Yannick DESBORDES

SAINT NAZAIRE

En résumé

With 36 years of experience in the fields of Industrial Shipbuilding, Cement Plant, Water Treatment and Others, I have mainly Oriented to the Oil and Gas Oil Project on On or Offshore Sites.
in Construction and Maintenance on Production Site, Refineries, Oil Terminals and Gas Storage Site Platform and FPSO.

On Unit Expansion Project or Hook-up Installation and Unit Shutdown Works.
manufacture, assembly and assembly of piping and structure on Yard and Pre-fabrication and Installation Workshop of Structures and Equipment for Control and Skid of Production on Site.

Follow-up Study of Manufacturing and Assembly Scenarios
Validation of the Execution File and controls of the Manufacture and Site Installations according to the Precise Technical Specification.

Study for Realization of Works
Estimate of Work on Site and Risk Analysis (JSA)
Estimate, Personal Material and Equipment
Management of preparation team
Construction of campaign scope
Site survey
Material controlle and Package
Precommissioning Control of Structure and Line Equipment
Control Alignment and Tightening Boltentioning
Line test control,
File Preparation
HSE Risks identification

Mes compétences :
Contrôle qualité
Soudage
Assemblage et montage mécanique
Instrumentation
Chaudronnerie
Tuyauterie
Technical Assistance
Quality Control
Offshore Oil & Gas
Nitrogen Leake Testing
Mechanical Assistance
Installation Support
Flowlines
FPSO
Construction site
Assembly Plants
Offshore Oil & Gas, Shipyard Construction, Drydock
management
Supervision Team management

Entreprises

  • Total E/P Nigeria - Lead Piping Construction & Commissioning Supervisor

    2014 - 2017 Supervisor Travaux Hook-up
    Supervision des Travaux de Montage Installation de Tuyauterie des Structure et Extension de
    Plateforme, Bridge Ect.... Contrôle des installations des Equipement de Production et des Equipement de Control Régulation E/I.

    Lead Piping Commissioning Supervisor
    Supervision Control des Epreuves Hydro test, Leake Test sur l'ensemble des Ligne et Vessel
    Capacity des Plateforme du Projet OFON Phase 2
    Préparation, Réparation et lever des Punch Listes, sur les Lignes et les Equipement
    Precom & Commissioning des Installation, Aide à la Préparation des Dossier Final FSU et RFSU
  • Total Nigeria - Assistant & Construction Site Representative

    COURBEVOIE 2013 - 2017 TOTAL E/P Nigeria for a HOOK -Up Installation function Assistant (CSR) Construction Site Representative and Lead Piping Structur Supervisor, on the OFON Phase 2 Project in Port Harcourt (Control the Work Activity of the Divers Contractor). Structur, Piping, Macanical Installation Equipment, Instrum and Scaffolding, Painting, Cleaning.

    My Mission on this Project was during the Hook-up Phase of Supervised the Costruction Teams of HHI and assist the CSR (Construction Site Representative), for the Activity of Installation Modul, the Extension Platform, Welding Legs and Structures Jacket, Installation of All Line by System, the Material, Equipment of Controle E/I the Manifold Skid of Production and the Divers Equipment Exchanger Vessel Capacity Etc....

    The Hook-up Party Finished, I was Mobilized in the Commissioning Team Function Assistant CSL (Commissioning Site Leader) for the Part of Hydro Test, Leake Test and other Control on the Line, and also the Control Structure and Equipment.

    Then at the Preparation Control and Closing Punch List and Final Document with the ICAPS Teams.
    My mission was to manage the daily with vigilance and at best, the works, with the team of intervention:
    Pipework, Structure, Welding, and Equipment Installation E/I Instrum, without Forget the Support Teams of Scaffolder, Painter, Rops Access for Aerobatic Works and also Assist the Site Manager or the Site Project Manager for the Construction Installation, the Planing and Progress Activity.

    Summary of my Professional Experience

    * to 2013 SUB SEA 7 (Gabon / South Africa / Brasil ) ;
    * Sub Sea 7 Campany Function Piping Structure Equipment Supervisor, Preparation Material and Equipement on Vessel Barge POLARIS in Port Gentil Gabon. ;
    * Dry Dock Activity Repair and Control Structure, The Deck of Wood, Repair and Adjust the Equipment, Arrow, Bearings and the Structure of the Crane on the ( POLARIS Barge) in Cape Town South Africa
    * Preparation Install and Lifting Material, Equipment and Others Preparation of Sea fastening, for à New HOOK UP Project, In Brasil with the Polaris Barge (Installation of Buoyancy Tank, Jacket and Sub Sea Equipment for
    PETROBRAS (Project Rio del Rey) in BRASIL.
  • Total Nigeria - Assistant & Construction Site Representative

    COURBEVOIE 2013 - 2017 TOTAL E/P Nigeria for a HOOK -Up Installation function Assistant (CSR) Construction Site Representative and Lead Piping Structur Supervisor, on the OFON Phase 2 Project in Port Harcourt (Control the Work Activity of the Divers Contractor). Structur, Piping, Macanical Installation Equipment, Instrum and Scaffolding, Painting, Cleaning.

    My Mission on this Project was during the Hook-up Phase of Supervised the Costruction Teams of HHI and assist the CSR (Construction Site Representative), for the Activity of Installation Modul, the Extension Platform, Welding Legs and Structures Jacket, Installation of All Line by System, the Material, Equipment of Controle E/I the Manifold Skid of Production and the Divers Equipment Exchanger Vessel Capacity Etc....

    The Hook-up Party Finished, I was Mobilized in the Commissioning Team Function Assistant CSL (Commissioning Site Leader) for the Part of Hydro Test, Leake Test and other Control on the Line, and also the Control Structure and Equipment.

    Then at the Preparation Control and Closing Punch List and Final Document with the ICAPS Teams.
    My mission was to manage the daily with vigilance and at best, the works, with the team of intervention:
    Pipework, Structure, Welding, and Equipment Installation E/I Instrum, without Forget the Support Teams of Scaffolder, Painter, Rops Access for Aerobatic Works and also Assist the Site Manager or the Site Project Manager for the Construction Installation, the Planing and Progress Activity.

    Summary of my Professional Experience

    * to 2013 SUB SEA 7 (Gabon / South Africa / Brasil ) ;
    * Sub Sea 7 Campany Function Piping Structure Equipment Supervisor, Preparation Material and Equipement on Vessel Barge POLARIS in Port Gentil Gabon. ;
    * Dry Dock Activity Repair and Control Structure, The Deck of Wood, Repair and Adjust the Equipment, Arrow, Bearings and the Structure of the Crane on the ( POLARIS Barge) in Cape Town South Africa
    * Preparation Install and Lifting Material, Equipment and Others Preparation of Sea fastening, for à New HOOK UP Project, In Brasil with the Polaris Barge (Installation of Buoyancy Tank, Jacket and Sub Sea Equipment for
    PETROBRAS (Project Rio del Rey) in BRASIL.
  • Subsea 7 - Superviseur Travaux

    SURESNES 2012 - 2013 SUB SEA 7 ( Offshore Piping Structure et Installation Equipement
    Travaux de Dry Dock sur la Barge Polaris à Cap Town Réparation Naval, remise en Place et
    Contrôle des Equipement de levage et Autres avant Sea fastening.
    Préparation des Equipement et Sea Fastening du Matériel avant Départ de la Barge de Cap town
    Pour la Traversé au Brésil.
    Travaux de Mise en Place de Buoyancy Tank et Pile de Réception pour Jacket et Divers autres
    Equipement de Production Offshore pour PETROBRAS au Brésil,
  • Stolt Offshore NBLI & VEOLIA - Superviseur Travaux et Assistant Site Manager

    2008 - 2011 Superviseur Tuyauterie et Structure Travaux Offshore (South Sana Project Angola)
    Superviseur Quality Control pour FCB Ciment au Vietnam sur une Cimenterie à Thai Nguyen
    Assistant Site Manager et Superviseur Q/C pour Sidem Veolia en Chine sur des Installation d'Unités
    de Sea Water Traitment, Fabrication Installation des Structure et Installation des Equipement sur
    Site.
  • Ponticelli Nigeria - Construction Yard Manager

    2008 - 2011 Ponticelli for TOTAL E/P ( On et Offshore Activity , Piping Structure Equipment.
    Preparation Yard, Manufacturing Work Shop and Installation Piping Lines, Structur and Equipment, in Site On or Offshore on the All Production Site of Total Nigeria
    Production Site of ; OML100, 102, OML58, FSO Unity, Amenam, Obite, Obagi, Ibewa, Bonny Island and OFON.
  • Stolt Offshore - Superintendant and Supervisor Offshore

    2008 - 2011 * Stolt Offshore Projet Hook -Up Piping and Structure Supervisor (South Sana Project Angola) ;
    * FCB Ciment Structure, Quality Control Supervisor for FCB in Vietnam on a Cement plant Factory in
    (Thai Nguyen Vietnam)
    * Sidem Veolia Assist Site Manager and Q/C Supervisor for Sidem Veolia in China
    Construction of 2 Sea Water Treatment Units, Control Manufacturing Fabrication Structure in Work Shop and Installation on Site.
  • Ponticelli Nigeria - Construction Yard Manager

    2008 - 2011 Ponticelli for TOTAL E/P ( On et Offshore Activity , Piping Structure Equipment.
    Preparation Yard, Manufacturing Work Shop and Installation Piping Lines, Structur and Equipment, in Site On or Offshore on the All Production Site of Total Nigeria
    Production Site of ; OML100, 102, OML58, FSO Unity, Amenam, Obite, Obagi, Ibewa, Bonny Island and OFON.
  • Stolt Offshore - Superintendant and Supervisor Offshore

    2008 - 2011 * Stolt Offshore Projet Hook -Up Piping and Structure Supervisor (South Sana Project Angola) ;
    * FCB Ciment Structure, Quality Control Supervisor for FCB in Vietnam on a Cement plant Factory in
    (Thai Nguyen Vietnam)
    * Sidem Veolia Assist Site Manager and Q/C Supervisor for Sidem Veolia in China
    Construction of 2 Sea Water Treatment Units, Control Manufacturing Fabrication Structure in Work Shop and Installation on Site.
  • Groupe Ponticelli Nigeria - Chef de Chantier

    2003 - 2007 Piping Structure. Préparation Fabrication sur Yard et Installation des Lignes et des
    Equipement sur l'Ensemble des Site On et Offshore de TOTAL au Nigeria. OML100,102, FSO Unity Amename, Obité Etc .....
  • Technip - Construction Manager

    Paris 1999 - 2002 * Technip Superintendent Instrum Installation Material, Equipment of E/I Instrum fot TECHNIP (ICS in Senegal) ;
    * Construction Manager Fabrication Assembly on Site of Boiler Structure for NBLI (Project of Cement Plant Factory of KIREN) Ciment of Sahel Sénégal
    Saipem Petromar Construction Manager in Soyo Yard in Angola Construction of Buyancy Tank, Jumper, Jacket and Other Manufacturing of Sub Sea Equipment)
    * AVCO SAS Marine Q/C Supervisor on the Queen Mary 2 in St Nazaire (France)
    Control Equipment Line and Equipment for; Piping All System, Cable Tray, HVAC, Ballasting Equipment, Beefore Sales, with the Contractor and Alstom Atlantique Campany Representative.
  • Technip - Construction Manager

    Paris 1999 - 2002 * Technip Superintendent Instrum Installation Material, Equipment of E/I Instrum fot TECHNIP (ICS in Senegal) ;
    * Construction Manager Fabrication Assembly on Site of Boiler Structure for NBLI (Project of Cement Plant Factory of KIREN) Ciment of Sahel Sénégal
    Saipem Petromar Construction Manager in Soyo Yard in Angola Construction of Buyancy Tank, Jumper, Jacket and Other Manufacturing of Sub Sea Equipment)
    * AVCO SAS Marine Q/C Supervisor on the Queen Mary 2 in St Nazaire (France)
    Control Equipment Line and Equipment for; Piping All System, Cable Tray, HVAC, Ballasting Equipment, Beefore Sales, with the Contractor and Alstom Atlantique Campany Representative.
  • Technip , NBLI, Saïpem Pétromar, Aveco - Chef de Chantier Construction et Instrumentation

    1999 - 2002 Technip Spichem (Installation des Equipement et Ligne d'Instrum pour les ICS au
    Sénégal Mine Extraction et Production

    NBLI Chef de Chantier Structure Chaudronné et Assemblage pour NBLI au Sénégal (Cimenterie de KIREN)

    Saïpem Petromar Chef de Chantier Structure sur le Yard de Soyo en Angola (Frabrication de Buyancy Tank et Divers Autres)

    AVECO Marine Superviseur QC sur le Queen Mary 2 a St Nazaire (France) Contrôle du Montage des Lignes et des Equipement Gaine de Ventilation, Equipement de Ballastage Etc......
  • BOS - Superintendant

    1997 - 1999 BOS / Stolt Offshore / Friedlander On / Offshore Works (
    * Bouygues Offshore Superviseor Hook -Up Piping Structure Equipment (BAGRE A Project) in SOYO (Angola) ;
    * Stolt Offshore Superviseor Hook -Up, Pipe Line Installation, Riser Flow Line Connection and Other Equipment.
    in South Sahna Condensat Projet for EXxon Mobil (in Angola)
    * Friedlander Maintenance Activity On / Offshore on Diferent Production Site of TOTAL Congo
    Installation Structure and Equipment, Construction Installation of Extention Platform, laying of Cable Tray and Divers Equipment ( Piping, Structure, Cabinet, Junction Box Etc.
  • BOS, Stolt Offshore, Friedlander Congo - Superviseur Piping Structur On et Offshore

    1997 - 1999 BOS Travaux On et Offshore (Tout travaux de Préparation et d'installation On/Offshore
    Pose de Pipe, Installation Raccordement de Ligne de Tuyauterie et d'Equipement, Mise en
    Place de Structure et Extension de Plateforme d'Accès, pose de Cable Tray et d'Equipement Electrique, Armoir, Jonction Box, Pose de Pipe Line et Raccordement sur lesTête de Puit
  • BOS - Superintendant

    1997 - 1999 BOS / Stolt Offshore / Friedlander On / Offshore Works (
    * Bouygues Offshore Superviseor Hook -Up Piping Structure Equipment (BAGRE A Project) in SOYO (Angola) ;
    * Stolt Offshore Superviseor Hook -Up, Pipe Line Installation, Riser Flow Line Connection and Other Equipment.
    in South Sahna Condensat Projet for EXxon Mobil (in Angola)
    * Friedlander Maintenance Activity On / Offshore on Diferent Production Site of TOTAL Congo
    Installation Structure and Equipment, Construction Installation of Extention Platform, laying of Cable Tray and Divers Equipment ( Piping, Structure, Cabinet, Junction Box Etc.
  • ETPM & Mc DERMOTTE and BOS Bouygues Offshore - Supervisor Construction Installation

    1986 - 1996 * Supervisor Construction Installation; for Diferent Campany and Diferent Project Oil and Gas
    Fabrication Structur in Construction Yard, and Installation On / Offshore (Jacket, Top-Side, Jumper, Buyancy
    Tank, Vessel Capacity Tank and Preparation Equipment for Installation Pipe Line or Sub Sea Equipment
    In West Africa ( Nigeria, Gabon, Congo, Angola, Guinea Equatorial )
  • ETPM, Mc Dermotte, Bos Congo - Superviseur Travaux Piping Structur

    1986 - 1996 (ETPM / Mc DERMOTTE / BOS Congo / Stolt Offshore / Friedlander)
    au (Nigeria, Gabon, Congo, Angola, Guinée Equatorial)
    Superviseur Piping Structure, Tout travaux de Préparation et d'installation On et Offshore, Pose de Pipe Line, Raccordement de Ligne, Installation de Vessel Capacity Tank et Equipement Skid de Production.
  • ETPM & Mc DERMOTTE and BOS Bouygues Offshore - Supervisor Construction Installation

    1986 - 1996 * Supervisor Construction Installation; for Diferent Campany and Diferent Project Oil and Gas
    Fabrication Structur in Construction Yard, and Installation On / Offshore (Jacket, Top-Side, Jumper, Buyancy
    Tank, Vessel Capacity Tank and Preparation Equipment for Installation Pipe Line or Sub Sea Equipment
    In West Africa ( Nigeria, Gabon, Congo, Angola, Guinea Equatorial )
  • GTME & ETPM - Superviseur

    1983 - 1985 Tuyauterie et Structure tout Travaux On / Offshore
    Divers Travaux de Tuyauterie et Structure a la SOGARA pour ELF Gabon
    Restauration de Barge (Dry Dock), sur le Yard de Tchengué Port Gentil Gabon Fabrication et Installation de Jacket, Mise en Place en Mer, Tapage des Piles et Installation
    préparation des Equipements sur Yard ou sur Barge pour la Pose de Pipe Line. 6''
    8'' 10'' 12'' 16'' Inch Avec les Barges Suivante la 101, 201, la Polaris et la DLB 1
  • ETPM - Piping Structure Supervisor On / Offshore

    1983 - 1985 Structure ; (Construction Yard and On & Offshore Work Activity)
    Installation Piping, Structure and Equipment for ELF Gabon, SOGARA Oil Refinery in Port Gentil Gabon
    Repair Vessel Barge (Dry Dock Activity ), on the Yard of Tchengué in Port Gentil Gabon
    Construction Jaket, Top Side and Installation Hook_up for ²Lucilla Projet for SHELL Gabon
    Equipment preparation on Yard or Barge for Pipe Line Installation.
  • ETPM - Piping Structure Supervisor On / Offshore

    1983 - 1985 Structure ; (Construction Yard and On & Offshore Work Activity)
    Installation Piping, Structure and Equipment for ELF Gabon, SOGARA Oil Refinery in Port Gentil Gabon
    Repair Vessel Barge (Dry Dock Activity ), on the Yard of Tchengué in Port Gentil Gabon
    Construction Jaket, Top Side and Installation Hook_up for ²Lucilla Projet for SHELL Gabon
    Equipment preparation on Yard or Barge for Pipe Line Installation.
  • GTME & ETPM - Piping Structure Supervisor On / Offshore

    1981 - 1982 * ETPM Fonction Technician Structur, Construction Leg and renforcing Bracing for Jaket and Top Side
    Installation All Structure (Grating, Handrail, Support of Cable Tray or Piping Line, HVAC ventilation duct
    and Divers other Material Equipment (Zakhoum Project).
    * GTME Function Technician Instrumentation
    Installation, Material, Equipment of Contrôl Regullation E/I, montage of Tubing Liner and Connection of
    Divers Apparatus and System of Control Production (Zakhoum Project).
  • GTME & ETPM (UAE Sharjah Abu Dhabi) Projet Zakhoum - Tuyauteur

    1981 - 1982 GTME Instrum et Travaux de Structure, Mise en Place des Lignes Instrum et des
    Equipement de Control régulation Pour

    ETPM Fabrication, montage et Assemblage de Structure, (Jacket, Top Side, et Installation des Ligne de Tuyauterie tous Diamètre Installation de Skid et Extention de Plateforme, et de Vessel Capacity Tank.
  • GTME & ETPM - Piping Structure Supervisor On / Offshore

    1981 - 1982 * ETPM Fonction Technician Structur, Construction Leg and renforcing Bracing for Jaket and Top Side
    Installation All Structure (Grating, Handrail, Support of Cable Tray or Piping Line, HVAC ventilation duct
    and Divers other Material Equipment (Zakhoum Project).
    * GTME Function Technician Instrumentation
    Installation, Material, Equipment of Contrôl Regullation E/I, montage of Tubing Liner and Connection of
    Divers Apparatus and System of Control Production (Zakhoum Project).
  • Armée Française - Militaire

    1980 - 1981 Armée de Terre 41 RI et 11ème RPIMA (Châteaulin et Brest en Bretagne)
  • Framatome - Tubing Technician

    1977 - 1980 SPIE Batignolle (Thermatome Chaudiére * Function ; Tubing Technician, in Thermic Instrumentation
    Installation of Liner, Tubing and Connection to Control Apparatus by Fluid System Pneumatic / Hydrolic
    Prepar the Cross Air Test and Hydrotest.
    Works Activity, realized on Divers Construction Site of Nuclear Power Plant
    (Power Station of ; (Bugey, Tricastin, St Laurent des Eaux, Graveline) French
  • SPIE Batignolle (Thermatome) - Tuyauteur en Instrumentation

    1977 - 1980 Installation des Ligne Instrum (Liner) et Raccordement au Appareil et Instrument de Contrôle.
    Sur le GV (Générateur de Vapeur) et Niveau Piscine Réacteur
    sur les Central Nucléaire PWR de Bugey, Tricastin, St Laurent des Eaux, Dompierre, Chinon
  • Framatome - Tubing Technician

    1977 - 1980 SPIE Batignolle (Thermatome Chaudiére * Function ; Tubing Technician, in Thermic Instrumentation
    Installation of Liner, Tubing and Connection to Control Apparatus by Fluid System Pneumatic / Hydrolic
    Prepar the Cross Air Test and Hydrotest.
    Works Activity, realized on Divers Construction Site of Nuclear Power Plant
    (Power Station of ; (Bugey, Tricastin, St Laurent des Eaux, Graveline) French

Formations

  • Technical Institut University

    Saint Nazaire 1981 - 1982 BTS (ROC) Structure Navales

    BTS (ROC): structural Construction, Ships-Yard IUT (

    Training , Empowerment

    * Instrumentation Training; Installation of Control Equipment in Nuclear Power Plants (Thermatome)
    * QHSE Trainig; in nuclear power plants: DATR Niv RP2 / HN2 (Apave)
    * Oil Gas Saffety Training; Chemical and Petroleum Risks On / Offshore (Tolmann) Valid 2020
    * BOSIET Empowerment; Ba
  • Technical Institut University

    Saint Nazaire 1981 - 1982 BTS (ROC) Structure Navales

    BTS (ROC): structural Construction, Ships-Yard IUT (

    Training , Empowerment

    * Instrumentation Training; Installation of Control Equipment in Nuclear Power Plants (Thermatome)
    * QHSE Trainig; in nuclear power plants: DATR Niv RP2 / HN2 (Apave)
    * Oil Gas Saffety Training; Chemical and Petroleum Risks On / Offshore (Tolmann) Valid 2020
    * BOSIET Empowerment; Ba
  • IUT De St Nazaire

    Saint Nazaire 1980 - 1982 BTS

    * BTS ROC Realization of Work Boilerworking and Piping (
    Empowerment:

    * Layout Technique and Disassembly of Line and Equipment in Nuclear Power Plants (APAVE)
     safety and quality in nuclear power plants DATR Niv RP2 / HN2 (APAVE)
     training and Habillitation for Installation Precedure on Site in chemical and petroleum risks On / Offshore
     Bosiet (Basic Offshore Safety Induction Emerge
  • Technician Tubing (Regulation And Instrum) College Technic Jules Vernes

    Bourg En Bresse 1978 - 1979 Diploma of Professional Studies

    Montage de Ligne Tubing et d'équipements de Control Régulation
  • Technician Tubing (Regulation And Instrum) College Technic Jules Vernes

    Bourg En Bresse 1978 - 1979 Diploma of Professional Studies

    Montage de Ligne Tubing et d'équipements de Control Régulation