Blagnac 2011 - maintenant• Development and deployment of lean projects at the Airbus Delivery Centre.
ATR (EADS)
- Trainee Logistic Engineer
Blagnac2011 - 2011• Optimisation of logistics of parts in the customisation department (interior aircraft and engines assembly plus test)
• Design of the new assembly line (supplying of energy, implantation of offices, work stations and stock zone).
FOREST LINE CAPDENAC
- Responsable Montage
2007 - 2010Manager of the assembly department at FOREST LINE CAPDENAC (Aveyron, France). Design and manufacture of large dimension machine tools (milling and laying carbon machines for aerospace and automotive industries)
• Manufacturing management (technicians and operators):
- high precision mechanical assembly, metrology and geometry of machines
- set up of hydraulic components, hoses and pipes connections, start-up of equipment
• Organising tasks to find the best according to deliveries, environmental constraints and operators abilities
• Ensuring that customers’ requirement and expectations are met
• Participating to the quality management ISO 9001:2008
• Validating new concepts in concordance to the manufacturing process.
• Reducing the time and cost by applying lean management, introducing standard work, reducing lead time and WIP
• Maintenance interventions and upgrading of customers‘ machines
University of Glasgow
- Designer
2006 - 2007Internship in materials department at the University of Glasgow (Scotland)
Mechanical engineering: R & D on the designing of a thermoforming station: Drawing the prototype and finding the best equipment (cost/quality/delivery constraints), Stress Analysis (FEA), Heat Transfer.
Forest Line Capdenac
- Apprenti Ingenieur Methodes
2004 - 2007- Responsible for subcontracting of the machine assembly:
• Consulting sub-contractors, negotiating and establishing contracts
• Planning tasks, managing a team of operators, checking and evaluating work.
• Result: a 25% reduction of assembly time and a 20% saving of costs.
- Responsible for 3 machines:
• Resolving assembly problems, stock managing, improvement of traceability
• Disassembly of machines and preparation for shipment to Japan
• Result: a 10% time reduction of production cycle and better traceability of shipment
- Trainer on machine maintenance:
• Teaching in a mechanical/hydraulic/electrical field for foreign customers
- Method technician:
• Designing assembly ranges and assembly tools to improve the quality and efficiency of the production process.
RATIER FIGEAC
- Stage Technicien Methode
2004 - 2004Method trainee: focused on creating assembly ranges of aircraft gas levels.