Technip
- Ingénieur automaticient/instrumentiste
Paris
2019 - maintenant
- Commissioning ICSS
- Commissioning P3 Package (air compressor, gas compressor, fire water pumps)
-
Technip
- System Commissioning Engineer
Paris
2019 - maintenant
Icss Commissioning
Project Martin Linge project (Technip)
* Commissioning ICSS
* Commissioning P3 Package (air compressor, gas compressor, fire water pumps)
-
STL (South Tambey Lng)
- Ingénieur automaticient/instrumentiste
2018 - 2018
Field engineering in instrumentation service
➢ Commissioning support in instrumentation.
➢ Draft material requisition form to order new instrumentation item (broken, missing, lost)
➢ Validation of vendor offer, in compliance with project specifications and standards
➢ Mark-up engineering document to make master document.
-
STL (South Tambey Lng)
- Package engineer
2018 - 2018
Project Yamal project (Technip)
* Field engineering in instrumentation service
* Commissioning support in instrumentation.
* Draft material requisition form to order new instrumentation item (broken, missing, lost)
* Validation of vendor offer, in compliance with project specifications and standards
* Mark-up engineering document to make master document.
-
Engineering & Consulting
- Package engineer
TRAPPES
2014 - 2018
Project Martin Linge-Package (Technip)
* Set up Junction Box Typical
* Network interface between P3 package and ICSS
* Set up package network for Martin Linge (IP mapping, cybersecurity...)
* Specification of P3 package network equipment requirement
* iFAT P3 packages * Field engineering: Draft package master vendor document (South Korea)
* Vendor Management for package instrumentation modification on site
(South Korea)
* Package commissioning, (South Korea)
* Hook-up service: Drafting job card, preparation offshore activities in instrumentation/telecom field (South Korea)
-
Engineering & Consulting
- Instrumentation engineer
TRAPPES
2014 - 2014
* Internal training E&C
o Engineering methodology
o Field instrument
o GS Total
o System architecture
* Commercial offer involvement
-
Engineering and consulting
- Ingénieur automaticient/instrumentiste
2014 - 2018
Projet Martin LINGE:
-AUTOMATION/INSTRUMETATION PACKAGE
-
Society- EDF Bugey
- Automation engineer
2012 - 2014
In charge of:
* Consolidation of the good practice in automation and instrumentation field
* Drafting training technical specification
* Drafting training media
* Trainer in following fields:
o Control
o instrumentation
o valve positioner
o system architecture
* Commercial offer involvement
* In charge of teaching equipment maintenance (field instrument, valve positioner...).
-
EDF
- Formateur
Paris
2011 - 2014
formateur dans le domaine automation
-
Sanofi
- Automaticien (apprenti)
Paris
2010 - 2011
Sauvegarde des système automatisé site de Marcy l’étoile
-
SPIE Nucléaire
- Maintenance engineer
2010 - 2011
Project: carrying out predictive, curative and fortuitous maintenance in nuclear power plant:
electrical PID, PFD, mechanical drawing
* Preparation construction work before intervention
* Analysis before intervention
o Taking into account the dosimeter issue
o Electrical wiring/modification, relay wiring
o Intervention in accordance with the intervention procedure
o Release end of intervention report
* In accordance with EDF quality and traceability
-
SANOFI PASTEUR
- Instrumentation and system engineer
Lyon
2010 - 2011
* Take an inventory of plant automatized equipment:
o PLC-Siemens, Schneider Electric, Trane, Crouzet
o HMI- Siemens, Schneider Electric, Honeywell
o Recorders
o VSD back-up configuration
* Gap analysis between back-up installed and back-up in the Engineering workstation
* Drafting procedure of back-up configuration management:
* Modification
* Revamping
* Addition of new system
* Setting up of back-up centralizing procedure: :
* Creation and strengthening of PLC, HMI, recorder, VSD database
* Back-up standardization
-
SPIE
- Apprenti
Cergy
2009 - 2010
étalonnage des capteurs et maintenance des robinets
-
FINORGA
- Instrumentation technician
Chasse-sur-Rhône
2008 - 2008
achievement: carrying out of Process Performance Qualification and modification of production sequence function chart.
* Process Performance Qualification:
* Trend curve analysis et new process regulation parameter setting (action
-
FINORGA
- Stagiaire
Chasse-sur-Rhône
2008 - 2008
dans le cadre du stage de BTS, réalisation des protocoles de qualification de performances de procédé.