Menu

Albert PINERO

TOULOUSE

En résumé

Pro-active

Mes compétences :
Adaptabilité
Travail en équipe
Anticipation
Communication
Visual Basic for Applications
CMMi - Capability Maturity Model Integration
Transnational project management
Microsoft Excel
EVM deployment
Norme ISO 9001
Master Planning
program planning
manage mechanical sub
gap management
challenged planning
Transnational project coordination
Shared planning
Responsible for DASSAULT
Project management mode deployment
Project Management
Portfolio Administration
Nuclear project management
Microsoft Project
Microsoft Office
Methods
ISO 900X Standard
Earned Value Management
Customer change configuration management
Complex project management
Challenging program management
CATIA
Army
Airbus A380 Aircraft
Airbus A350 Aircraft

Entreprises

  • Customer Latelec - PROGRAM MANAGER & Program Manager

    2014 - maintenant Customer Latelec (Latécoère Group)
    Program Manager & Financial and Technical Bid Responsible
    Responsibilities:

    * Financial and Technical Bid Responsible for DASSAULT : RAFALE AIRCRAFT Harnesses manufacturing
    and installation

    * Material and labour hours quotation for material, manufacturing and installation of harnesses
    * Financial and Technical Bid responsible
    * Customer change configuration management during quotation
    o Steering of Purchasing, ME and Production and Installation Department to meet customer planning
    requirement

    * Program Manager for Airbus' Fly Test Installation work package - A350 XWB-1000 : harnesses & sensors
    Manufacturing and Installation (3 MSNs)

    * Program profitability accountable on an complex and sensitive program
    o Accountable for the whole WP : purchasing, ME, manufacturing and installation for A350 XWB -1000
    o Final decision making and strategy deployment for challenging activities on FTI
    * Master planning, program planning and sub-activities planning creation and synchronization
    * Weekly Cross-sub-WP meeting (4 boxes template), program meeting & PRM dry-run
    o Planning, cost ,quality, deliverables liable for AIRBUS
    o KIPs (burning curves& S-curves) , EVM, risks, mitigation actions, standalone actions, planning steering
    o KPIs and planning transfer to WP leader : cultural change at LATELEC Services
    o Direct reporting (T,C,Q, EVM) to LATELEC headquarter steering committee
    o Financial focal point and enabler via VBA tools for BU financial : data alignment resources vs workload
    and visibly of hiring forecast

    * Installation Program Manager : A350 -1000 Fly Test - Wings WP at FAL

    * Additional Fly Test Wings WP program linked to FTI -1000 program here-after mentioned (3 MSNs)
    o Challenging FAL planning to respect First Flight date

    * Program Manager for French Army WP: Atlantic installation to upgrade cockpit equipment to fly on civil
    corridors

    * 6 aircrafts to manage with mechanical & electrical complex interferences into challenged planning
    (under penalties)
    * To manage mechanical sub-contractor
    * To deal with specific Army constraints and culture
    * Weekly Reporting and visibility on customer's demand

    Technical context:
    FTI, GRAMS, ISO 9100
  • Latelec (Etop int) - Senior program manager / Team leader

    2014 - maintenant
  • PCC Structural - Consulting

    2014 - 2014 CONSULTING
    Consulting on cultural change at PCC France

    Responsibilities:

    * Project management mode deployment on Process and Method Department specializing in titanium
    casted parts to the aeronautic industry:
    o Project mode deployment based on staged CMMI model level 3
    o Project management practice assessment : PMI referential V.5
    o Planning on MS Project
    o Dashboard & KPIs initialization
    o Awareness: Project management best practices

    Technical context:
    CMMI, PMI, Awareness
  • ETOP consulting at PCC France - Consultant

    2014 - 2014 * Project mode deployment based on CMMI level 3 ;
    * Project management practice assessment : PMI referential ;
    * Planning on MS Project (baseline, forecast, re-baseline) ;
    * Initiating : Dashboard & KPIs (S-curves, EVM, ...) ;
    * Risks, mitigation plans & recovery plans management ;
    * Wide automation tooling using VBA (extracts, KPIs, dashboards) ;
  • ETOP Project Manager at Airbus Saint Martin - Project Manager

    2012 - 2013 * Centralized planning & master planning kick-off :OPX2 (UP-3P) ;
    * Portfolio (10 projects) management :LBIP-GPP methodology ;
    * Relevant KPIs to monitor deviation & associated recovery plans ;
    * CBS inputs and EVM deployment ;
    * Risks and opportunities management on ARM tool ;
    * Steering reporting creation and updates ;
  • AIRBUS - PROJECT MANAGER & Project Manager

    Blagnac 2012 - 2013 Responsibilities:
    * Processes, methods and CATIA V5 tools deployment (Centres of Excellences, including Manufacturing
    engineering and customer services)

    * Shared planning & master planning initialization : (UP-3P)
    * Portfolio management (10 projects) : LBIP methodology
    * Documentation deliverable follow-up
    * Relevant KPIs implementation and gap management
    * CBS & EVM setting up for head of program
    * Stakeholder on Steering Committee
  • MTECH PMO at Airbus Saint Eloi - PMO

    2012 - 2012 * Primary, Secondary & System pylon manufacturing planning on UP-DEV ;
    * Pylon manufacturing day-to-day monitoring ;
    * Dashboard & KPIs, milestones (Top 50) management ;
  • ARCHIV TECH - Responsable réseau

    ENS 2006 - 2009 * Subcontracting contract management ;
    * partner research
  • Bergerat -ENERIA - Project & Business Engineer

    1999 - 2005 Electrical Power / Cogeneration /No-breaks plants
    * Entire erection of electrical power plants(EJP/UPS) & electrical back-up for critical sites ;
    * Electrical, cooling and acoustic equipment calculations ;
  • MGP Instruments - Team Leader

    1994 - 1998 * Project management involving R&D, production, commissioning, and training for key customers ;
    * Radiation monitor developments management involving R&D department ;
    * ISO 9001 standard application ;
    * Responsible for factory acceptance test
    * Key customer area : Japan, Europe & USA ;
  • Cegelec - Instrumentation

    Saint-Denis 1990 - 1993 Industrial Instrumentation Responsible
    & electrical industrial equipments
    * Instrumentation project management of new paper mill ;
    * Commercial and technical quotations : electrical and instrumentation processes ;

Formations

  • ENSEEIHT

    Toulouse 1988 - 1989 Automation Engineer degree
  • ENSEEIHT

    Toulouse 1988 - 1989 Ingénieur

    Automatique
  • ENSEEIHT

    Toulouse 1985 - 1988 Fluids Engineer degree
  • ENSEEIHT

    Toulouse 1985 - 1988 Ingénieur en Mécanique des Fluides

Réseau

Annuaire des membres :