Nicolas GRAVELINE

Wasquehal

En résumé

Mes compétences :
Project manager

Entreprises

  • VERDIA - Directeur associé/Stratégie énergétique

    Wasquehal 2016 - maintenant Entreprise de 50 employés crée en Novembre 2015 a Sydney (Austrlie)pour gérer le programme de finance de projets d’efficacité énergétique pour la Westpac Bank.
    ▪ Identification, dimensionnement, chiffrage et gestion des appel d’offres pour des projets de performance énergétique pour clients commerciaux (Solaire, éclairage, biomasse, système de gestion/mesure d’énergie).
    ▪ Développent d’outils d’analyse, de modèles financiers, de supports de vente.
  • Independant Consultant - Senior Associate

    2013 - maintenant - Energy Efficiency in Industrial Processes, Water Systems and Buildings (Energy Audits, EEO Assessment)
    - Greenhouse gas emissions assessment and strategic advisory services (e.g. NGER Report, )
    - Advisory services around the Clean Energy Regulation (Jobs and Competitiveness Program, Carbon Farming Initiatives, ANREU, OTN and Emission Trading Scheme), the NSW Energy Saving Scheme (Preparation of Application to become Accredited Certificate Provider, RESA definition, revenue estimate from Energy Saving Certificates) and the Renewable Energy (Electricity) Regulation (generation of RECs, LGC and STC, application to become Registered Person or Accredited Power Plant).
  • Kujika Solutions - Gerant

    2011 - maintenant Developpement d'une application comme service permettant la mise en compétition de différentes équipes au sein d’une entreprise sur des critères environnementaux.
    Création de l’entreprise, du produit et recherche de fonds.
  • PERENIA Carbon - Senior Analyst Energy Efficiency and Greenhouse Gases

    2011 - 2012 Here at Perenia, I have been managing a large number of projects, having a team of four employees. The service provided to our clients in the mining and resources sector , in the manufacturing industry as well as in the waste and wastewater management industry range from:
    - preparation of compliance reports (NGER and EEO reports),
    -elaboration of Energy and Carbon Management Plan,
    - develop financial models to assess mitigation or energy saving options (inclusive of Carbon Price, Forward Energy Cost, opportunities from Carbon Farming Initiative, Emission Intensive Trade Exposed activities and Renewable Energy Certificate),
    - undertake greenhouse gas assessment (NGER, Life Cycle Assessment, ISO 14064) and
    - undertake Energy Audits.
    Recently I have been developing Perenia’s product offering, particularly in terms of strategic consulting services which combined the expertise from our Carbon Transaction Services and our Carbon and Energy Advisory and Audit Team but also preparing our clients to the Carbon Pricing Mechanism.
  • SMEC - Project Engineer in Water and Waste Water.

    2010 - 2011 1. CONCEPT AND DETAIL DESIGNING
    - Concept Design of Sewage Treatment facilities for Recycling (MBR plant for 12000 EP) - ,
    -Optimisation of a Water Recycling Scheme – Flow Structures, Chlorination, UV Treatment (Concept Design) ,
    - Design Process for a Contaminated Soil Treatment Plant (6 weeks in Doha, Qatar + 4 weeks in North Sydney)
    - Pumping station for sewage or clear water (mainly for Sydney Catchment Authority and Councils in NSW).

    2. Planning
    - Development of work schedules and work sequences,
    - Resources Allocation,
    - OPEX and CAPEX estimation of projects. Energy and chemical consumption.
  • S.M.E.C. - Idependent Verifier Mechanical

    2009 - 2010 Dessalinisation Plant Kurnell - Sydney, Australia.

    1. CONSTRUCTION VERIFICATION ON SITE
    Verify idenpendently that:
    - the Contractor's work on site complies with the requirement of the contract and that mechanical devices (water treatment modules, RO Membranes, chemical storage, pumps, blowers, piping, accessories...) and the global system are built as defined by specications.
    - Inspect and validate the commissioning work.
    - Aknowledge that the progress of the work complies with the Master Program.

    2. QUALITY CONTROL VERIFICATION
    Verify idependently that :
    - the technical specifications, the related technical data sheets, the quality documents for the procurement and that the procedures (for testing (Inspection &Test Plan (ITP) or achievement of specifical tasks) are in accordance to quality specifications from Contractor and australian standards.
    - validate closure of Worklots.


    3. REPORTING
    Write mechanical part of the Weekly and Monthly Report which gathers the Non Conformance Reports (NCR), the Issue of Concerns (IoC) the Request For Information (RFI), give the status of work and report delays detailed per zone and work package.
  • Wilo - Salmson - Engineer Product Manager

    2006 - 2008 Engineer Product Manager - Submersible Sewage Pumps at Salmson

    1.PRODUCT RANGE DEVELOPMENT :
    - define the product’s functional specification for new products after analyse of the markets needs, technical survey of competition and benchmarks.
    - optimisation/standartisation of the product range

    2.PROJECT MANAGEMENT:
    - coordination of the different actors in France and Germany involved in the product development (Engineering, marketing, purchasing, quality, production and logistics),
    -Planning of the Time to Market.

    3.TECHNICAL SUPPORT FOR SALES FORCES, SERVICE & MARKETING.
  • Suez - Lyonnaise des Eaux - Production Manager Assistant

    2005 - 2005 1. MAPPING OF THE CLEAR WATER NETWORK OF WEST JAKARTA - INDONESIA:
    - Analyse of hydraulic characteristics in water distribution network to design a flow simulation model using Stella,
    - Trained a team to use the tool after its elaboration.

    2. WATER TREATMENT ENGINEER:
    -Perform studies, and build up solutions to increase the efficiency of water sanitation on three different water plants.