Menu

Maxime RESPAUT

SURESNES

En résumé

Mes compétences :
project

Entreprises

  • Subsea 7 - Installation Engineer

    SURESNES 2010 - maintenant Main duties include:

    Onshore:
    • Prepare / coordinate procurement, fabrication and installation documentation (scopes of work, procedures, drawings, sketches, etc).
    • Supervise the specific calculations and installation analyses
    • Control / coordinate procurement, fabrication and installation activities.
    • Ensure that the work done respects the specificities and industrial standards of the project
    • Prepare and deliver presentations at HIRAs, TBTs etc.
    Offshore:
    • Manage offshore engineering issues and third party subcontractors.
    • Offshore supervision.


    Installation Engineer: CLOV project, Deep water offshore Angola, Total (Ongoing)

    • Develop installation procedures for the deepwater pipelaying procedures in S-Lay and J-Lay (including Pipe-in-Pipe flowlines), ILT installation procedure in S-Lay, Transportation plan for all the flowline joints and 52 FLET/ ILT.


    Installation Engineer: OSO RE project, Shallow water offshore Nigeria, ExxonMobil

    • Develop installation procedures for concrete mattresses, Pipelay mooring procedures, Shallow water pipelines laying procedures in S-Lay and transportation plan.
    • Offshore supervision for the above scopes with the addition of existing risers and pipelines removal.
    • Onshore logistic in Nigeria, including procurement and subcontractor follow-up.
  • Saipem SA (through Anotech Energy) - Installation engineer

    2009 - 2010 Installation Engineer: USAN project, Deep water offshore Nigeria

    - Installation analyses on the umbilicals (deployment of subsea termination, normal laying and laying over subsea arches, pull-in operations on the FPSO)
    - Installation analyses on the off-loading system.
    - Liaise with design department and method department
  • Noble Denton Consultant - Project Engineer

    2008 - 2009 Project Engineer for 2 FPSO projects: Disconnect Tow and Reconnect of the Curlew FPSO (Central North Sea 90m WD) and Anasuria FPSO No9 chain reinstatement (Central North Sea 95m WD)

    Onshore support
    - Develop installation procedures for the mooring operations (disconnection, abandon on the seabed and reconnection of the mooring lines).
    - Provide planning and cost control throughout the project for both onshore and offshore activities
    - Design, specify and coordinate procurement of all the equipment required for the project. Liaise with various suppliers.
    - Supervise and perform engineering studies to support the procedures.
    - Attend project meetings, client meetings and HIRAs

    Offshore attendance on the FPSO
    33days for the Curlew Project (including dry dock attendance) and 7 days for the Anasuria Project
    - Assist the Marine Superintendent in supervising the disconnection, reconnection and tensioning of the mooring lines.
    - Provide engineering support to resolve emerging problems
    - Ensure that procedures are understood and followed. Identify and raise Management of Change and Technical Risk Assessment
    - Monitor use of equipment
    - Liaise with all parties and vessels involved in the operation
  • Noble Denton Consultant - Engineer

    2007 - 2008 Engineer for various analysis works.

    - Quasi-static and dynamic mooring analyses mainly for Mobile Offshore Drilling Unit, Flotel and Pipelay vessel operating in the North Sea and Gulf of Mexico
    - Riser analysis for rigid drilling risers operating in deep water.
    - Motions analysis to determine gangway operability
    - Seafastening designs including load-out attendances

Formations

Réseau

Annuaire des membres :