Mes compétences :
Planification
Microsoft project
SQL
Management
Lean management
VBA
Access
Excel
Lean
Primavera
Industrie
Méthode SMED
Kaizen
5S
Entreprises
AREVA
- LEAD PLANNING E&P
Paris La Defense2010 - maintenantProject OL3 : construction of 3rd generation reactor plant – cost: >6 billions
- Management of engineering level 2 and 3 schedules.
- Management of 4 schedulers (in Paris).
- Critical path analysis and risks analysis.
- KPI and reporting.
- Detailed schedules development (instrumentation and control, Operating Licence Application, etc.)
Results: Development of engineering management tools synchronized with primavera
Time Schedules quality validated by Boston Consulting Group. Schedules reliability >50%.
EADS ASTRIUM
- PRIME SCHEDULER
Blagnac 2009 - 2010Projects Astra, Kahsat, Yahsat: manufacturing of 7 satellites – cost: 2,5 billions
- Creation and follow-up of level 1,2,3 EPCC schedules
- Management of 3 schedulers working on level 3 schedule in cleanness-room.
- Reporting to projects managers and space programs direction.
- Risks and critical path analysis.
- Schedules update in real time from assembly phase to launch in orbit.
- Management of mounting/dismounting orders.
Results: Reorganization of the data flow around Primavera. Schedules with 84% of reliability in Engineering & Procurement phases and 92% in Commissioning and Construction phases.
THALES ALENIA SPACE
- SPACE MANAGER DEPUTY
TOULOUSE2007 - 2009Projects Yahsat 1A and 1B – cost: 1,2 billion
- Engineering, procurement and construction follow-up and scheduling of on board equipments and antennas for 2 satellites.
- Assist customers: military, civil and governmental teams located in Canada, France and United Arab Emirates.
- KPI creation for assembling and final documentation.
- Creation and update of assembly detailed schedules.
- NCR Follow-up.
Results: Creation of shared database synchronized with Thales’s tools. Significant increase of productivity.
86% of reliability for construction phase.
MECAPROTEC
- AERONAUTIC PRODUCTION UNIT MANAGER
2006 - 2007Management of 50-80 persons in a surface treatment unit, 3 shifts 7d/7d.
- Implementation of lean management principles.
- Scheduling and production follow-up.
- Unit restructuring.
Results: -40% of non conformity, + 17% of productivity, + 25 of delay reliability
DEVISU
- PROJECT MANAGER/ PRODUCTION MANAGER
2002 - 2006In plastic industry and in aeronautic segment :
- Management of 50 operators and technicians.
- Creation and follow-up of manufacturing schedules.
- Process optimization.
- Progress indicators.
- Application of 5S method, Kanban, MRP2.
- Design and products industrialization.
Results: ERP implementation and development of schedules tools linked to the ERP. Schedules reliability increased by 40%.