BELFORT CEDEX2017 - maintenantQA/QC Manager for the construction of the Boutlelis power station.
the project is under a consortium composed of General Electric, Cegelec Energy (VINCI Energies GSS) and Sonelgaz (CEEG). Located 35 km to the west of Oran ALGERIA, this power station will be equipped with two open-cycle gas turbines and have a production capacity of 445 MW.
GE Energy
- QA/QC MANAGER
BELFORT CEDEX2016 - 2017Second phase of the Fast Track in Bouchemma TUNISIA
GE Energy
- QA/QC MANAGER & SITE DEPUTY MANAGER
BELFORT CEDEX2014 - 2016Fast Track for the extension of the Power Plant of Hassi Berkine. Erection of one gaz turbine 135 MW and the gas station.
Air Liquide
- Manager QA/QC
Paris2013 - 2014Construction of a new ASU-1400 air separation for Metinvest's Enakievo Metallurgical Plant (EMZ).
The new unit will enable Air Liquide to produce oxygen, nitrogen and argon for EMZ.
General Electric
- Responsable QA/QC
Paris2008 - 2013• Monitored and checked quality during the construction of Thermals Powers Plants (in Morocco; Algeria, Tunisia) by ensuring compliance with norms and procedures.
• Lead mechanical reviews with the customer and provided final deliverables (“End Erection
Report”) to acknowledge complete and compliant equipment.
Gaz de France (SPIE OGS)
- Coordinateur Tuyauterie CIAGS
2007 - 2008Analyzed, prepared and driven execution of piping and Metallic Work activities.
Developed feasibilities studies, solicited cost estimation, evaluated proposals and negotiate to meet activities requirements
FRIEDLANDER GROUPE ORTEC
- SUPERVISEUR TUYAUTERIE
2005 - 2007SOGARA GRAND REVAMPING Port-Gentil GABON
PROJET TOUCAN & EXTENSION RABI CENTRALE STATION PHASE III
REVAMPING SONANGOL OFF SHORE BLOC 17 ANGOLA
EXTENTION BARRY CALLEBEAU TEMA GHANA
Shell Gabon Rabi Phase III Refinery. Onshore Refinery Gabon Africa, extension continues Rabi Phase III project to re-inject associated gas in an effort to extend the productive life of the field.
Barry Callebaut second cocoa bean processing line for the factory in Tema. A second bean processing line was added, doubling the annual bean processing capacity from 30 000 tonnes to 60 000 tonnes.