Menu

Amine Djamel Eddine BENMANSOUR

HASSI MESSAOUD

En résumé

BTS d’état en instrumentation section Gaz,21 ieme promotion 1986/1989 IAP/ARZEW
Etudes en anglais durant le cursus

Mes compétences :
ABB
Anglais
Anti intrusion
DCS
Logique
Logique combinatoire et microprocesseur
Microprocesseur
Sécurité
Turbine
Video
Vidéo surveillance
Qualité
Maintenance
Amélioration continue
système Control d’accès &anti intrusion
PDCS/NASTARAN/IRAN

Entreprises

  • Sonatrach - Contre maitre / Instrumentation

    maintenant
  • Sonatrach - Contre maitre

    1991 - maintenant BTS state of instrumentation section Gas, 21st promoting 1986/1989 IPA / ARZEW
    Studies in English
    Recruitment promotion after exit 89 at GTP / Central Electric Project Mers El Hadjadj / GTP-Sonelgaz / ANSALDO
    Recruiting in Sonatrach DML Maintenance Department (DMN) May 6, 1991
    Contribution, retrofiting, turbine overhaul, pumping stations and compressor stations respectively along crude oil pipe and gas pipe lines of Sonatrach RTO
    And RTH
    changing anti pumping system GE turbines ( pipeline 48 ")system Protronique
    Modification regulation system, FG system
    System Sequel Digicon control/comm turbine MANN GHH
    1994,BASE DMN HEH project monitoring and start / engineering
    Upgrade system de control/comm GE mark II/Mark IV
    COMMISSIONING & Startup PROJET Sonatrach/ABB: OK1 34"- 1994
    COMMISSIONING & Startup PROJET Sonatrach/Entrepose/sofregaz: LR1 24"-1995 at 1998(LPG )
    COMMISSIONING & Startup PROJET Sonatrach/Bechtel :Gas compressor stations de1998 a 2000
    COMMISSIONING & Startup PROJET Sonatrach/ABB:OH3 HBN 30" de 2000 a 2003
    Overseer instrumentation N2

    COMMISSIONING & Startup PROJET Sonatrach/ABB ROK1 30" de 2003 a 2005

    Upgrade gauging system Foxboro for storage tanks, and supervision under LAN
    Executive instrumentation
    2006-2009, Maintenance and retrofiting machinery RTH/HEH
    2009-2010, Project Collaboration remote monitoring, Control of access and anti-intrusion system (Cegelec France)
    2011-2012, project retrofiting pumping station 12"LNZ1/LPG (process automation), control panel gas detection MSA installation (control room /field area)
    2013/2014
    Comment & checking engineering system PDCS/RTH/NASTARAN
    2014/2015, Coordinator and preparation scheduling
    Spare parts for SH machinery drawing up of specifications
    Title & formation
  • SONATRACH - SUPERVISEUR PROJET(contre maitre instrumentation)

    1991 - 2010 date recrutement apres sortie de promotion 89 GTP/Projet Central electrique mers el hadjadj /GTP-Sonelgaz/ANSALDO

    Date de recrutement Sonatrach Direction maintenance DML (DMN) 6 mai 1991
    Intervention ,retrofiting , revision turbine sur ouvrage de ligne oleoduc et gazoduc respectivement, station pompage et compression gaz SONATRACH RTO
    et RTH

    Modification systeme anti pompage des turbines GE sur ligne gazoduc 48"system Protronique
    Modification systeme regulation systeme FG et systeme sequel digicon (control/comm)sur turbine man ghh
    1994,BASE DMN HEH et debut de suivi de projet/ingeniring
    Upgrad systeme de control/comm GE mark II/Mark IV

    COMMISSIONING & Startup PROJET Sonatrach/ABB: OK1 34"- 1994
    COMMISSIONING & Startup PROJET Sonatrach/Entrepose/sofregaz:LR1 24"-1995 a 1998
    COMMISSIONING & Startup PROJET Sonatrach/Bechtel:Stations compression gaz de1998 a 2000
    COMMISSIONING & Startup PROJET Sonatrach/ABB:OH3 HBN 30" de 2000 a 2003
    COMMISSIONING & Startup PROJET Sonatrach/ABB ROK1 30" de 2003 a 2005

    Upgrad systeme telegaugeage foxboro pour park de stockage et mise sous reseau pour supervision

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :