ALSTOM POWER
- Technical field advisor
Levallois-Perret Cedex
2012 - 2015
Technical field advisor commissioning (29 months, China)
Technical field advisor of the steam turbine and auxiliaries of Hongyanhe, China
4 new steam turbines of 4x1118MW in a nuclear power plant (PWR)
Scope : lube oil, jacking oil, turning gears, EHC fluid, gland steam, drain, instrumentation, DC starter
I provide technical advices and supervise the commissioning activities (performed by the client) of the 4 steam turbines
Since the performance of the machine is guaranteed by my company, I make sure the client perfom al the test complying
With the requirement of our procedures
I provide technical answers and write the required document to solve the site issues
I support, train and give presentation about the systems to the client
I col ect the technical feedback and analyze the possible improvements in partnership with the "new turbine" department of Alstom
My position on this project, with the complete responsibility of the turbine, al ows me to improve my pedagogic skil s and to solve technical
issues of our new machine and design
-
ALSTOM POWER
- Technical field advisor
Levallois-Perret Cedex
2012 - 2015
Technical field advisor commissioning (29 months, China)
Technical field advisor of the steam turbine and auxiliaries of Hongyanhe, China
4 new steam turbines of 4x1118MW in a nuclear power plant (PWR)
Scope : lube oil, jacking oil, turning gears, EHC fluid, gland steam, drain, instrumentation, DC starter
I provide technical advices and supervise the commissioning activities (performed by the client) of the 4 steam turbines
Since the performance of the machine is guaranteed by my company, I make sure the client perfom al the test complying
With the requirement of our procedures
I provide technical answers and write the required document to solve the site issues
I support, train and give presentation about the systems to the client
I col ect the technical feedback and analyze the possible improvements in partnership with the "new turbine" department of Alstom
My position on this project, with the complete responsibility of the turbine, al ows me to improve my pedagogic skil s and to solve technical
issues of our new machine and design
-
ALSTOM POWER
- Commissioning engineer
Levallois-Perret Cedex
2010 - 2011
commissioning engineer (3 months, France)
In charge of the lube/control oil flushing in Martigues France
New steam turbine of 250MW in a combined cycle
Thanks to my experience on the topic, I improved and accelerate the flushing process
commissioning engineer (12 months, Mexico)
In charge of the commissioning of the steam turbine and auxiliaries of Laguna Verde, Mexico
2 steam turbines of 2x817MW in a nuclear power plant (BWR)
In charge, during the night shift, of the lube oil, Electro hydraulic fluid, gland steam, drain, instrumentation
Integrated in a team of 4 commissioning engineers, I wrote/corrected the commissioning procedures
I coordinated our subcontractor during the commissioning activities
I performed the cold commissioning tests (loop checks, start up of the motors, flushings...) and the hot commissioning with
the synchronization of the machine
I worked in a radioactive area in accordance with the safety requirements of a BWR plant
This duty, in an international project, gave me the great opportunity to learn a new language and enhanced my interest
in the power engineering
-
ALSTOM POWER
- Commissioning engineer
Levallois-Perret Cedex
2010 - 2011
commissioning engineer (3 months, France)
In charge of the lube/control oil flushing in Martigues France
New steam turbine of 250MW in a combined cycle
Thanks to my experience on the topic, I improved and accelerate the flushing process
commissioning engineer (12 months, Mexico)
In charge of the commissioning of the steam turbine and auxiliaries of Laguna Verde, Mexico
2 steam turbines of 2x817MW in a nuclear power plant (BWR)
In charge, during the night shift, of the lube oil, Electro hydraulic fluid, gland steam, drain, instrumentation
Integrated in a team of 4 commissioning engineers, I wrote/corrected the commissioning procedures
I coordinated our subcontractor during the commissioning activities
I performed the cold commissioning tests (loop checks, start up of the motors, flushings...) and the hot commissioning with
the synchronization of the machine
I worked in a radioactive area in accordance with the safety requirements of a BWR plant
This duty, in an international project, gave me the great opportunity to learn a new language and enhanced my interest
in the power engineering
-
Alstom
- Commissioning engineer
Saint Ouen
2005 - maintenant
Commissioning engineer specialized in steam turbine
-
ALSTOM POWER
- Commissioning engineer
Levallois-Perret Cedex
2005 - 2010
commissioning engineer (5 years, Worldwide)
Commissioning lead specialized in steam turbine and its auxiliaries in power plant
I carried out smal project (about 1 or 2weeks) on site in order to test and readjust the systems
I led and trained a team of 2 to 5 peoples performing tests and Commissioning activities during start ups and outages
I provided to the client technical support during the shut down and start up of the machine
I improved my skills performing the intervention on site by complying the high EHSQ required in nuclear environment
I had the chance to carry out several projects throughout France, Mexico, Sweden, Morocco, Tunisia...
-
ALSTOM POWER
- Commissioning engineer
Levallois-Perret Cedex
2005 - 2010
commissioning engineer (5 years, Worldwide)
Commissioning lead specialized in steam turbine and its auxiliaries in power plant
I carried out smal project (about 1 or 2weeks) on site in order to test and readjust the systems
I led and trained a team of 2 to 5 peoples performing tests and Commissioning activities during start ups and outages
I provided to the client technical support during the shut down and start up of the machine
I improved my skills performing the intervention on site by complying the high EHSQ required in nuclear environment
I had the chance to carry out several projects throughout France, Mexico, Sweden, Morocco, Tunisia...
-
TRAINAT
- Assembly line
2003 - 2003
Boiler making
-
TRAINAT
- Assembly line
2003 - 2003
Boiler making
-
GLOBAL TRUCKS
- Production and design
2002 - 2002
-
GLOBAL TRUCKS
- Production and design
2002 - 2002