-
Snecma
- Platform Head – Deputy Project Manager on ARIANE 5 ME Upper Stage
Courcouronnes
2013 - maintenant
Responsible for a transverse structure of engineers and experts, for EPF (Ensemble propulsif Fonctionnel / Functional Propulsive System) design and development activities :
• In charge of technical development (Functional System Design, Ground operations definition, electrical system and equipments integration)
• Visual management, LEAN Methods
-
Snecma
- Deputy Project Manager on ARIANE 5 ME Upper Stage Propulsive Systems
Courcouronnes
2010 - 2013
• Management of sub-contractors with program delegation: ASTRIUM Ottobrunn (Germany), AIR LIQUIDE Grenoble, TECHSPACE AERO Liège :
• Management of SNECMA development coordinators
• Customer Interface (ASTRIUM Bremen / Les Mureaux, CNES, ESA)
-
Snecma
- Project Manager, Systems Department
Courcouronnes
2007 - 2010
Development of an Elaborated Cooling down and Transient Code with 2D/3D fluid-structure coupling for space engines in collaboration with CEA, SAMTECH, INRIA and SES
-
Air Liquide
- Engineer, Functional Studies Department
Paris
2005 - 2007
Detached to CRYOSPACE (Les Mureaux, France), for the hydrogen tank (LH2) of the Cryogenic upper stage of the ARIANE 5 ESC-A launcher :
Operational studies :
• Technical authority of the tank during flight campaigns, Kourou, French Guyana
• Follow- up of manufacturing and assembly
• Flight exploitations (level 0 and 1) and anomalies management
Functional studies :
• Thermal budgets assessment, Numerical modeling
• Technical support for customers (ASTRIUM, ESA, CNES)
-
TRININFOR
- Studies Engineer
2004 - 2005
• Mission (6 months) at DCN (Direction des Chantiers Navals), within the BARRACUDA Project Direction (nuclear attack submarine): Risk Management
• Mission (4 months) at GIAT Industries, within Customer Service Department: Aging model study for critical elements of the LECLERC tank