Loic BOONE

SURESNES

En résumé

Installation Engineer with the following skills :

Rigid pipeline Installation Method :
- Team Management
- S-Laying Shallow Water (including anchored moored Barge)
- Spools, Risers, Launched Risers, Above Water Tie Operation
- S-Laying in Deep Water
- J-Laying
- Structure Installation in J-Lay
- Engineering on Tenders
- Autocad

Rigid Pipeline Design:
- Crossing Design, out of roughness studies
- SAGE Profile

Entreprises

  • Subsea 7 - Lead Engineer

    SURESNES 2014 - maintenant Lead Engineer on Lianzi SURF (Chevron) in Angola, Fast Track Project:
    - Management of a team of 7 Engineers in charge of the installation of a 38.7km Pipeline with 2 In Line Structures installed in S-Lay and 2 Termination Structures installed in J-Lay.
    - Responsible for the Design & Procurement of all Installation Aids (Lifting Riggings & Fabrication Items).
    - Interface with Client
    - Interface with SCM
    - Interface with Draughting Department
    - Manhours, budget and Progress Follow-up
  • Subsea 7 - Lead Engineer

    SURESNES 2013 - 2014 Lead Engineer working on Tenders:
    - Responsible for the technical work of a Team of 3 Engineers working on different tenders (Part of Borealis Vessel Support Team (VST)).
    - Responsible for the delivery & the Technical validation of the following Tender documents:
    Installation Method Statement for Pipeline Installation
    Operation Time Estimate
    Client Specification Review & Technical Qualifications
    Installation Engineering Man-hours
    Master Document Register
    Operation Feasibility Review
    - Tenders Performed: KGD6 (Reliance); Mozambique LNG (Anadarko); ETAN Risers & Flowline (ENI); West Nile Delta (BP); Tanzania Gas Project (study for Statoil)
  • Subsea 7 - Lead Engineer

    SURESNES 2012 - 2013 Lead Engineer on Block 31 GES Project (BP) in Angola, Fast Track Project:
    - Responsible of a team of 7 Engineers in charge of the installation of a 50km pipeline in S-Lay in extra deep water (1st S-laying project in 2000m water depth within Subsea 7) and 2 End Termination structure in J-Lay.
    - Responsible for the Design & Procurement of all Installation Aids (Lifting Riggings & Fabrication Items).
    - Interface with Client
    - Interface with SCM
    - Interface with Draughting Department
    - Manhours, budget and Progress Follow-up
  • Subsea 7 - Lead Engineer

    SURESNES 2011 - 2012 Lead Engineer working on Kaombo Tender (TOTAL):
    - Responsible of one Engineer working on Tender Technical documentation
    - Responsible of the Technical optimization of the Field Layout and the improvement of Installation methods to reduce installation cost.
    - Interface with Consortium Partner
    - Interface with Commercial Tendering Team
  • Acergy - Senior Engineer

    SAINT MAURICE 2010 - 2011 Senior Engineer working on EGP3B Project (Chevron) 600M$:
    - Responsible of a Team of 2 Engineers, then 5 Engineers at mid project, in charge of the installation of Pipelines in S-Lay very Shallow Water, Launched Risers, Spools & Above Water Tie Ins.
    - Development of Launched Riser Installation Procedures
    - Development of Above Water Tie Ins procedure
    - Installation Aids Design & Procurement
    - Offshore Campaign of 5 weeks on Acergy Antares for Installation Activities
  • Acergy - Senior Engineer

    SAINT MAURICE 2009 - 2010 Senior Engineer working on P55 Tender (Petrobras, 150M$).
    - Responsible for the delivery of the following deliverables for the Tender:
    Pipeline & SCR Installation Method Statement
    Time Estimate
    Specification Review & Technical Qualifications
    Engineering Installation Man-hours
    Master Document Register
    Pipeline Operation Feasibility Review
  • Acergy - Project Engineer

    SAINT MAURICE 2007 - 2009 Project Engineer on Block 15 Project (Exxon Mobil - 600M$) in Angola :
    - Responsible of the Pipeline Initiation Structures Installation Procedure
    - Responsible of the Procurement & Design of the Installation Aids of the procedure
    - Responsible of the J-Lay Tower specific equipment design & procurement for the project
    - Offshore mission (10 weeks) onboard ACERGY Polaris for S-Laying & J-Laying activities
  • Acergy - Graduate Engineer

    SAINT MAURICE 2007 - 2007 - Responsible of the Pipeline Laying Procedure. (S-Lay in Shallow Water & Flanged Spool installation by Divers)
    - Responsible of the Anchoring procedure for the laying Barge (Orion).
    - Onshore Mission for Existing Material identification in Port Gentil, Gabon
    - Offshore mission of 6 weeks onboard ACERGY Orion for S-Laying and Spool activities.
  • Acergy - Graduate Engineer

    SAINT MAURICE 2005 - 2007 Graduate Engineer on Greater Plutonio (BP, 900M$) in Angola :
    - Responsible of the Crossing design taking into account lateral buckling phenomenon
    - Development of a specific Crossing supports to limit lateral displacement of the pipe
    - Onshore mission (6 weeks) for Suction Pile for FPSO & Flowlines SIT in Lobito, Angola