SURESNES2011 - 2015Lead Draftsman
From January 2013 to January 2015
Erha North Project Phase 2 (Lagos/Nigeria).
From October 2011 to December 2012
Drafting Mentor on OCEON.
Lead Design Engineer, Responsible for Structural Design Drawing.
Entrepose-Contracting
- Ingenieur Projet (Projet Bonny Nigeria, Gate Pays-Bas)
2006 - 2011Planning Engineer & Material Controller
Material controller and planning Engineer for Gate LNG project Rotterdam Netherlands.
Planning Engineer. For LNG project on Bonny Island site in Nigeria.
Fabrication Engineer. BONGA Project :
Assistant of Project Manager on site in Nigeria, responsible for fabrication of Water Injection and Production SCR Double Joints,
Co-ordination with subcontractor,
Follow-up: Material, Traceability and Progress.
Fabrication Engineer GIRASSOL Project :
Responsible on site in Angola for the fabrication of Spools,
Follow-up: Traceability, Planning, Progress,
Simulating Fabrication of the Riser Tower to anticipate interferences.
1991 - 2000Fabrication Engineer for Stolt Offshore. GIRASSOL Project.
Engineering Supervision in Nanterre Office before going to Angola.
Lead Design Engineer for Technip. GIRASSOL Project :
Responsible for Structural Design Drawing,
Material Requisition.
Lead Design Engineer for Stolt Offshore. SIRRI Project :
Assigned to a Local Company in Iran to supervise the fabrication of several structures.
(Jacket and Deck).
Engineering Supervision in Nanterre Office before going to Iran.
Lead Design Engineer for Technip. COBO Project :
Responsible for Structural Design Drawing,
Make Material Requisition.
Lead Design Engineer for Bouygues Offshore :
Responsible for Yard Design Office in Congo.
Bouygues Offshore / Saipem (France, Cameroun, Congo, Angola)
- Projeteur Chef de Groupe
1981 - 1992Lead Design Engineer
Responsible for Structural Design Drawing.
Responsible for Yard Design Office in Angola.
Responsible for Structural Design Drawing in Cameroun.