-
Subsea 7
- Senior Project Engineer - Project Construction Manager
SURESNES
2011 - maintenant
Project Construction Manager for OCIP (Offshore Construction and Installation Program), for MPN (Mobil Producing Nigeria) - Exxonmobil. Retrofit and revamping of several platforms offshore Nigeria. In charge of technical and operational activities.
-
SUBSEA 7
- Project Engineer - Hook-up Lead & Manager
SURESNES
2010 - 2011
Installation of 4th Gas Compressor on GN offshore complex with associated equipements, structures and piping. Acergy in charge of fabrication, installation, commissioning and start-up.
Hook-up Manager – Lagos (Jan 2011 to August 2012) :
Responsible for all Construction and Fabrication technical matters.
Hook-up Lead – Offshore EAP Complex (May 2010 - Jan 2011) :
- Ensured that all appropriate customer specifications, company standards, best industry practice, and Health, Safety & Environmental (HSE) considerations are applied and adhered to.
- Coordination of subcontractors (Dietsmann, Segofs, Lassarat,…),
- Logistics and materials coordination (planification of shipments, corrdination with Acergy and MPN in Port-Harcourt, fabrication follow-up with Warri yard),
- Development of construction philosophy and schedule.
- Reporting to the project manager on objectives assigned.
Lead of preparation team – Lagos NETCO office (from January to May 2010) :
- Liaise with AMEC/NETCO, EPIC holder, for engineering, procurement and installation matters,
- Development of workpacks/jobcards in coordination with AMEC/NETCO.
-
ACERGY
- Project engineer - Hook Up (construction)
2009 - 2010
Mafumeira Norte Development Project (Chevron)- Malongo, offshore, Angola
Revamping brownfield of existing facilities offshore Angola for a total amount of 400MT of piping and 400MT of structure and equipment (crew of 100 direct people working offshore), including construction, precommissioning and commissioning activities.
The scope of work included the installation of a high pressure water injection pump driven by a gas turbine, fine bed filters, crude oil transfer pumps,...
- Hook-up/Construction Engineer,
- Coordination of subcontractors,
- Logistics and materials coordination,
- Reporting to project management.
-
Etablissement d'aéronautique navale de Dugny-Le Bourget - Marine Nationale
- Commandant en second
2007 - 2009
Gestion de 100 personnes, dont 15 civils,
Coordination des activités de la base,
Chef de projet infrastructures,
Responsable HSE (président du CHSCT).
-
Bâtiment atelier Jules Verne
- Chef du service Flotteur
2006 - 2007
Gestion d’une équipe de 25 techniciens et techniciens supérieurs,
Responsable de la cargaison et de la gestion du fret,
Chef de l’équipe sécurité du bord,
Réalisation d’une mission (4 mois) de soutien technique aux marines africaines
-
Frégate Dupleix
- Chef du service Electricité
2005 - 2006
Gestion d’une équipe de 12 techniciens et techniciens supérieurs,
Réalisation d’un arrêt technique d’entretien de 5 mois en collaboration avec des entreprises industrielles civiles.
-
Ecole Navale - Jeanne d'Arc
- Elève
2002 - 2005
Eleve-officier à l'Ecole navale puis à l'E.A.O.M. (porte-hélicoptères Jeanne d'Arc et frégate Georges Leygues), spécialité « Sciences & Technicques (Energie) ».
Formation généraliste d'ingénieur et officier énergie :
Hydraulique, production de froid, d'eau et d'électricité, propulsion vapeur, moteur diesel et turbine à gaz, production et distribution d'électricité.
Projet de fin d'étude au CNRS de Rouen, puis au sein de la société AVL (powertrain engineering) à Graz (Autriche), avec pour sujet l'étude du phénomène de cavitation dans les injecteurs de moteurs automibiles type HDI common rail. Utilisation des logiciels de simulation d'écoulements hydrodynamiques Fire et Fluent.
Formation militaire : commandement, tir, sport.