Menu

Marc-Antoine AHOUSSI

ISSY LES MOULINEAUX

En résumé

Mes compétences :
Ingénieur travaux
Propylene
Offshore Oil & Gas
Daily work front supervision
Benzene
Welding
Stainless steel
Selection of suppliers and subcontractors
Procurement
Microsoft Project
Microsoft Office
Autocad

Entreprises

  • TOTAL EPCC4 - Piping Lead

    2013 - 2014 Position: Piping Superintendant - OFON 2 Offshore

    Technical environment
    * Project TOTAL OFQ Offshore Piping Construction Rotation 4/4

    Project
    * Construction of living Quarter OFQ/OFP2.

    Duties
    Work front supervision and follow up of piping PVV erection on site with the local subcontractors, area for (cooling water, Sea water, diesel unloading station and air instrument and air receiver station package, follow and prepare the piping pressure test, flushing and gross air leak test for the subsystem, and pneumatique test for each system and for each line follow the reinstatement status before the cleaning and flushing, organized the Test pack progress by daily status, and realize the RFC dossier as per ICAPS and Opercom test and task sheets.
  • SCHUMLBERGER-TOTAL - Piping Lead

    2012 - 2012 Position: Piping Lead

    Technical environment
    * Petrole Oil&Gaz

    Project
    * Skid and Module yard Construction for the brut shared

    Duties
    Planning of the project, follow-up the work front progress, control of the site welds progress, checking the piping erection and issue the punch for construction, measurements the thicknesses, follow the suppliers bid and follow up of all teams of welders/pipe and fitters during prefabrication and erection on site, of the pipe assembly, review the discrepancy between the PID and isometric before the tests pack, issue the method statement for each pressure test and flushing for piping, prepare the summary for the punch cleared before the handover the skid to the client.
  • TECHNIP-HATCH - Piping Lead

    2012 - 2013 Position: Piping Superintendant - Met Plant 2

    Technical environment
    * Project KONIAMBO Nickel SAS

    Project
    * Construction of Metallurgie Plant Line 2.

    Duties
    Daily work front supervision and follow up of piping erection on site and prefabrication on subcontractors lay down, area for (Refinery, Shooting system, Ladle tittable car 1 & 2, Dosing system, and Metallurgy plant 2) follow the piping pressure test for the hydraulic system and for each line follow the reinstatement status before the cleaning and flushing, issuer for the materials request for the additional site design modifications or site instructions per package and follow the subcontractors for the new work front, organized NDT coordination during the repairs work for hydraulic system, and Test pack progress by daily status, consultation of the suppliers for small pipe and PVDF lines.
  • TEREOS - Site Manager

    Origny-Sainte-Benoite 2011 - 2012 Technical environment
    * Sucreries TEREOS-SVI

    Project
    * Construction of the new line in other to increase the exchanger's capacity.

    Duties
    Purchases the summary of built of materials, followed by the initial work of erection step work for piping work in accordance with the project requirement, and erection field by welding and fitter (purchase for materials, client orders, manhours per work front, and billing status per work front), PEHD piping erection, follow-up of the mechanical teams and piping materials erection on site in a daily work and daily progress by the report and the meeting with the client. Tanks and pumps erection and alignment on site. Follow up the air instrument lines and PEHD lines.
  • CEA &THALES - Assistant Site Manager

    2009 - 2011 Technical environment
    * Nuclear and Test Plant

    Project
    * Construction of vacuum and utilities lines packages on the Project / Package E16 and E18

    Duties
    Participation and estimates work front for piping and mechanical duration. Follow up the assembly pieces for vacuum test and all elements aluminum for all NDT control, for the stainless piping, tests of the nuclear station with LMJ fission from THALÈS D3S. Control execution procedure, planning of the mobilization during the project, follow-up of work front for prefabrication, assembly and erection, and NCR's on site, site design modifications and consultation the suppliers for small edge, follow-up of the cleaning, flushing and test pack for the SS lines, follow up the assembly for vacuum line and vacuum test by system.
  • Alstom Power ECS - Resp Chantier Denox

    2009 - maintenant Resp des travaux d'amèlioration de tuyauteries, des gaines, des dampers des joints et du Montage mécanique sur les DeNox, Choix des sous-traitants et fournisseurs, Participer à l’élaboration technique des procèdures de reparation, Participer à la sélection des solutions techniques appropriées, Négocier avec les fournisseurs et éventuels sous-traitants
  • TOTAL- ANGUILLES - Project Engineer

    2008 - 2009 Project
    * Piping construction for all Module Yard scoop on Total AGM offshore

    Duties
    Checking of material arrival on site, checking the piping classes, ball valves and fittings before purchases order, follow-up of work front of prefabrication and site erection, NDT coordination during the work in accordance with Total requirements, prepare the test pack with the PID and the isometrics, follow the work front on site and Test pack progress system by system, consultation of the suppliers for small pipes, follow-up of prefabrication and erection of pipe, daily report and monthly progress, with also test package release, and reinstatement progress, cleaning the punch item and test follow up the pneumatic test for the remain lines.
  • PROFILTUBMECA - Ingénieur Travaux

    LYON 2007 - maintenant Projet de traitement des Denox avec SUEZ CPCU, ECOMB AB & Roche Techno

    Consultation des fournisseurs et suivi des Spécifications d’achats des éléments de tuyauteries et de robinetèries Choix des sous-traitants et fournisseurs, Participer à l’élaboration technique des TS, Participer à la sélection des solutions techniques appropriées.
  • OMRIN & AEE - Site Manager

    2007 - 2008 Project
    * Construction of power plant 120t/h by incineration of waste.

    Duties
    Daily work front supervision and purchases order following per package, follow up the initial work and resolved the field design modifications for piping and mechanical, steam lines, registers, follow-up of piping line preassembly and reviewed during erection for the boiler assembly step and structural assembly by EIMANTS, NDT coordination during prefabrication and erection step on site, and Test pack status and daily progress, consultation the suppliers for small pipe.
  • TOTAL - Project Engineer

    COURBEVOIE 2006 - 2007 Project
    * Construction of new loading station for benzene and propylene

    Duties
    Control and reception of the prefabrications spools, control the valves and fittings requirement before purchases orders, follow-up of daily work in the erection site and follow up test pack progress and reinstatement progress system by system, prepare and realization the consultation of the suppliers for small edge, follow-up of site erection, daily progress report realize for the client, for each system and punch item, cleaning and flushing the stainless steel line CAT 3 as per DESP, checking line before the hand over the lines to the commissioning team at petrochemical Platform to TOTAL CARLING
  • TOTAL - Piping Engineer

    COURBEVOIE 2006 - 2006 Project
    * Construction of new line for the loading station for benzene and propylene

    Duties
    Control and reception of the prefabrication and erection, Follow-up of daily work in the erection site and follow up test progress for the safety line and reinstatement progress system by system, prepare and realization the consultation of the suppliers for small edge, follow-up of site erection, daily progress report realize for the client, for each system and punch item, cleaning and flushing the stainless steel Platform to TOTAL DONGES.
  • Profiltubmeca - Ingénieur Travaux

    2006 - maintenant Suivi des travaux de tuyauteries, chaudronneries et Montage mécanique des ESP, Suivi des avancements de travaux et facturation des affaires, Chiffrages et planifications des consultations clients,
    Consultation des fournisseurs et suivi des Spécifications d’achats des éléments de tuyauteries, Choix des sous-traitants et fournisseurs, Participer à l’élaboration technique des offres, Participer à la sélection des solutions techniques appropriées.

    Projets: Total Gargenville reseau incendie, Arrêt 2007 Total Grandpuits lignes de torches; Pomperies GRT gaz de Cerville

Formations

  • ENSAM

    Paris 2005 - 2006 Master of Science
  • Ecole Nationale Supérieure Des Arts Et Métiers (Paris)

    Paris 2005 - 2006 Mastère Spécialisé ENSAM ParisTech
  • Institut National Polytechnique Félix Houphouet-BOIGNY (INP-HB) (Yamoussoukro)

    Yamoussoukro 2004 - 2005 INGENIEUR MECANIQUE POLYTECHNIQUE
  • Institut National Polytechnique De CI INP-HB CI (Yamoussoukro Ci)

    Yamoussoukro Ci 2001 - 2004 Mécanique et procèdés de Fabrications

    Ingénieur Industriels Option: Mécanique
  • Preparatory School MPSI

    Abidjan 1998 - 1999 Bac S

Réseau

Annuaire des membres :