Chemical Engineer with professional experience as Process Engineer in Conceptual, Basic and Detail Engineering for petroleum, gas, carbochemicals industry.

CURRENT DUTIES AND KEY QUALIFICATIONS :

Basic process engineering : process simulation Aspen HYSYS & PRO II, material & thermal balance, utility consumption, PFD&PID, equipment calculation, data-sheets emission, security & safety study (control valves…). Process follow-up: checking of detail engineering conformity to basic process engineering rules. Risk analysis and HAZOP review. Technical control of equipment manufacturer propositions. «Site-survey» precommissioning,

AREA OF EXPERTISE

Oil & Gas sector: refinery debottlenecking & gas plant, crude oil / condensates stabilization, gas dehydration, gas sweetening & acid gas removal, tree-phase separation, gas compression, industrial utilities etc.

COMPUTER TOOLS :

Simulation: Pro II, Prosim, HYSYS, Fluent, Aspen Plus, Aspentech
Programmation : Fortran
Software : HTRI (exchanger calculation), AS400, ICAPS, Sertisoft

Mes compétences :
Ingénierie

Entreprises

  • Perenco - Process Engineer

    Paris 2018 - 2019 Gas Lift optimisation project: compressor package.
    Water injection & BS&W improvement project: sea water treatment package.
    SSLNG project (Sanaga project of Central Africa offshore): FLNG construction (Floating Liquefied Natural Gas production unit), pre-FEED of small scale LNG (30 MMscfd or 1500 m3 of LNG / day).
  • Total - Lead Process Engineer

    COURBEVOIE 2017 - 2018 Oudalle 2018 project. Basic Engineering Study and FEED for revamping of the existing plant HDA (Hydro De-aromatisation) in Normandie

  • DORIS Engineering - Senior Process Engineer

    Paris 2017 - 2017 Zinia Phase 2 STI (Subsea Tie-in) project for Total. PAZFLOR field development of Angola offshore.

    FPSO topside modifications:
    o PSV relief load calculation & EDP (emergency depressurization) calculations and HYSYS simulations
    o Control valves and pumps calculations
    o Flare network verification
  • Technip - Project Engineer

    Paris 2016 - 2017 ZapSib2 project estimated for $9.5 bln (ZapSibNeftekhim, subsidiary of Sibur).
    Construction of petrochemical complex located in Russian Siberia (Tobolsk), the biggest integrated complex for the production of polymers in Russia. The complex will integrate a stem cracker for production of ethylene, propylene and butane-butylene fraction (BBF) and will include polyethylene units and polypropylene unit.

    o Overseeing suppliers engineering documents, and ensuring this work is timely completed in compliance with required Russian codes and standards.
    o Ensuring of use of appropriate discipline standards in compliance with Russian regulation and national standards.
    o Checking and approval of engineering technical documents submitted by vendors.
  • NCOC (North Caspian Operating Company), Kazakhstan - Onshore Lead Process Engineer

    2015 - 2016 Kashagan field development $187 bln (large over pressured light oil accumulation with a high H2S content) for 370,000 bopd oil production with On-Shore gas processing design capacity of 220,000 bopd.
    EWRP - Eskene West Rail Project.
    The EWRP facilities will provide the capacity to export 300,000 bopd of oil and 4,500 t of Sulphur each day with extreme environmental conditions in winter due to ice cover and in summer due to high temperatures. The main Units of project: oil loading, Sulphur treatment and granulation, Sulphur Pastillation Unit, Utilities Configuration as Fuel Gas Unit, Power Generation Unit, SWS Water treatment plant.

    o Overseeing process engineering design work performed by the engineering Contractors.
    o Checking and approval of submitted engineering contractor and vendor design documentation.
    o Design verification and technical queries for the sulphur packaging, storage and rail loading facilities.
    o Participating in safety process management, HAZOP and HSE reviews.
  • TOTAL E&P Russia - Lead Process Engineer

    COURBEVOIE 2013 - 2014 Kharyaga Field development project, Phase III ($420-570 million)

    The phase III of project of the Kharyaga field development (above the Arctic Circle): maintaining a capacity of 30,000 BOPD by bringing new wells online and in addition, increasing water injection capacity to 60,000 BWPD, stop routine flaring and the upgrade of the CPF facilities for treatment and export of associated gas: installation of amines sweetening unit, Claus unit, mercaptan removal & dehydration unit, hydrocarbon dew point control unit, export gas compression, power generation unit.

    o Review of the pre-project studies and overseeing of the basis of design.
    o Participating in the endorsement of the Pre-project dossier by the FEED contractor. Checking of the deliverables to be produced for Process.
    o Coordination and supervising of Process studies for the Central Processing Facilities.
    o Checking of the design developing in line with the Pre-Project and the Statement of Requirements.
  • Le Gaz Integral - Sr. Process Engineer

    2012 - 2013 Norilsk Nickel Project - Customer: Copper plant and Nadezhda plant in Russia.
    FEED of two Claus SRU (sulphur recovery unit) with the guarantee of at least 95% utilisation of sulphur dioxide from exhaust metal production gases. The first phase of 1,8 billion project includes the construction of new capacities producing annually up to 950,000 t of sulphur with reducing sulfur dioxide emissions 4.5 times ($170 million).
  • PROSERNAT - Process Engineer

    RUEIL MALMAISON 2012 - 2012 08/2012 - 09/2012
    Refineria Batalla de Santa Ines Project - Modular NHT& CCR Units for new refinery of Bariven / PDVSA in Venezuela.
    Basic Engineering Study based on the AXENS documetation (hydraulic & mecanical guarentees).

    05/2012 - 08/2012
    GISSAR PROJECT - Republic of Uzbekistan
    Basic Engineering Study for development of gas-condensate fields Adamtash, Gumbulak, Djarkuduk - Yangi Kizilcha in Uzbekistan.
    Supply of technical documentation and equipment.
  • LITWIN - Sr. Process Engineer

    2006 - 2012 01/2012 - 04/2012
    EPC Project «Organic Rankine cycle for Turkish cement plant» (within the R&D project «Design, optimization and modeling of an organic Rankine cycle for waste heat recovery»).
    Feasibility study: Aspen HYSYS Simulations of the thermal loops: choice of optimal heat transfer medium&cooling agent, PFD, data-sheets.

    08/2010 - 12/2011
    R&D Project «CO2 capture by Amine Absorption».
    Aspen HYSYS Simulation of the CO2 Removal Plant: evaluation of CO2 removal efficiency according to steam consumption heat, reboiler temperature, number of absorption stages, stripper pressure.
    Patent registering in the form of an «Enveloppe Soleau» for a new process “FE&M” at the “Institut National de la Propriété industrielle” (National Institute of Industrial Property).

    05/2010 – 07/2010
    Project «Mimizan Cogeneration Plant» (France) - technical proposal for a biomass cogeneration plant 23 MWe – 39 ton/h steam.
    Safety valves sizing, desuperheaters design.

    10/2009 – 03/2010
    Project «Gas Plant D9» with Total-CERT (Researches &Technologies European Centre).
    Basic Engineering Study for revamping of the gas plant.
    Customer: TOTAL Normandy’s Refinery.
    Contingency analysis and discharge flow calculation for pressure relief valves.

    02/2009 –10/2009
    Project «OSCAR 1» (Gas compressor station). Customer : GRT gaz.
    Management of the Client and Supplier Punch List by with ICAPS software (Integrated Commissionning and Precommisionning System) – 10 months on site.

    08/2008 - 02/2009
    Project «Total CDU» with Total-CERT (Researches &Technologies European Centre).
    Feasibility study for the revamping of an atmospheric distillation & gas plant.
    Customer: TOTAL Normandy’s Refinery.
    Preflash column integration, P&FDs development, PRO II & HYSYS simulation, hydraulic calculation of transfer line, safety valves sizing, flare network sizing, equipment design (pumps, heat exchangers, separators, columns), equipment process data sheets.

    03/2008 - 08/2008
    Projects «Angaing» & «Laigang»
    EPC coal tar distillation plants in Anshan and Laiwu, Chine.
    Safety valves sizing.

    03/2007 - 03/2008 EPC Projects «Tanger (HTTSA)»
    Terminal of storage and the distribution of hydrocarbons (oil) to the port of Tangier.
    Basic Engineering Study.

    02/2006 - 03/2007
    Project «MMA» Engineering of a 100 000 ton/year Methyl Methacrylate (MMA) Plant in Leuna of 200 million € investment, Germany. Customer: QUINN Chemical GmbH.
    Detail engineering: hydraulic studies, equipment’s specification review, P&I D mark-up, control valves and instrumentation.
  • CEAMAG - Sr. Process Engineer

    2005 - 2006 Project «NPK fertilizer Plant relocation»
    Equipment design (pumps, heat exchangers, conveyors belts…), data-sheets emission (vessels, conveyors belts, crush, pumps, screens…), PID, PFD, “Safety manual”, “Piping list”, “Equipment list”, “Electrical consumer list”, “Monthly report”

  • SGS - Engineer / Project manager

    Arcueil 1999 - 2005 Certification expertise, team management, technical documents & clients contracts expertise, industrial equipment certification to export in Russia, process audits & assistance for ISO 9000 certification (Alstom Moteurs, Cryostar, TotalFina, …)
  • Coke & gas treatment plant, Moscow, Russia - Process Engineer

    1985 - 1998 • Ten years experience in the chemical industrial field
    • Project elaboration & news installations studies
    • Environment, control program elaboration & waste water treatment (plant purification station)

Formations

  • IFP School

    Rueil Malmaison 2008 - 2008 LNG
  • CristalDoc (Paris)

    Paris 2008 - 2008 ATEX 2 general
  • SLTI

    Paris 2008 - 2008 Excel VBA 1
  • CNAM (Paris)

    Paris 2005 - 2006 Process & Technologies
  • European Training Center (Paris)

    Paris 1998 - 1999 Quality Manager / Environment / Security (norms ISO 9000, 14001)
  • Mendeleev’s University Of Chemical Technologies (Moscow)

    Moscow 1979 - 1985 BAC+5

    Process Engineer

Réseau