-
Air Liquide Engineering
- Instrument Design Engineer
Paris
2011 - maintenant
-
Single Buoy Moorings
- Instrument Design Engineer
2011 - maintenant
OSX2 project
-
Addax petroleum Gabon
- Instrument Projects Engineer
Geneva
2010 - maintenant
Addax Petroleum Gabon
Engineering Department
ICSS/Instrumentation Design
Laurent Le Saux
Zone Oprag, BP 452
Port Gentil, Gabon
Cellular : +24107983977
Phones office: +241564827 or 28 or 29
Laurent.LeSaux@addaxpetroleum.com
Projects:
Tsiengui plant (news wells on news clusters)
Obangue plant (news wells on news clusters)
Rabi/Addax plant (Rabi Pumping station)
-
Foster Wheeler France Engineering
- Instrument Projects Engineer
2010 - 2011
"Touat" gas project - GDF-Suez/Sonatrach companies
1 Central Processing Facilities, 42 gas wells and piping block valves.
FEED details engineering: instruments/ICSS philosophy and specifications.
Estimated material and details engineering: 20 Millions Euros (without ICSS inside Central Processing Facilities - company: GDF-Suez, without 42 gas wells and piping block valves outside Central Processing Facilities - sub-contractor: PENSPEN Engineering UK).
-
TOTAL E&P ANGOLA - ITV Services
- E&I Works Engineer
2009 - 2009
Background: angola petroleum company subsidiary of Total group
Project to involved: installation modification design for electrical, instrumentation and SCADA, following the Requests For Modification (process) - offshore.
Responsibility: Responsible E&I for technical/RFM/projects and planning follow-up of electrical/instrumentation contractors.
Contractors: Sonadiets (Sonangol/Dietsmann), SPIE Angola (SPIE group), Ponticelli, Friedlander Angola, INEO GDF-Suez group (SCADA).
Matérials : Triconex (Safety PLC) ; Masoneilan, Emerson Fisher Control (regulation valves) ; Cameron-Willis, Master Flo (choke valves) ; Sud Robinetterie, Cameron-Grove, SACCAP, Darco, Sern Ball Valves (on/off valves) ; Endress+Hauser, Emerson Rosemount, Honeywell (transmitters/flowmeters) ;Det-tronics, General Monitors Autochim (F&G)
Bloc 17 plant - offshore
#Girassol FPSO
o Request for modification - replacement of flare head by helicopter et 12 thermocouples (flare length 100 meters) during shut-down
o Request for modification – upgrade installation et replacement of UPS TOPSIDE during shut-down
o Request for modification – upgrade installation et replacement of UPS LIVING QUARTER
o Electrical power supply project (3 air compressors « 224 Kw/unit – 3600 meters – cable 185², 5 UHP pumps – 2000 meters – cable 120², design modification of SPIE electrical switchboards of TOPSIDE electrical room, 20 power junctions boxes) for FPSO Paint Program – 5 years
#Dalia FPSO
o Request for modification - integration new E-muster for Dalia LIVING QUARTER
Bloc 3 plant - offshore
#COBP1 platform
o Request for modification - integration galvanic barriers in regulation valves loops during shut-down
o Request for modification - loading SSS – Triconex safety program for new shelter integration during shut-down
#PAMF1 platform
o Request for modification - integration galvanic barriers in regulation chokes valves loops during shut-down
#COBF1 platform
o Request for modification - integration galvanic barriers in regulation chokes valves loops during shut-down
o Request for modification - integration of a new 12’’ ultrasonic flowmeter for gas flare metering
o Request for modification - loading SSS – Triconex safety program follow safety diagram modification
-
SAIPEM SA ENERGIE - Engineering & Erection Services
- Instrumentation Engineer
2009 - 2009
Background: french engineering & contractor company subsidiary of ENI group
Project to involved: Saipem Ponticelli Desicon OML58 upgrade phase 1 project – EPCC contract – Total E&P Nigeria.
Responsibility: Responsible instrumentation erection/revamping and planning follow-up of instrumentation sub-contractors.
Sub-contractors: Desicon Engineering, SPIE Nigeria (SPIE group).
Materials : Yokogawa, Triconex (Safety PLC) ; Masoneilan (regulation valves) ; Master Flo (choke valves) ; Cameron-Grove (on/off valves) ; ABB (transmitters/flowmeters) ;General Monitors Autochim (F&G)
-
TOTAL GABON - Works Services/Projects Section
- Instrumentation Project Manager
2007 - 2009
Background: Gabonese petroleum company subsidiary of Total group
Project to involved: installation modification design for instrumentation and SCADA, following the Requests For Modification (process). Onshore and Offshore plants upgrade installations projects. Wells ties-in after drilling, work over and side track.
Responsibilities: Project Manager. Preliminary design projects overall budget quotations. Organize, manage instrumentation engineering and works contractors for projects. Manage Long Leads Items materials
Contractors: Parifex Gabon, ECM Gabon (engineering) ; GEAI, STSI, SNEF Gabon, EIT Gabon, SOGAMAR/Dietsmann, Friedlander Gabon (works).
Matérials : GE Fanuc, Allen Bradley, Emerson-DeltaV/DeltaV SIS, HIMA (PLC/DCS/safety) ; Masoneilan, Emerson Fisher Control (regulation valves) ; Cameron-Willis, Master Flo (chokes valves) ; Sud Robinetterie, Cameron-Grove, SACCAP, Darco, Sern Ball Valves (on/off valves) ; Endress+Hauser, Emerson Rosemount, Honeywell (transmitters/flowmeters) ;Det-tronics, General Monitors Autochim (F&G )
Anguille plant - offshore
#AGMP platform
o Request for modification – replacement and retrofit Turboméca PLC for water injections pumps and energy turbines
#AGM4 platform
o 4 news oil wells ties-in after drilling projects on existing installation
#AGM15 platform
o 4 news oil wells ties-in after drilling projects on existing installation
o Installation news safety transmitters on separators, flowlines, annulars, manifolds equipments project
#AGMC platform
o 4 news oil wells ties-in after drilling projects on existing installation
#AGMPFC-AGM15-AGMP phase 1 project
o Long Leads Items requisitions materials and details engineering
Torpille plant – offshore
#TRMPFC/TRMPFK platforms
o Request for modification – replacement and retrofit Turboméca PLC for water injections pumps and energy turbines
o Request for modification – replacements 16’’600#RF ESDV on/off valves on expediting pipes during shut-down
#TRMPFH living quarter platform
o Integrations new Caterpillar power generator in replacement Turboméca power turbine and water mist safety protection, fire dampers, F&G system projects
#TRM1 platform
o Request for modification – report TRM11 and TRM25 oil wells pressures, temperatures et flows on PCS/PSS DCS
#TNEM platform
o MSSM3 oil well tie-in after drilling project on existing installation
#Flexible 4" HP gas BSM-HYM project
o Long Leads Items requisitions materials and details engineering
Grondin plant - offshore
#GRMPFC platform
o Integration new E&I cabin project on E&I existing cabins
#GRM2 platform
o Request for modification – modification gas lines et expansion valves S105 gas scrubber
#GNM platform
o Installation news safety transmitters on separators, flowlines, annulars, manifolds equipments project and integration new Gas Lift Enerflex’s compressor
#Flexible 4" HP gas BAM-MAM project
o Long Leads Items requisitions materials and details engineering
Atora plant – onshore
Request for modification – integration new departure ESDV cluster A
Request for modification – as conformity (ESDV, fuse loop) ATO4H well
Atora General Alarm project – integration new General Alarm system
Coucal/Avocette plants – onshore
Coucal/Avocette General Alarm projects – integration news General Alarm systems
Request for modification – Integration HIPS protection system on ADDAX station – Coucal plant
Mboumba plant – onshore
Mboumba General Alarm project – integration new General Alarm system
Mandji island plant – onshore
PG2 station upgrade installations project - Long Leads Items requisitions materials and details engineering
LO29 oil well tie-in after drilling project on new installation - Long Leads Items requisitions materials and details engineering
Cap Lopez Oil Terminal plant
Request for modification – replacement on/off valves on desalination separators
Request for modification – modification slop tank actions levels of w
-
TOTAL GABON - Surface Assistance/Instrumentation Service
- Instrumentation Engineer
2004 - 2007
Background: Gabonese petroleum company subsidiary of Total group
Project to involved: installation modification design for instrumentation and SCADA, following the Requests For Modification (process). Onshore and Offshore plants upgrade installations projects. Wells ties-in after drilling, work over and side track.
Responsibilities: Project Manager. Preliminary design projects overall budget quotations. Organize, manage instrumentation engineering and works contractors for projects. Manage Long Leads Items materials
Contractors: Parifex Gabon, ECM Gabon (engineering) ; GEAI, STSI, SNEF Gabon, EIT Gabon, SOGAMAR/Dietsmann, Friedlander Gabon (works).
Matérials : GE Fanuc, Allen Bradley, Emerson-DeltaV/DeltaV SIS, HIMA (PLC/DCS/safety) ; Masoneilan, Emerson Fisher Control (regulation valves) ; Cameron-Willis, Master Flo (chokes valves) ; Sud Robinetterie, Cameron-Grove, SACCAP, Darco, Sern Ball Valves (on/off valves) ; Endress+Hauser, Emerson Rosemount, Honeywell (transmitters/flowmeters) ;Det-tronics, General Monitors Autochim (F&G )
-
Comaser - Pointe Noire - Congo Brazzaville
- E&I Project Manager
2002 - 2003
Background: E&I Congolese Works Company
Project to involved: Works tenders won per the company
Responsibilities: Project manager. Responsible for organization (human resources & materials), engineering, procurement, planning, commissioning, start-up and End of Works binders.
Materials : Emerson Provox, Foxboro, Triconex (PLC/DCS/safety) ; Masoneilan, Emerson Fisher Control (regulation valves) ; Cameron-Willis, Master Flo (chokes valves) ; Sud Robinetterie, Cameron-Grove, SACCAP, Darco (on/off valves) ; Endress+Hauser, Emerson Rosemount, Honeywell (transmitters/flowmeters) ;General Monitors Autochim (F&G)
Total E&P Congo
#Nkossa platform
o Crude Oil expediting to Djéno Oil Terminal plant project
#Likalala platform
o Gas flare project
#Tchibouela platform
o Waters treatment project
AGIP Congo (ENI)
#DP1 platform
o PAGA system (SATEC) project
Congolaise de Raffinage (CORAF refinery)
Safety instrumentation of petroleum tanks project
Integration Foxboro DCS with loops hot transfer project
-
Total Fina Elf/Société Ivoirienne de Raffinage - Abidjan - Ivory Coast
- Deputy Site Manager
2001 - 2002
Background: Ivory refinery company subsidiary of Total group
Project to involved: DHC (Distillate Hydro Cracking) units instrumentation revamping project
Responsibilities: Deputy Site Manager. Responsible for organization (human resources & materials), contractors, follow-up, planning, commissioning, start-up and End of Works binders for revamping of instrumentation & DCS – DHC units and utilities project (phase 2)
Contractors: Auxitec (engineering); Norelec, Safreci, Selectron, Tieri, Ecobaci, Friedlander (works).
Materials : Foxboro, Modicon, Triconex (DCS/PLC/Safety) ; Masoneilan, Emerson Fisher Control (regulation valves); Emerson Rosemount, Foxboro (transmitters) ; General Monitors Autochim (F&G) ; Bently Nevada (monitoring),
Installation of news instruments (Rosemount, Foxboro)
Installation of news junction boxes.
Installation of news instrumentation cables
Installation of news cabinets
Civil engineering work follow-up
Revamping of new control room & technical rooms
Wiring junction boxes - interface & DCS cabinets (Foxboro)
Pre-commissioning, commissioning and start-up
-
Atos Origin Data Engineering Company – Bruz/Rennes - France
- ETDM Project Manager
2001 - 1999
Background: Data Engineering Company
Project to involved: To assist owners/operators and engineering firms (EPCs) in the conception and implementation of Electronic Technical Data
Responsibilities: ETDM Project Manager. Responsible for organization and standardization of the production and transfer of data and documents. To assist owners/operators and engineering firms (EPCs) in the conception and implementation of Electronic Technical Data and Document Management Systems followings projects:
Total Sirri (Saudi Arabia),
Total South Pars (Iran),
Shell Nigéria,
Gaz de France – C.N.E.,
Mar Profundo Girassol FPSO (Elf Exploration Angola) Stolt Offshore et Bouygues Offshore
-
SHELL GABON
- Maintenance Workshop Engineer
Libreville
1996 - 1999
Background: Gabonese petroleum company subsidiary of Shell group
Project to involved: Maintenance of Gamba’s Oil Terminal infrastructures and Rabi site.
Contractor: Ipedex – Rueil Malmaison
Responsibilities: Maintenance responsible electrical / instrumentation / electronic – Gamba’s workshop. OPS service.
Maintenance of electronic equipment (monitoring, regulators, meters, turbine cards etc.) the laboratory accessories (spectrometers, flash-point, etc.) water-treatment stations (Degremont), power generation system (Caterpillar), in charge of the detection of the portable gas detectors (Drager, Zellweger), administration of local personnel (10 persons) as well as the annual budget of the material ($2 millions)
-
ELF SEREPCA – Cameroon / COMSIP – Rueil Malmaison - France
- Senior Instrumentation Engineer
1995 - 1996
Background: Cameroon petroleum company subsidiary of Elf group
Project to involved: Start and two years spare parts elaboration and technical tree – Revamping of zone east compression project – maintenance engineering .
Contractor: Ipedex – Rueil Malmaison
Responsibilities: Senior Instrumentation engineer
Responsible for Computer Assistance for the maintenance, to the following levels:
Spare parts for start-up and two years’ operation further to the supplier’s recommendation (F27 SPIR Form), and follow-up & start-up of the technical enhancement of the equipment and components of Elf SEREPCA’s project, in order to optimise the action of maintenance
-
ELF CONGO/Technip Géo Production/Sofresid - France
- Senior Instrumentation Engineer
1994 - 1995
Background: Congolese petroleum company subsidiary of Elf group
Project to involved: Start and two years spare parts elaboration, operating manuals and technical tree – N’Kossa project (NKP, NKF1, and NKF2) – maintenance engineering .
Contractor: Ipedex – Rueil Malmaison
Responsibilities: Senior Instrumentation engineer
Responsible for Computer Assistance for the maintenance, to the following levels:
Spare parts for start-up and two years’ operation further to the supplier’s recommendation (F27 SPIR Form), and follow-up & start-up of the technical enhancement of the equipment and components of Elf Congo’s project, in order to optimise the action of maintenance
Elaboration of maintenance binders by functional system