Installation Analysis
Caesar / Tonga Project (Anadarko):
•Installation analysis of the Rigid Steel Flowlines using Orcaflex (3D non linear time domain finite element).
•Installation analysis of the Pipeline End Terminations (1st and 2nd End PLET) using Orcaflex.
•Fatigue installation analysis of the Rigid Steel Flowlines using Orcaflex (3D non linear time domain finite element).
•Installation Analyst onboard the Deep Blue vessel during the Offshore campaign.
Europa Project (Shell):
•Installation analysis of the Rigid Steel Flowline using Orcaflex (3D non linear time domain finite element).
•Installation analysis of the Pipeline End Terminations (1st and 2nd End PLET) using Orcaflex.
•Fatigue installation analysis of the Rigid Steel Flowlines using Orcaflex (3D non linear time domain finite element).
Cap Gemini
- SAP PM Senior Consultant
SURESNES1999 - 2006• TOTAL: SAP Plant Maintenance consultant
• EUROCOPTER: SAP Production and Planning consultant