Vinci Construction Grands Projets
- Plant Engineer
Rueil-Malmaison Cedex
2012 - maintenant
Egypt - Assiut: Dam construction during 2 months, to make the hand-over between two plant managers
Hong-Kong: Tunnel construction during 3 months, for the start of the project.
-
IFP
- Trainee
CHAMBRAY LES TOURS
2008 - 2008
Reduction of the vibratory level of an automotive engine.
-
Vinci Construction Grands Projets
- TBM (Tunnel Boring Machine) Mechanical & Methods Engineer
Rueil-Malmaison Cedex
2008 - 2012
TBM (Tunnel Boring Machine) mechanical enginner on the construction of a tunnel in Hallandsas, Sweden.
- Follow-up of the maintenances and modifications on the TBM.
- Follow-up of the team in charge of the maintenance of the TBM.
- Follow-up of the dismantling, transfert and re-assembly of the TBM (200m long, 10m wide) between the first and the second tunnel.
- Responsible of the methods and planning for the dismantling of the tunnel utilities (7,5km of equipments done in 5 weeks).
- Design and development of a web-site and database to follow and record all the interventions on the TBM.
- Contact with the suppliers.
- Responsible of the rescue chamber training.
-
Hwaseung R&A
- Trainee
2007 - 2007
Optimization of the thickness of the inner panel of an automotive door, for Hwaseung R&A (Yangsan, South Korea).