Entreprises

  • TELMA - Field Project Manager - Wireless Network

    2010 - maintenant - Manage CW aspects for new coverage GSM project ( site RFI ) and all aspects for CDMA project ( site RFS and ON Air )
    - Plan the Implementation activities for given roll out of sites as per targets in the circle
    - Manage and Co-ordinate with subcontractors and service suppliers to get the items installed and commissioned according to project schedule
    - Commissioning and handed over the sites ( RFI or On Air ) according to the flow of sites defined in the Site Master Plan target
    - Prepare weekly / monthly report
    - Oversee dispatching for material and equipment
    - Co-ordinate transportation on site
    - Report cost and budget
  • TELMA - Team Leader

    2009 - 2008 Monitoring & coordinating execution activities in all respects
    Manage, control, and inspect all civil implementation works on site including all according to the schedule
    Responsible for following up and achieving targeted milestones of the implementation projects
    Manage acquisition Team and site supervisors Team
  • TELMA - Wireless Division Manager

    2009 - 2010 - Manage acquisition Team and site supervisors Team
    - Set up and manage the roll out organization
    - Comply with quality standards and to deliver GSM & CDMA sites documentation: templates, latest standards / documents, Electrical design are implemented
    - To coordinate all activities that requires GSM & CDMA Network Engineering, Field Operations, System Planning
    - Maintains work instructions and procedures related to his team and monitors their proper execution
    - Ensure standard tower foundation design for 150kPa – 100kPa – 50kPa and its validation with accreditation cabinet
    - Validate design for upgrade site and sharing site and swap BTS
    - Ensure application for foundation design validated as per DCP Test
    - Oversee acceptance and ensure rectification of snags
    - Submit weekly and monthly reports
    - Preparing and follow up budget
    - Build up and maintains a high level of technical competence of the team
  • TELMA - Site Engineer

    2006 - 2008 - Participate in the preparation and agreement on technical project requirements description, including deliverables: generic drawings site type, standard lighting and earthing system on Greenfield & Rooftop sites, site engineering documentation (APD in French), acceptance procedure, detail acceptance criteria, check list acceptance, As Built contents
    - Review Civil Work requirement specifications, matrix responsibility, completion report of acceptance
    - Participate in the development of a quality assurance, procedure and deployment documents
    - Approve Civil Work engineering documentation per site, TSSR, As Built
    - Approve new site design for each equipment specification proposed by contractor
    - Participate in Technical Site Survey, kick off meeting, rebar inspection, perform CW and TI acceptance
    - Agreement on the detailed acceptance scope and activities
    - Check and approve Equipment List per site
    - Transmit requirement of Civil Aviation
    - Coordinate and plan site visit
    - Replace Roll Out Manager in case of holidays or others: prepare minutes of meeting, agenda
  • STTRM/ CAMUSAT - Site supervisor

    2006 - 2006 - Checking LOS for 4 sites backbone SDH in province areas
    - Supervise installation of shelter for MGW
  • Orange Madagascar - Site Engineer

    Paris 2004 - 2006 - Site Implementation & Outside Plant Professional & On-site implementation
    - Collect documentation for the Technical Site Survey Report
    - Take the lead during site visits (Acquisition process) and discuss the technical solution with the parties involved
    - During the technical visits in Acquisition, manage the technical solution in such a way that the best cost efficient solution is found.
    - Responsible for the quality and technical follow up of a site in construction including radio equipment: outdoor and indoor sites
    - Supervising all civil works and all Installation of antennas, feeder cables, BTS, MW, earthing
    - Site acquisition processing
    - Make the request and follow the installation of electrical connections with the electrical company
    - Achieving all administrative authorizations: Urbanism- Civil Aviation
    - Check adequacy for BoQ for each site installation

    Others realizations:
    - Monitor power use and extension for the site MSC
    - Audit and upgrade the technical environment for site MSC with an expert in technical environment
    - Create requirements specifications for a new site MSC with an expert in technical environment and follow up the installation
    - Checking and approve feasibility and implementation of 24 sites backbone SDH ( Backbone phase 1 & 2 ), including obtaining administration agreement
    - Approve layout and participate for the swap BTS
  • Orange Madagascar - Study and Maintenance Officer

    Paris 2001 - 2004 - Coordinate and checked of the curative and preventive technical maintenance: power, AirCon, GenSet
    - Carried out on site intervention with O&M team
    - Search and negotiate the whole of the establishment of a GSM site
    - Analyze and develop agreements and leases
    - Achieving all administrative authorizations: Urbanism- Civil Aviation
    - Review Installation requirement specifications
    - Participate in Technical Site Survey, kick off meeting
    - Deliver TSS report and Site Acquisition report
    - Studying the feasibility of site implementation with subcontractors as per the radio specification
    - Approve Installation Engineering documentation per site including design foundation
    - Monitor and control site installation: infrastructure, telecom equipment, power resources
    - Make the request and follow the installation of electrical connections with the distribution company
    - Make acceptance CW & TI and ensure rectification of all snags
    - Replace Deployment Manager in case of holiday: preparing budget, participate in others internal meeting

Formations

  • Ecole Supérieure Polytechnique ESPA (Antananarivo)

    Antananarivo 1995 - 2001 Génie Industriel

    Génie Industriel

Réseau

Annuaire des membres :