Perenco
- Process Engineer
Paris
2018 - 2019
Gas Lift optimisation project: compressor package.
Water injection & BS&W improvement project: sea water treatment package.
SSLNG project (Sanaga project of Central Africa offshore): FLNG construction (Floating Liquefied Natural Gas production unit), pre-FEED of small scale LNG (30 MMscfd or 1500 m3 of LNG / day).
-
Total
- Lead Process Engineer
COURBEVOIE
2017 - 2018
Oudalle 2018 project. Basic Engineering Study and FEED for revamping of the existing plant HDA (Hydro De-aromatisation) in Normandie
-
DORIS Engineering
- Senior Process Engineer
Paris
2017 - 2017
Zinia Phase 2 STI (Subsea Tie-in) project for Total. PAZFLOR field development of Angola offshore.
FPSO topside modifications:
o PSV relief load calculation & EDP (emergency depressurization) calculations and HYSYS simulations
o Control valves and pumps calculations
o Flare network verification
-
Technip
- Project Engineer
Paris
2016 - 2017
ZapSib2 project estimated for $9.5 bln (ZapSibNeftekhim, subsidiary of Sibur).
Construction of petrochemical complex located in Russian Siberia (Tobolsk), the biggest integrated complex for the production of polymers in Russia. The complex will integrate a stem cracker for production of ethylene, propylene and butane-butylene fraction (BBF) and will include polyethylene units and polypropylene unit.
o Overseeing suppliers engineering documents, and ensuring this work is timely completed in compliance with required Russian codes and standards.
o Ensuring of use of appropriate discipline standards in compliance with Russian regulation and national standards.
o Checking and approval of engineering technical documents submitted by vendors.
-
NCOC (North Caspian Operating Company), Kazakhstan
- Onshore Lead Process Engineer
2015 - 2016
Kashagan field development $187 bln (large over pressured light oil accumulation with a high H2S content) for 370,000 bopd oil production with On-Shore gas processing design capacity of 220,000 bopd.
EWRP - Eskene West Rail Project.
The EWRP facilities will provide the capacity to export 300,000 bopd of oil and 4,500 t of Sulphur each day with extreme environmental conditions in winter due to ice cover and in summer due to high temperatures. The main Units of project: oil loading, Sulphur treatment and granulation, Sulphur Pastillation Unit, Utilities Configuration as Fuel Gas Unit, Power Generation Unit, SWS Water treatment plant.
o Overseeing process engineering design work performed by the engineering Contractors.
o Checking and approval of submitted engineering contractor and vendor design documentation.
o Design verification and technical queries for the sulphur packaging, storage and rail loading facilities.
o Participating in safety process management, HAZOP and HSE reviews.
-
TOTAL E&P Russia
- Lead Process Engineer
COURBEVOIE
2013 - 2014
Kharyaga Field development project, Phase III ($420-570 million)
The phase III of project of the Kharyaga field development (above the Arctic Circle): maintaining a capacity of 30,000 BOPD by bringing new wells online and in addition, increasing water injection capacity to 60,000 BWPD, stop routine flaring and the upgrade of the CPF facilities for treatment and export of associated gas: installation of amines sweetening unit, Claus unit, mercaptan removal & dehydration unit, hydrocarbon dew point control unit, export gas compression, power generation unit.
o Review of the pre-project studies and overseeing of the basis of design.
o Participating in the endorsement of the Pre-project dossier by the FEED contractor. Checking of the deliverables to be produced for Process.
o Coordination and supervising of Process studies for the Central Processing Facilities.
o Checking of the design developing in line with the Pre-Project and the Statement of Requirements.
-
Le Gaz Integral
- Sr. Process Engineer
2012 - 2013
Norilsk Nickel Project - Customer: Copper plant and Nadezhda plant in Russia.
FEED of two Claus SRU (sulphur recovery unit) with the guarantee of at least 95% utilisation of sulphur dioxide from exhaust metal production gases. The first phase of 1,8 billion project includes the construction of new capacities producing annually up to 950,000 t of sulphur with reducing sulfur dioxide emissions 4.5 times ($170 million).
-
PROSERNAT
- Process Engineer
RUEIL MALMAISON
2012 - 2012
08/2012 - 09/2012
Refineria Batalla de Santa Ines Project - Modular NHT& CCR Units for new refinery of Bariven / PDVSA in Venezuela.
Basic Engineering Study based on the AXENS documetation (hydraulic & mecanical guarentees).
05/2012 - 08/2012
GISSAR PROJECT - Republic of Uzbekistan
Basic Engineering Study for development of gas-condensate fields Adamtash, Gumbulak, Djarkuduk - Yangi Kizilcha in Uzbekistan.
Supply of technical documentation and equipment.
-
LITWIN
- Sr. Process Engineer
2006 - 2012
01/2012 - 04/2012
EPC Project «Organic Rankine cycle for Turkish cement plant» (within the R&D project «Design, optimization and modeling of an organic Rankine cycle for waste heat recovery»).
Feasibility study: Aspen HYSYS Simulations of the thermal loops: choice of optimal heat transfer medium&cooling agent, PFD, data-sheets.
08/2010 - 12/2011
R&D Project «CO2 capture by Amine Absorption».
Aspen HYSYS Simulation of the CO2 Removal Plant: evaluation of CO2 removal efficiency according to steam consumption heat, reboiler temperature, number of absorption stages, stripper pressure.
Patent registering in the form of an «Enveloppe Soleau» for a new process “FE&M” at the “Institut National de la Propriété industrielle” (National Institute of Industrial Property).
05/2010 – 07/2010
Project «Mimizan Cogeneration Plant» (France) - technical proposal for a biomass cogeneration plant 23 MWe – 39 ton/h steam.
Safety valves sizing, desuperheaters design.
10/2009 – 03/2010
Project «Gas Plant D9» with Total-CERT (Researches &Technologies European Centre).
Basic Engineering Study for revamping of the gas plant.
Customer: TOTAL Normandy’s Refinery.
Contingency analysis and discharge flow calculation for pressure relief valves.
02/2009 –10/2009
Project «OSCAR 1» (Gas compressor station). Customer : GRT gaz.
Management of the Client and Supplier Punch List by with ICAPS software (Integrated Commissionning and Precommisionning System) – 10 months on site.
08/2008 - 02/2009
Project «Total CDU» with Total-CERT (Researches &Technologies European Centre).
Feasibility study for the revamping of an atmospheric distillation & gas plant.
Customer: TOTAL Normandy’s Refinery.
Preflash column integration, P&FDs development, PRO II & HYSYS simulation, hydraulic calculation of transfer line, safety valves sizing, flare network sizing, equipment design (pumps, heat exchangers, separators, columns), equipment process data sheets.
03/2008 - 08/2008
Projects «Angaing» & «Laigang»
EPC coal tar distillation plants in Anshan and Laiwu, Chine.
Safety valves sizing.
03/2007 - 03/2008 EPC Projects «Tanger (HTTSA)»
Terminal of storage and the distribution of hydrocarbons (oil) to the port of Tangier.
Basic Engineering Study.
02/2006 - 03/2007
Project «MMA» Engineering of a 100 000 ton/year Methyl Methacrylate (MMA) Plant in Leuna of 200 million € investment, Germany. Customer: QUINN Chemical GmbH.
Detail engineering: hydraulic studies, equipment’s specification review, P&I D mark-up, control valves and instrumentation.
-
CEAMAG
- Sr. Process Engineer
2005 - 2006
Project «NPK fertilizer Plant relocation»
Equipment design (pumps, heat exchangers, conveyors belts…), data-sheets emission (vessels, conveyors belts, crush, pumps, screens…), PID, PFD, “Safety manual”, “Piping list”, “Equipment list”, “Electrical consumer list”, “Monthly report”
-
SGS
- Engineer / Project manager
Arcueil
1999 - 2005
Certification expertise, team management, technical documents & clients contracts expertise, industrial equipment certification to export in Russia, process audits & assistance for ISO 9000 certification (Alstom Moteurs, Cryostar, TotalFina, …)
-
Coke & gas treatment plant, Moscow, Russia
- Process Engineer
1985 - 1998
• Ten years experience in the chemical industrial field
• Project elaboration & news installations studies
• Environment, control program elaboration & waste water treatment (plant purification station)