Energetic Engineer, I integrated Elyo midi-Ocean for my final studies training period in order to perform thermal optimizations on Energetic materials in COFELY industry department. After my training period, I remained at COFELY industry department to perform Energetic equipment audits on industrial and tertiary sector for 2 months and then I joined the new built service to work as site supervisor for a 7 months period.
In September 2007, I integrated AEOS to work in the Nuclear area as international project engineer at SOFINEL (EDF/AREVA company) for the European pressurized reactor in Flamanville site until December 2011.
From January to July 2012, I worked as site coordinator at BUTAGAZ for creating a Liquefied Petroleum Gas unloading and loading platform with the associated fire detection system at Aubigny-Sur-Nère (18).
In August 2012, I integrated FRIEDLANDER (ORTEC Group) in oïl and gas department in order to be in a first time offshore construction manager and then maintenance contract manager, my current job.
Mes compétences :
site supervision
refrigerating technology
Contract management